0. CALL TO ORDER/ROLL CALL- 6:00 P.M.
Minutes:

The meeting was called to order at 6:03 p.m. by President Mack-Rose.  It was noted that Trustees Katz-Lacabe and Sullivan were not present. 

1. PUBLIC TESTIMONY - CLOSED SESSION ITEMS
Minutes:

There were not public comments concerning items on the closed session agenda.

2. RECESS INTO CLOSED SESSION- 6:00 P.M.
Minutes:

The Board recessed into closed session at 6:04 p.m.

3. CLOSED SESSION ITEMS
3.1. Public Employee Discipline/Dismissal/Release/Hiring; Government Code Section 54957Confidential agenda item.
3.2. Conference with Labor Negotiator; Government Code Section 54957.6Confidential agenda item.
4. RECONVENE TO OPEN SESSION/PLEDGE OF ALLEGIANCE 7:00 p.m.
Minutes:

The Board reconvened into to open session at 7:02 p.m. President Mack-Rose said that Trustee  Sullivan arrived at 6:10 p.m. and Trustee Katz-Lacabe arrived at 6:27 p.m.

5. REPORT CLOSED SESSION ACTION
5.1. REPORT ON CLOSED SESSION ACTIONConfidential agenda item.
6. APPROVAL OF AGENDA
6.1. APPROVAL OF AGENDA
Minutes:

The Board approved the agenda for the Special Board meeting of May 29, 2012.

Actions:
Motion
- Motion made by Lance James and a seconded by Mike Katz-Lacabe.
Vote:
Yes Hermy Almonte.
Yes Carmen Sullivan.
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Morgan Mack-Rose.
Quick Summary/Staff Recommendation

Approve the Special Board meeting agenda for May 29, 2012.

7. LEGAL STATEMENT
7.1. LEGAL STATEMENT
Quick Summary/Staff Recommendation

Members of the audience who wish to address the Board are asked to complete the yellow card available at the entrance and submit it to the Board's Administrative Assistant. Speakers who have completed the card will be called when the item is reached on the agenda or, for non-agenda items, during the Public Testimony. Cards are to be turned in before the item is reached on the agenda. Please note that the meeting is being recorded.

State law prohibits the Board of Education from taking any action on or discussing items that are not on the posted agenda except to A) briefly respond to statements made or questions posed by the public in attendance; B) ask questions for clarification; C) provide a reference to a staff member or other resource for factual information in response to the inquiry; or D) ask a staff member to report back on the matter at the next meeting and/or put it on a future agenda. (Government Code 54954.2(a)).

8. PUBLIC TESTIMONY ON NON-AGENDA ITEMS-7:00-7:05 p.m.
Minutes:

None

9. PRESENTATIONS - 7:05-7:35 p.m.
9.1. Update on the Governor's May Revise and the Impact on San Leandro Unified School District
Minutes:

Governor Brown released his May Revise Budget on May 14, 2012.  Assistant Superintendent of Business & Operations, Song Chin-Bendib, provided a presentation to the Board regarding highlights of his budget and potential impact to the San Leandro Unified School District.  Staff in the Business Office Department will continue to analyze and publish financial impacts of the May Revise specifically as it relates to the Adoption of the 2012-13 Budget which will include fiscal yearS 2013-14 and 2014-15.  Presentation highlights included: 

  • The National and California Economy is recovering, but very slowly
  • The May Revision: No New Funding for Schools
    • State budget shortfall has grown from January's projected $9.2 billion to $15.7 billion
    • District's, schools, classrooms do not receive any money whether the Governor's taxes pass or not!
    • Bottom line - flat funding, no cuts, but no real increases - if the taxes pass!
  • Risk to the Revised Budget Proposal
    • Voter approval of the Governor's tax initiative is uncertain at best
    • The latest poll found that about 45% of those surveyed supported the measure
    • A competing measure sponsored by Molly Munger and the Parent Teachers' Association (PTA) could confuse voters and draw support away from the Governor's initiative
  • What happens if the Governor's Initiative Fails?
    • May Revision proposes that K-14 education take a $5.5 billion cut
    • School Services of California suggests that school districts plan for an ongoing loss of about $441 per ADA, instead of $370 per ADA as recommended in the Governor's January Proposed Budget (another $601,900 to SLUSD)
    • May Revision proposes school district authorization to reduce the school year by up to a total of 15 days over the 2012-13 and 2013-14 school years
    • Reversing the deferral buy back - $2.8 billion
  • Weighted Student Formula (WSF) Changes
    • Alameda County Office of Education CBO advises not to consider changes in the WSF and proceed with the current formula when submitting the budget

PUBLIC COMMENT

  • Carol Delton, representing the San Leandro Teachers' Association on issues of budget and finance, addressed the Board, stating that now is the time to take those funds that were saved in the past by cuts that did not materialize and were not needed, and use them to maintain programs.

The Board was very disheartened by the potential news from the state, and how the overall economy would impact the passage of a parcel tax, adding that it is very hard to remain positive. They shared comments and asked clarifying questions which were addressed by staff.   

Quick Summary/Staff Recommendation

Goal #: Ensure the Financial Stability and Efficiency of the District

Governor Brown released his May Revise Budget on May 14, 2012. Assistant Superintendent of Business and Operations, Song Chin-Bendib, will provide a presentation to the Board regarding highlights of his budget and potential impact to the San Leandro Unified School District. Staff in the Business Services Department will continue to analyze and publish financial impacts of the May Revise specifically as it relates to the Adoption of the 2012-13 Budget which will include fiscal years 2013-14 and 2014-15.

10. PRESENTATION - 7:35-8:05 p.m.
10.1. Facility Master Plan and Modernization related to Washington Elementary School
Minutes:

Assistant Superintendent of Business and Operations Song Chin-Bendib, Director of Measure B and Bond Projects Michael Murphy and Kurt Weidmann, Measure B and M Program Manager with Harris &  Associates reviewed the District's Facilities' Master Plan as it applies to Washington Elementary School.  The presentation included components of the past master planning process in response to enrollment growth and its effect on facilities such as the placement of portable classrooms.  In addition, information was presented to assist the Board in discussing modernization projects as they relate to existing portables, replacement strategies, and potential next steps.   Highlights of the presentation included:

  • Washington Elementary School is a unique campus in that a disproportionate number of classrooms are portables (68%)
  • The seven oldest unique portables are grouped into two clusters and have been designated as buildings "C" and "E"
  • In light of information on the age of the portables, circa 1955, and past master planning recommendations that they be replaced, the Facility and Technology Committee reached consensus that modernization funds should not be invested in these oldest portables

To position the District to deliver the optional work scope if desired, staff required bidders to provide additive alternates for painting and lighting of buildings C and E. As a result, staff is offering the following two options for the Board's consideration: 

  • Option #1 - Painting and lighting to occur in permanent main building classroom only for the base bid price of $1,067,000
  • Option #2 - Painting and lighting in permanent main building classrooms and three portable classrooms in building C (Rooms 8-10) and four portable classrooms in building E (Rooms 11-14) for the base price of $1,067,000 plus the alternate price of $120,000 equaling $1,187,000.

If the District decides on Option #1, there is a long term plan to replace those portables in Building C and E with a permanent structure. 

Quick Summary/Staff Recommendation

Goal #5: Ensure Safe and Well Maintained Facilities

Song Chin-Bendib Assistant Superintendent of Business and Operations, Michael Murphy Director of Measure B and Bond Projects, and Kurt Weidmann Measure B and M Program Manager with Harris & Associates will review the District?s Facilities Master Plan as it applies to Washington Elementary School.  The presentation will include components of the past master planning process in response to enrollment growth and its effect on facilities such as the placement of portable classrooms.  Information will also be presented to assist the Board in discussing modernization projects  as they relate to existing portables, portable replacement strategies, and potential next steps. 

 

 

11. CONFERENCE ITEM-8:05-8:15 p.m.
11.1. CONFERENCE ITEMS
Quick Summary/Staff Recommendation
These items are submitted for advance planning and to assist the Board in establishing future agenda items. The Board may, however, take action on the following:
12. Facilities & Construction
12.1. Discuss, Review and Approve the Construction Contract with Cal Pacific Construction, Inc. for the McKinley and Washington Elementary Schools Classroom Painting & Lighting Project
Fiscal Impact
The project will be funded by Measure B Local Bond funds. The lowest responsive base bid amount without alternates is $1,067,000 or $1,187,000 with the alternates.
TO:
Cindy M. Cathey, Superintendent
 
Minutes:

Following the discussion that included the vision for Washington Elementary School and the painting & lighting project, the Board approved the contract with Cal Pacific Construction for Option #1, in the amount of $1,067,000 for the McKinley and Washington Elementary School's Classroom Painting and Lighting Projects for base bid work on permanent buildings (not including buildings C and E) by the following vote:

Actions:
Motion
- Motion made by Ron Carey and a seconded by Lance James.
Vote:
Yes Hermy Almonte.
Yes Carmen Sullivan.
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Morgan Mack-Rose.
Quick Summary/Staff Recommendation

Option #1 Approve the Construction Contract with Cal Pacific Construction, Inc., in the amount, of $1,067,000, for the McKinley and Washington Elementary School's Classroom Painting & Lighting Project for base bid work on permanent buildings.

Option #2 Approve the Construction Contract with Cal Pacific Construction, Inc., in the amount of $1,187,000, for the McKinley and Washington Elementary School's Classroom Painting & Lighting Project for base bid work on permanent buildings and buildings C and E.

Board Committee
Facilities and Technology Committee: January 25, 2012, and May 11, 2012
Background Information

Classroom painting & new lighting at McKinley and Washington Elementary Schools was identified in the Measure B language.  AEDIS Architects was retained to prepare the design and construction documents for the painting and lighting.  Plans and specifications were approved by the Division of the State Architect (DSA) and the project was bid through the requirements of Public Contract Code.  The entire project is scheduled to be completed during the summer 2012 break when no students are present.

On May 9, 2012, the District conducted a formal sealed bid opening process, per State of California Public Contract Code requirements, for the McKinley and Washington Elementary Schools Classroom Painting & Lighting Project.  Five (5) bids were received for the project.  The construction budget is $1,195,000.  The lowest responsive, responsible base bid was $1,067,000, which is $128,000 below the construction budget.

Summary of the Bids

Contractor Base Bid Rank Responsive
Cal Pacific Construction, Inc.

$1,067,000

1

Yes

Cam Painting Inc.

$1,092,000

2

Yes

Fix Painting Co.

$1,095,000

3

Yes

Pacific Contractors, Inc.

$1,135,000

4

Yes

Piana Construction, Inc.

$1,423,000

5

No

Based on a check of the required documents of the bid package, the District verified that the bid meets the requirements of Public Contract Code and recommends the lowest responsive, responsible bidder, Cal Pacific Construction, Inc., to the Board of Trustees.

Washington Elementary School is a unique campus in that a disproportional number of classrooms are portables.  Of the twenty two classrooms, fifteen are portables or 68% of the classrooms are portables.  Eight of the portables are of contemporary construction and seven are of older designs.  The seven oldest unique portables are grouped into two clusters and have been designated as buildings ?C? and ?E.?  During the initial scoping process for Measure B in 2006, portable classroom buildings were considered by staff and the Board for upgrades, but due to their interim nature it was deemed prudent to invest in permanent buildings only.  During the current design phase, staff revisited the issue of whether the modernization work should be performed in light of the disproportional number of portables on the site.  While this reanalysis was underway the Board directed AEDIS Architects to include buildings C & E in the design to allow the flexibility of bidding the work if desired at bid time.  Although they are portable classrooms they are more ?built in? than standard portables.  They have elevated ?boardwalk? entries with overhead canopies and are supported by conventional concrete foundations.  On May 11, 2012, the Facilities and Technology Committee reviewed and discussed the issue.  In light of new information on the age of the portables, circa 1955, and past master planning recommendations that they be replaced, the Facility and Technology Committee reached consensus that modernization funds should not be invested in them.

To position the District to deliver the optional work scope if desired, staff required bidders to provide additive alternates for painting and lighting of buildings C and E.  Cal Pacific?s alternate cost is $120,000 bringing the base plus alternate cost to $1,187,000 if the alternates are chosen.

Staff offers the following two options for the Board?s consideration:

  • Option #1 Painting and lighting to occur in permanent main building classrooms only for the base bid price of $1,067,000.
  • Option #2 Painting and lighting in permanent main building classrooms and three portable classrooms in building C (Rooms 8-10) and four portable classrooms in building E (Rooms 11-14) for the base price of $1,067,000 plus the alternate price of  $120,000 equaling $1,187,000.

If the Board decides on Option #1, there is a long term plan to replace those portables in Building C and E with permanent structure. The plan will be included in the power point presentation as a separate item prior to the Board voting on this contract.

Budget Summary

McKinley & Washington ES Classroom Painting & Lighting Project
Soft Cost Budget

$724,203

Hard Cost Budget

     Construction

     Construction Contingency

 

$1,195,000

$62,319

                                      $1,257,319

Project Contingency

$98,696

Total Project Budget

$2,080,218

 

FROM:
Song Chin-Bendib, Assistant Superintendent, Business & Operations
Attachments:
Cal Pacific Construction Contract
13. CONSENT ITEMS - 8:15-8:35 p.m.
13.1. Approval of Consent Items
Minutes:

President Mack-Rose said that Consent Item 15b, Classified Personnel Report, had been revised and copies were distributed to the Board.  In addition staff pulled the following items from the Consent Calendar:

  • 16b - Contract with Chabot Las Positas  Community College District  for use of college facilities for San Leandro  High School Varsity and Junior Varsity Football Games and,
  • 16c - Contract with Chabot Las Positas Community College District for use of college facilities for San Leandro Freshman Football Games

The Consent Calendar was approved as amended.

Actions:
Motion
- Motion made by Ron Carey and a seconded by Mike Katz-Lacabe.
Vote:
Yes Hermy Almonte.
Yes Carmen Sullivan.
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Morgan Mack-Rose.
Quick Summary/Staff Recommendation
These items are considered routine and may be enacted by a single motion. At the request of any member of the Board, any item on the consent agenda shall be removed and given individual consideration for action as a regular agenda item.
14. Human Resources
14.1. Certificated Personnel Report
Attachments:
Certificated Personnel Report
14.2. Classified Personnel Report
Attachments:
Classified Personnel Report
15. Business & Operations
15.1. Consultant Contract with McCloskey Consultants to provide Phase I Environmental Site Assessment at Girls Inc.
Fiscal Impact
The fee of $2,900 will be paid out of the Developer Fees Fund (Fund 25).
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation

Approve consultant contract with McCloskey Consultants to provide Phase I Environmental Site Assessment at Girls Inc. for a fixed price of $2,900.

Background Information

The San Leandro Unified School District (?District?) is the recipient of a grant from the San Francisco Foundation to work with collaborative community partners to develop a plan to implement a Community-based Health Center on or near the high school campus.  The Community-Based Health Center is based upon a national research-based model designed to provide essential services to students and families.  These services can include:  medical, dental, social, emotional and academic supports for students and their families.  One of the biggest challenges faced by district?s seeking to implement a Community-based health center, is finding a facility large enough to house the health center.   Currently, the District has inadequate facility space to house such a center. 

Recently it has come to our attention that the Girls Inc. facility across the street from San Leandro High School main campus is for sale.  The property is located at 13666 East 14Street.   The District would like to explore the feasibility of this building for use as the health center.   However, in order for the District to show an interest, there are many preliminary steps that must be taken.

One of the steps is to secure a consultant contract to guide the District through this feasibility exploratory phase. The Board of Education approved a contract with School Site Solutions, Inc., on May 15, 2012, to provide a feasibility study on Girls Inc.

The next step is to perform site assessment. Staff is recommending McCloskey Consultants to provide the Phase I Environmental Site Assessment (ESA). Mr. McCloskey has performed many site assessments for our Measure A and B projects and provided very satisfactory results. The fixed price of the study is $2,900.

Since the study is anticipated to take 3 to 4 weeks and that the Board has directed staff to move forward with all the necessary steps to explore the feasibility of Girls Inc., staff has authorized Mr. Closkey to proceed with the work with ratification of the contract by the Board tonight.

The fee of $2,900 will be paid out of the Developer Fees Fund (Fund 25).

FROM:
Song Chin-Bendib, Assistant Superintendent, Business & Operations
Attachments:
Consulting Contract - McCloskey
15.2. Contract with Chabot Las Positas Community College District for use of College Facilities for San Leandro High School Varsity and Junior Varsity Football Games
Fiscal Impact
Cost estimated to be $xx,xxx funded from Measure M bond funds
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the contract with Chabot Las Positas Community College District for use of College Facilities for San Leandro High School Varsity and Junior Varsity Football Games
Background Information

As part of the Measure M bond projects approved by the voters in November 2010, renovation of the San Leandro High School Swim Center and fields, including the track, football, baseball, and softball fields was identified by the Board as a priority marquee project. Construction of the project is scheduled to begin on August 1, 2012. Once construction begins, all sports teams (including swimming, football, baseball, softball, etc.) that use these spaces will be unable to practice and/or hold games on the campus. In planning for this displacement, staff along with the site Athletic Directors and administrators have been working hard to find the most economical means of providing alternative locations for team practices and games. Using various local sites and facilities, the athletic directors have successfully developed a plan to address the needs of each of the teams. To that end, attached is a contract service agreement with Chabot Las Positas Community College for the use of their facility for three Junior and Varsity team football games. The estimated cost for the use of the facility for these games is $3,000.

The final contract will be provided at the  Board meeting.

FROM:
Song Chin-Bendib
Attachments:
Draft Varisty Junior Varsity Football games contract
15.3. Contract with Chabot Las Positas Community College District for San Leandro Freshman Football Games
Fiscal Impact
Cost estimated to be $xx,xxx funded from Measure M bond funds
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the contract with Chabot Las Positas Community College District for San Leandro Freshman Football Games
Background Information

As part of the Measure M bond projects approved by the voters in November 2010, renovation of the San Leandro High School Swim Center and fields, including the track, football, baseball, and softball fields was identified by the Board as a priority marquee project. Construction of the project is scheduled to begin on August 1, 2012. Once construction begins, all sports teams (including swimming, football, baseball, softball, etc.) that use these spaces will be unable to practice and/or hold games on the campus. In planning for this displacement, staff along with the site Athletic Directors and administrators have been working hard to find the most economical means of providing alternative locations for team practices and games. Using various local sites and facilities, the athletic directors have successfully developed a plan to address the needs of each of the teams. To that end, attached is a contract service agreement with Chabot Las Positas Community College for the use of their facility for seven Freshman football games. The estimated cost for the use of the facility for these games is $7,000. 

The final contract will be provided at the Board meeting.

FROM:
Song Chin-Bendib
15.4. Contracts for amounts $5,000 or less for fiscal year 2011-2012.
Fiscal Impact
None, but each contract will be funded based on its budget source requested.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve contracts on the attached spreadsheet which are for amounts $5,000 or less for fiscal year 2011-2012.
Board Committee
Finance Committee on June 20, 2011
Background Information
Attached is the "summary spreadsheet for all contracts $5,000 or less for fiscal year". The spreadsheet will be provided to the Board at every board meeting if there are any contracts falling under this category. Detailed contract information will not be part of the Board packet but will be available for questions or inspection upon request. For accounting purposes, each contract still requires submission of a requisition for approval by site administrator. All contracts require two signatures - Initiating Administrator and the Chief Business Officer or a Cabinet member.
FROM:
Song Chin-Bendib, Assistant Superintendent, Business & Operations
Attachments:
Contractor Worksheet - 05292012
16. ADDITIONAL SUGGESTIONS AND COMMENTS FROM BOARD MEMBERS-8:35 p.m.
Minutes:

Trustee Prola commented that she, along with Trustee Mack-Rose, visited the Arts Education Center where teachers' artwork was displayed. Trustee Prola distributed a copy of an article that appeared in the San Francisco  Chronicle, "Schools' Investment in Attendance Pays Off," where a year ago, the Berkeley school Superintendent used district funds and invested it in a program that focuses on school attendance, noting that attendance only went up 2%; however, the district received $1 million from the state. While she wasn't suggesting that San Leandro follow this example, she felt that this might be an area whereby parents could volunteer to call homes daily in an effort to track student attendance.

Trustee James reported that he heard that the Senior trip to Disneyland was very successful. He also hoped negotiations proceed well and openly.  

Student Board member Jack Martin commented "only seven more days of school" and his last Board meeting will be June 5.  He also announced that "Relay for Life" will be this weekend.  

17. ANNOUNCEMENT
17.1. Board of Education Meetings
Minutes:
  • Regular Board Meeting ? June 5, 2012 
  • Regular Board Meeting ? June 19, 2012 
  • Special Board Meeting ? June 26, 2012
Quick Summary/Staff Recommendation
  • Regular Board Meeting ? June 5, 2012 
  • Regular Board Meeting ? June 19, 2012 
  • Special Board Meeting ? June 26, 2012
18. ADJOURNMENT*
18.1. Time
Minutes:

The meeting was adjourned at 9:14 p.m.

Actions:
Motion
- Motion made by Mike Katz-Lacabe and a seconded by Lance James.
Vote:
Yes Hermy Almonte.
Yes Carmen Sullivan.
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Morgan Mack-Rose.
Disability Information:
Agenda items are available for inspection at the School District Office, 300 S. Robinson St., Tehachapi CA during regular office hours, 7:30 a.m. to 4:30 p.m. and at the Board meeting. The Tehachapi Unified School District Board of Trustees electronically records its meetings and recordings are available for public review on the website for a period of 30 days following the Board Meeting. Copies may be obtained at the District Office at a cost of $1.00 for the first page and 10 cents for each additional page. An individual who requires disability-related accommodations, including auxiliary aids and services, in order to participate in the Board meeting should contact the Superintendent's Office at 661-822-2700. NOTE: Agenda documents that have been distributed to members of the Board of Education less than 72 hours prior to the meeting are available for inspection at the District Office, 300 South Robinson Street, Tehachapi, during regular business hours, 7:30 a.m. to 4:30 p.m., Monday – Friday.
( Original )
PresentCindy Cathey
PresentDebbie Wong
PresentJohn Thompson, Ed.D.
PresentHermy Almonte
PresentCarmen Sullivan
PresentLance James
PresentRon Carey
PresentDiana Prola
PresentMike Katz-Lacabe
PresentJack Martin
PresentMorgan Mack-Rose
PresentSong Chin-Bendib

The resubmit was successful.