banner

Regular Board Meeting
San Leandro USD
May 21, 2013 7:00PM
San Leandro City Council Chambers
835 E. 14th Street
San Leandro, CA

0. CALL TO ORDER/ROLL CALL - 6:00 P.M.
Minutes:

The meeting was called to order at 6:02 p.m. by President Prola.  It was noted that all Board members were present with the exception of Trustees L?pez and Rosato. 

1. PUBLIC TESTIMONY - CLOSED SESSION ITEMS
Minutes:

There were no public comments on closed session items.

2. RECESS INTO CLOSED SESSION - 6:00 P.M.
Minutes:

The Board recessed into closed session at 6:02 p.m.

2.1. Student Expulsions; Education Code 35146 and 48918(c)
2.2. Public Employee Discipline/Dismissal/Release/ Hiring, Government Code Section 54957
2.3. Conference with Labor Negotiator (Government Code section 54957.6) Employee organizations: SLTA, CSEA, T/T, Unrepresented Groups, Designated Representative: John Thompson
2.4. Conference with Labor Negotiator: Unrepresented Employees; Government Code Section 54957.6 Assistant Superintendent, Business & Operations Assistant Superintendent, Educational Services, Senior Director II, Human Resources, Designated Representative: Cindy Cathey
2.5. Conference with Legal Counsel Anticipated Litigation - Significant exposure to litigation pursuant to Government Code Section 54956.9: 1 case
2.6. Public Employee Appointment - Title: Accounting Manager (Government Code Section 549057)
2.7. Conference with Legal Counsel - Existing Litigation (Government Code Section 54956.9, subd. (a))Confidential agenda item.
Quick Summary/Staff Recommendation

Williams Properties, a California General Partnership, and Prudential Properties, a  California Limited Partnership v. The San Leandro Unified School District, et al., County of Alameda Superior Court Case No. RG13662223.

3. RECONVENE TO OPEN SESSION - 7:00 p.m.
Minutes:

The Board reconvened into open session at 7:10 p.m.  It was noted that Trustee L?pez arrived at 6:21 p.m. and Trustee Rosato arrived at 6:47 p.m.

3.1. Report on Closed Session ActionConfidential agenda item.
3.2. Pledge of Allegiance
Minutes:

President Prola led the Pledge of Allegiance to the Flag.

3.3. Approval of Agenda
Minutes:

The Board approved the agenda for the Regular Board meeting held on May 21, 2013.

Actions:
Motion
- Motion made by Ron Carey and a seconded by Lance James.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation

Approve the agenda for the Regular Board meeting held on May 21, 2013.

3.4. LEGAL STATEMENT
Quick Summary/Staff Recommendation

Members of the audience who wish to address the Board are asked to complete the yellow card available at the entrance and submit it to the Board's Administrative Assistant. Speakers who have completed the card will be called when the item is reached on the agenda or, for non-agenda items, during the Public Testimony. Cards are to be turned in before the item is reached on the agenda. Please note that the meeting is being recorded.

State law prohibits the Board of Education from taking any action on or discussing items that are not on the posted agenda except to A) briefly respond to statements made or questions posed by the public in attendance; B) ask questions for clarification; C) provide a reference to a staff member or other resource for factual information in response to the inquiry; or D) ask a staff member to report back on the matter at the next meeting and/or put it on a future agenda. (Government Code 54954.2(a)).

4. PUBLIC TESTIMONY ON NON-AGENDA ITEMS - 7:05-7:15 p.m.
Minutes:

There were no public comments on non-agenda items.

5. PRESENTATIONS - 7:15-8:35 p.m.
5.1. Certificates of Commendation : 2013 Congressional Art Awards
Minutes:

"An Artistic Discovery" is a high school visual art contest held each spring by Members of Congress to acknowledge and encourage artistic talent. This competition is an opportunity for high school students living in the 13th Congressional District to gain national recognition for their creative talents.

The San Leandro High School art department was pleased to announce that they took top prizes at "An Artistic Discovery" the Congressional Art Awards, sponsored by Congresswoman Barbara Lee. The reception was held at the Officer's Club in Alameda on May 11, 2013.

The Board of Education and Superintendent recognized teachers Diane Dove and Audrey Brown, San Leandro High School students Rachel Yu District award winner for her drawing, Juan Pablo Gonzales, 2nd runner up for digital photography and Congressional Art Award winner Sumedh Vedanthi, who will receive two Southwest airline tickets to Washington DC for a luncheon with Congress and his art work will hang in the White House for a year.

Quick Summary/Staff Recommendation

Goal #1: Educate the Whole Student: Ensure the academic, physical, social and emotional well being of every student 

"An Artistic Discovery" is a high school visual art contest held each spring by Members of Congress to acknowledge and encourage artistic talent.  This competition is an opportunity for high school students living in the 13th Congressional District to gain national recognition for their creative talents. 

The San Leandro High School art department is pleased to announce that they took top prizes at "An Artistic Discovery" the Congressional Art Awards, sponsored by Congresswoman Barbara Lee.  The reception was held at the Officer's Club in Alameda on May 11, 2013.  

The Board of Education and Superintendent will recognize teachers Diane Dove and Audrey Brown, San Leandro High School students Rachel Yu District award winner for her drawing, Juan Pablo Gonzales, 2nd runner up for digital photography and Congressional Art Award winner Sumedh Vedanthi, who will receive two Southwest airline tickets to Washington DC for a luncheon with Congress and his art work will hang in the White House for a year.

5.2. National Jefferson Service Award Northern California Division Champions
Minutes:

Fourteen students from the San Leandro High School Jefferson Service Club have received prestigious national recognition as the Northern California Division winners honoring them for their community service in and outside of school. Under the guidance of San Leandro High School teacher and advisor Jack Nelson, the students volunteered over 900 hours, raised $10,000 that went toward the West African community and San Leandro High School athletics, raised and donated two $300 scholarships to needy students from Oakland, organized a child abuse survivor to speak at the school's Season of Service, Period of Peace, and recruited an Oakland high school to open a Jefferson Service Club. The Board of Education and Superintendent recognized the tremendous efforts of the award winning Jefferson Service Club and their many endeavors to serve our communities. The following students recognized were:

  • Rafael Castro
  • Domenic Gonzalez
  • Ashley Vo
  • Rafaeli Arroyo
  • Van Lau
  • Bronson Mach
  • Jovan Nelson
  • Jenny Nguyen
  • Emilie Shen
  • Daniel Trujillo
  • Kathleen Vu
  • Ashur Thomas
  • Kevin Nelson
  • Sabby Singh
  • Jennifer Wong

On a side note, San Leandro High School teacher and advisor, Jack Nelson, mentioned that with the help of Martin Capron, San Leandro Sports Foundation President, they thought it would be a great idea to raise money for school clubs, if members of the clubs could park cars for donations at the high school graduation this year which will be the first big event at Burrell Field.

Quick Summary/Staff Recommendation

Goal #1: Educate the Whole Student: Ensure the academic, physical, social and emotional well being of every student

Fourteen students from the San Leandro High School Jefferson Service Club have received prestigious national recognition as the Northern California Division winners honoring them for their community service in and outside of school.  Under the guidance of San Leandro High School teacher and advisor Jack Nelson, the students volunteered over 900 hours, raised $10,000 that went toward the West African community and San Leandro High School athletics, raised and donated two $300 scholarships to needy students from Oakland, organized a child abuse survivor to speak at the school's Season of Service, Period of Peace, and recruited an Oakland high school to open a Jefferson Service Club.  The Board of Education and Superintendent would like to recognize the  tremendous efforts of the award winning Jefferson Service Club and their many endeavors to serve our communities.  The following students to be recognized are:

  • Rafael Castro
  • Domenic Gonzalez
  • Ashley Vo
  • Rafaeli Arroyo
  • Van Lau
  • Bronson Mach
  • Jovan Nelson
  • Jenny Nguyen
  • Emilie Shen
  • Daniel Trujillo
  • Kathleen Vu
  • Ashur Thomas
  • Kevin Nelson
  • Sabby Singh
5.3. Eden Area Regional Occupational Program Students Win Forensics Science Title
Minutes:

SkillsUSA's mission is to empower its members to become world-class workers, leaders and responsible American citizens. It provides its members quality education experiences in leadership, teamwork, citizenship, and character development. More than 300,000 students and advisors join SkillsUSA annually. SkillsUSA holds an annual competition. This year more than fifty four students from Eden Area ROP traveled to San Diego for the competition. State level winners will travel to Kansas City for the National Leadership and Skills Conference.

The Board of Education and the Superintendent congratulated San Leandro High School students Chelsea Hudson and Zach Bolar for placing 2nd in the Crime Scene Investigation Competition and receiving a silver medal. Chelsea will be continuing on to the SkillsUSA National Conference to compete for the title of "Best in the Nation".

Quick Summary/Staff Recommendation

Goal #1: Educate the Whole Student: Ensure the academic, physical, social and emotional well being of every student

SkillsUSA's mission is to empower its members to become world-class workers, leaders and responsible American citizens. It provides its members quality education experiences in leadership, teamwork, citizenship, and character development. More than 300,000 students and advisors join SkillsUSA annually. SkillsUSA holds an annual competition. This year more than fifty four students from Eden Area ROP traveled to San Diego for the competition. State level winners will travel to Kansas City for the National Leadership and Skills Conference. 

The Board of Education and the Superintendent congratulate San Leandro High School students Chelsea Hudson and Zach Bolar for placing 2nd in the Crime Scene Investigation Competition and receiving a silver medal. Chelsea will be continuing on to the SkillsUSA National Conference to compete for the title of "best in the nation".  

5.4. Special Education Program Report
Minutes:

David Poeschl, Director of Special Services, provided his annual update related to special education in our District. This report included information and updates on specific special education programs, the budget, non-public school agencies needs. inclusion, and the efforts by the special education staff to work closely with the general education staff on supporting core instruction as well as development and implementation of innovative and applicable programming to support our students with special needs. 

In summary, Mr. Poeschl reported that:

  • While the District has significant challenges ahead in the area of special education, we are moving forward
  • The District is now compliant in the area of placements and services, which is a significant change over the past few years
  • Programs are being implemented and planned that will address this more effectively and economically in the next 1-2 years
  • These are all correctable problems, given a greater partnership between general and special education

The Board thanked and appreciated Mr. Poeschl's efforts to provide the services to meet our students' needs, and for bringing the District into compliance.  In addition questions and comments raised by the Board (which were addressed by staff) included:

  • Does the  District currently have any out of state placements?
  • What is the encroachment to the general fund on mandated services for special education that is not funded by the state?
  • Overrepresentation of African American, Latino, and second language learners
  • What is the average cost of Special Education?
  • Would like to see data that takes us back to 20:1 and staggered reading in K-3
  • Is there any repercussions for being out of compliance?
  • Why is there an increase in the numbers of children with high functioning autism and  Asperger's Syndrome?
  • In addition to corrective measures being implemented at the secondary level in the area of mainstreaming/inclusion, how will the District meet the needs for all sites to help students with special needs succeed in general education settings?
Quick Summary/Staff Recommendation

Goal #1: Educate the Whole Student: Ensure the academic, physical, social and emotional well being of every student  
 
David Poeschl, Director of Special Services, will provide his annual update related to special education in our District.  This report will include information and updates on specific special education programs, the budget, non-public school, inclusion, and the efforts by the special education staff to work closely with the general education staff on supporting core instruction as well as development and implementation of innovative and applicable programming to support our students with special needs.

5.5. Brief Update on the Governor's May Revise and the Potential Impact on San Leandro Unified School District
Minutes:

Governor Brown released his 2013-14 May Revise Budget on May 14, 2013. Assistant Superintendent of Business and Operations, Song Chin-Bendib, provided a brief presentation to the Board regarding highlights of his budget. Potential impact of the budget to the San Leandro Unified School District was discussed without much detail because the School Services Inc., workshop occurred the day before the Board meeting on May 20, 2013, and staff have not had enough time to interpret the data and analyze its impact to the fullest on the San Leandro USD?s budget and next steps. More details on the May Revise will be presented to the Board on June 4, 2013.  As part of the brief discussion of the May Revise, staff reviewed the budget reductions (estimated at $1,320,000) that were Board approved in March 2012.  Highlights of the presentation included;

Components:

  • An increase in repayment of deferrals in 2012-2013 by $1.6 billion and a decrease in the amount or $909 million in 2013-14
  • An additional $240 million for the Local Control Funding Formula (LCFF) for first-year implementation, for a total of $1.9 billion
  • A dramatic increase in state oversight of the LCFF accountability system
  • An augmentation of $1 billion in 2012-13 for implementation of the new Common Core academic standards (CCAS)
  • $60.7 million augmentation to special education to backfill the federal sequestration reduction
  • Maintaining the status quo for existing K-12 and CCC Adult Education programs for two years
  • Providing Regional Occupational Centers and Programs and Home-to-School Transportation joint-powers agreements with continued direct funding for two additional years

Options: Revenue Limit or LCFF

  • School  Services of California, Inc. (SSC) is recommending developing the 2013-14 Adoption Budget based on current law, traditional Revenue Limit model (Option 1); 2013-14 State Budget has to be passed by mid June, which will be too late to build the San Leandro USD budget

The Board thanked staff for the synopsis and was pleased to hear that Adult School and ROP funding would continue for the next two years.

Quick Summary/Staff Recommendation

Goal #2: Ensure the Financial Stability and Efficiency of the District

Governor Brown released his 2013-14 May Revise Budget on May 14, 2013. Assistant Superintendent of Business and Operations, Song Chin-Bendib, will provide a brief presentation to the Board regarding highlights of his budget. Potential impact of the budget to the San Leandro Unified School District will be discussed but may not be in detail because the School Services Inc., workshop occurs a day before the Board meeting on May 20, 2013, and staff will not have had enough time to interpret the data and analyze its impact to the fullest on the San Leandro USD?s budget. More details on the May Revise will be presented to the Board on June 4, 2013.

As part of the brief discussion of the May Revise, staff will review the budget reductions (estimated at $1,320,000) that were Board approved in March 2012.

6. CONFERENCE ITEM - 8:35-9:00 p.m.
6.1. Approval of Conference Item
Quick Summary/Staff Recommendation
These items are submitted for advance planning and to assist the Board in establishing future agenda items. the Board may, however, take action on the following:
7. Business and Operations
7.1. Review and Discuss Budget Priorities and Budget Reductions Slated for the 2013-2014 School Year
Fiscal Impact
To Be Determined
TO:
Cindy M. Cathey, Superintendent
 
Minutes:

The Board reviewed and discussed budget priorities and budget reductions slated for 2013-2014 and provided direction to staff for the 2013-2014 school year as appropriate.  

The Board voted to maintain K-3 CSR at 28:1 ($420,000); Campus Supervisors - 2 FTEs ($90,000); VP - Middle & Elementary - 1.0 FTE ($116,000); and Custodian - 1 FTE ($44,000) amounting to $670,00 out of the $1.23 million in budget cuts planned for the 2013-14 school year as a starting point to restoring educational services. 

Following the vote and Assistant Superintendent Chin-Bendib's clarification that these restorations were for the 2013-14 fiscal year only, the Board took a break at 8:45 p.m. and returned to open session 8:50 p.m.

Actions:
Motion
- Motion made by Lance James and a seconded by Vince J. Rosato.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
The Board of Education will review budget priorities and budget reductions slated for 2013-2014 and provide direction to staff for the 2013-2014 school year as appropriate.
Board Committee
Finance Committee Meeting: May 2, 2013
Background Information
Goal #2: Ensure the Financial Stability and Efficiency of the District The Board has made extremely difficult decisions regarding the District?s budget due to drastic cuts at the state level to K-12 education that have happened annually since 2008. In spite of concessions and repeated sacrifices from our employee groups, profound impacts to programs and services for students have been felt across the entire district. Additionally, the Board spent nearly 90% of its one time funds to do all it could to stave off further, unimaginable cuts and to preserve as many valued programs and services as possible. Cuts made by the Board of Education are slated to take effect beginning with the 2013-2014 school year and continuing on through 2014-2015 and 2015-2016. The Board of Education will review budget priorities and reductions slated for 2013-2014 and provide direction to staff for the 2013-2014 school year as appropriate.
FROM:
Song Chin-Bendib, Assistant Supeerintendent, Business and Operations
8. REPORTS - 9:00-9:15 p.m.
8.1. Correspondence
Minutes:

Trustee Carey reported receipt of emails from May 7, 2013, to May 20, 2013: From Donna McBride regarding "Wilson Dolphin News"; from Cynthia Vincent regarding "Bus Improvements Proposed for Central and Southern Alameda County"; from Mary Patterson regarding "Employees of the Year," and "Board approved school calendar"; from Mike McMahon regarding "May 10 CSBA Legislative Day"; from Audrey Brown regarding "Announcements of AP Studio Art," and "Congressional Art Show"; from Deborah Cox regarding the "San Leandro Education Foundation and SLUSD MOU"; from Katherine Kwong regarding "Please Joint Congresswoman Barbara Lee at "An Artistic Discovery Ceremony on May 11th"; from Robin Michel regarding "Bond Measure Highlights: May 7, 2013," and "Guys and Dolls Smash Hit, Dollar Day Sundays"; from Mike Katz-Lacabe regarding "SL Times" School Board Defends CABs: 'Necessary Evil'; from Elaine Tesorero regarding "Weekly Bulletins May 13-May 17, 2013, and May 20-May 24, 2013"; from Audrey Brown, Felecia Hansen, Dan Martin, and David Ellington regarding "Announcement"; from Sukhi Khaira regarding Facilities and Technology Agenda - May 15, 2013"; from Jon Sherr regarding "Supt. Interviews," and "Violation of Grievance Settlement"; from Anthony Farley, May Castro, Sarah Kayler, and Marc Gordon regarding "Campus Cleanliness"; from Veronica Sanchez regarding "Newsletter for May 17"; from Keep Music Rockin' Foundation regarding "Lenny Williams Golf Classic"; and from John Thompson regarding "Violation of Grievance Settlement."

8.2. Student Board Member Report
Minutes:

Student Board member Elisha Feliciano updated the Board on activities at the San Leandro High School main campus and Fred T. Korematsu campus.  Highlights included:

  • This past week, a teacher complained about the music that was being played in the quad during lunch, stating that it was inappropriate, and needed to be stopped.  As a result the students could not play music for about week, which upset the students as they felt that this was the first complaint that they had received.  The Leadership class felt that one bad musical selection should not warrant this privilege being taken away and they will be meeting with the administration to discuss the issue
  • The swim team went to the NCS championships, and although they didn't have any big wins, they had a remarkably successful 2013 season, adding that the team is looking forward to finally practicing at  the new swim center at the high school next year
  • Track and Field placed second at NCS championships. This weekend the team will be attending NCS at UC Berkeley 
  • Upcoming events include
    • The Band and orchestra will be going to Disneyland this weekend, along with the Seniors for Senior Grad Night
    • Senior Recognition Night is Friday, June 7 at 7:00-9:00 p.m. at the San Leandro High School gym
    • There are 16 more school days left for the schools

 

8.3. Union Representative Reports
Minutes:

There were no Union Representative reports.

8.4. Superintendent Report
Minutes:

Superintendent Cindy Cathey acknowledged that this week is Classified Employees Week. She announced that thanks to the very hard work and support from the San Leandro Education Foundation and Tessa Atkinson-Adams, they have successfully obtained $50,000 in grants from Lowe's for school improvements. Ten District schools will receive $5,000 each. 

Open House for the elementary schools is tomorrow night, May 22, and the schedule is on the website

The Adult School Graduation will be Monday, June 3, at 7 p.m. in the Arts Education Center

The Superintendent thanked a host of so many people who have been part of the District Office move, noting that we are now  temporarily located at the Helen Lawrence South Building, next to the City Hall and Police Station.  To help people find us, signage will be posted.  She also thanked the City for recognizing our need and stepping up and making this happen so quickly.

9. BOARD COMMITTEE REPORTS - 9:15-9:30 p.m.
9.1. Curriculum Committee
Minutes:

Trustee Carey said that the Curriculum Committee met on May 15,  The Board discussed two elective courses for the Adult School, Adoption of San Leandro Adult School General Elective Course Outline: Leadership Development and Transformative Life Skills, which are being brought forward tonight for Board consideration. The committee also discussed the Single School Plan for Student Achievement which is an overview of the process and checklist for schools.  The plans should be coming to the Board on June 18.

9.2. Policy Committee
Minutes:

Trustee Carey reported that the Policy Committee met on May 15 and discussed the Revision to Board Policy and Administrative Regulations 1250 - Visitors and Revision to Board Policy and Administrative Regulations 3440 - Inventories, both of which are being brought forward for Board consideration tonight. The committee also discussed a CSBA Policy audit.  It was decided to move forward with a three-day service contract beginning sometime in October 2013.

9.3. Facilities/Technology
Minutes:

Trustee Prola said that the Facilities/Technology Committee met on May 15. In addition to several contracts, which are being brought forward for Board consideration tonight, the committee discussed security cameras at Burrell Field, back field landscape renovation at McKinley Elementary, bleachers at  San Leandro High School, field signage for District's synthetic fields, revenue opportunities for the Pacific Sports Complex and Burrell Field, possible redesign of the District logo, and the Memorandum of Understanding with the City for rental space for the District during construction at the District Office.

10. CONSENT ITEMS - 9:30-9:45 p.m.
10.1. Approval of Consent Items
Minutes:

The following consent items were pulled from the Consent Calendar: 

  • 14a - San Leandro Adult School General Elective Course Description: Leadership Development (Prola)
  • 14b - San Leandro Adult School General Elective Course Description: Transformative Life (Prola)

With those exceptions, the Board approved the Consent Calendar as amended.

Actions:
Motion
- Motion made by Mike Katz-Lacabe and a seconded by Corina N. Lopez.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
These items are considered routine and may be enacted by a single motion. At the request of any member of the Board, any item on the consent agenda shall be removed and given individual consideration for action as a regular agenda item.
11. General Services
11.1. Approval of Minutes - April 16, 2013
Quick Summary/Staff Recommendation

Approve the minutes of the Regular Board meeting held on April 16, 2013.

Attachments:
April 16, 2013, Minutes
11.2. Approval of Minutes - April 30, 2013
Quick Summary/Staff Recommendation

Approve the minutes of the Special Board meeting held on April 30, 2013. 

Attachments:
April 30, 2013, Special Board meeting minutes
11.3. Approval of Minutes - May 8,2013
Quick Summary/Staff Recommendation

Approve the minutes of the Special Board meeting held on May 8, 2013.

Attachments:
Special Board Meeting Minutes - May 8, 2013
11.4. Designation of School Representatives to the California Interscholastic Federation League (CIF) for 2013-2014 School Year
TO:
Board of Education
 
Quick Summary/Staff Recommendation

Approve the Designation of School Representatives to the California Interscholastic Federation League (CIF) for 2013-2014 School Year.

Board Committee
Non Applicable
Policy/Code
Ed. Code 33353 (a)(1) CIF Constitution, Article 2, Section 25, pg. 16
Background Information

Representatives to the California Interscholastic Federation League must be designated and approved by the Board each year to be able to vote on matters concerning their league and section.  If the CIF Section Office does not receive this form by the deadline of July 2, 2013, our voting privileges will be suspended for the 2013-2014 school year.  The San Leandro High School Representatives for the 2013-2014 school year are:

  • Linda Granger, Principal
  • Jerome Manos, Athletic Director
  • Jeanette Wood, Athletic Director

 

FROM:
Cindy M. Cathey, Superintendent
Attachments:
CIF 2013-2014 Designation
12. Human Resources
12.1. Certificated Personnel Report
Attachments:
Certificated Personnel Report
12.2. Classified Personnel Report
Attachments:
Classified Personnel Report
13. Educational Services
13.1. San Leandro Adult School General Elective Course Description: Leadership Development
TO:
Cindy M. Cathey, Superintendent
 
Minutes:

Trustee Prola didn't feel the course was very rigorous and lacked textbooks, materials, etc. Assistant Superintendent Debbie Wong explained that this course of study follows a youth development strand called 180 Degrees Program,  enhancing lives one degree at a time. While the Program includes a variety of activities (not a textbook), it is quite comprehensive and significant and can provide up to 5 credits toward a high school diploma.  The Adult School currently runs this program at Lincoln as part of their ASSETS Program and the Adult School wanted to have it as one of their elective course offerings.

The Board approved the San Leandro Adult School General Elective Course Description: Leadership Development. 

Actions:
Motion
- Motion made by Vince J. Rosato and a seconded by Ron Carey.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
Approve the San Leandro Adult School General Elective Course Description: Leadership Development
Board Committee
Board Curriculum Committee met on May 15, 2013
Background Information

The San Leandro Adult School seeks approval of a new general elective course offering entitled Leadership Development.  The course of study follows a youth development strand called 180 Degree Program, enhancing lives one degree at a time.  This is a skill-building curriculum with the outcome of developing productive and fulfilling adults that include self-awareness and social responsibility. 

This course can provide up to 5 credits towards a high school diploma. The course description is included. 

FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
Leadership devel course
13.2. San Leandro Adult School General Elective Course Description: Transformative Life Skills
TO:
Cindy M. Cathey, Superintendent
 
Minutes:

Responding to Trustee Prola, Assistant Superintendent Debbie Wong clarified that the Transformative Life Skills course also offers up to 5 credits towards a high school diploma and it does not replace the Physical Education requirement.

Assistant Superintendent Wong also explained that both of the these electives filled a need for another alternative to help Lincoln and Adult School students receive credits.

The Board approved the San Leandro Adult School General Elective Course Description: Transformative Life Skills.

Actions:
Motion
- Motion made by Vince J. Rosato and a seconded by Ron Carey.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
Approve the San Leandro Adult School General Elective Course Description: Transformative Life Skills
Board Committee
Board Curriculum Committee met on May 15, 2013
Background Information

San Leandro Adult School seeks approval of a new general elective course of study entitled Transformative Life Skills.  The course objective is to provide physical and socio-emotional development through building self-regulation skills utilizing non-sectarian meditation and yoga techniques.  This course is designed to reduce stress and increase adolescent adaptive skills.

Students can receive up to 5 credits towards a high school diploma. The course description is attached for your perusal.  

FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
Transformative life skills course
13.3. Contracted Services Agreement Between San Leandro Unified School District and YMCA of the East Bay for Science Camp Arroyo for Washington Elementary School on March 17-20, 2014
Fiscal Impact
No impact to the General Fund; $18,990 from Washington's Science Camp Donation and Washington PTA Funds
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the Contracted Services Agreement Between San Leandro Unified School District and YMCA of the East Bay for Science Camp Arroyo for Washington Elementary School on March 17-20, 2014
Background Information
Washington Elementary School is seeking participation in the YMCA at Camp Arroyo Science Camp program next March 17-20, 2014 as part of the Grade 5 outdoor science program. The cost of 70 students and 10 teachers and chaparones to attend the 4-day science camp is $18,990 from the school's science camp donation and PTA funds. No students will be excluded from attending due to lack of ability to pay. The school conducts yearlong fundraising and seeks donors to fund the science camp.
FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
Wash Camp contract
Washington Use Agreement
13.4. Contracted Services Agreement Between San Leandro Unified School District and YMCA of the East Bay for Science Camp Arroyo for Wilson Elementary School on March 26-28, 2014
Fiscal Impact
No impact to the General Fund; $22,830 from Wilson's science camp Donation and PTA budgets
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the Contracted Services Agreement Between San Leandro Unified School District and YMCA of the East Bay for Science Camp Arroyo for Wilson Elementary School on March 26-28, 2014
Background Information

Wilson Elementary School is seeking to participate in the YMCA at Camp Arroyo Science Camp program next March 26-28, 2014 as part of the Grade 5 outdoor science program. The cost of 95-5th grade students and 16 teachers and chaperones to attend the 3-day science camp is $22,830 from the school's science camp Donation and PTA funds. No students will be excluded from attending due to an inability to pay. The school conducts yearlong fundraising and seeks donors to fund the science camp.

FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
Wilson Camp contract
Wilson Use Agreement
13.5. Contracted Services Agreement Between San Leandro Unified School District and Soliant Health for a Vision Specialist for the 2012-2013 School Year
Fiscal Impact
$7,500 from Special Education Budget
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the Contracted Services Agreement Between San Leandro Unified School District and Soliant Health for Vision Specialist for the 2012-2013 School Year
Policy/Code
Board Policy 6159(a)
Background Information
To remain compliant with Federal and State special education law, a district needs to have access to practitioners in the areas of disability present in that district. San Leandro Unified has children with vision loss and we are required to provide them with appropriate services. This is a speciality area where qualified staff are in short supply. The vision specialist began on March 6, 2013 and will complete services on June 13, 2013. For next year, we have already secured a SELPA vision specialist who will not require a fee to secure the service.
FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
Soliant Health
13.6. Memorandum of Understanding Between San Leandro Unified School District and Girls Incorporated for Mental Health Counseling Services for the 2013-2014 School Year
Fiscal Impact
$36,000 from District EIA Centralized Services Budget
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the Memorandum of Understanding Between San Leandro Unified School District and Girls Incorporated for Mental Health Counseling Services for the 2013-2014 School Year
Policy/Code
Local Education Agency Plan (LEAP)High Leverage Action Step #4
Background Information

As part of our efforts to develop a sustainable Behavioral Tiered Intervention System through our community schools partnerships, the District has been in development for a sustainable system for behavioral health services to support our Coordination of Services Team (COST) referrals. The system requires mental health counseling services for every school site staffed by our intentional partners. Girls Incorporated has agreed to provide 9 mental health interns who will provide direct therapeutic services at the following school sites:

  • Garfield School
  • Jefferson School 
  • Roosevelt School
  • Washington School
  • Muir Middle School
  • Lincoln High School

These services support students experiencing emotional, social, or behavioral challenges that are hindering their academic success. The mental health services will use applicable and culturally relevant interventions and practical strategies and tools that students can utilize in and outside of school.

The District will pay each mental health intern $4,000 for the school year, and Girls Incorporated will cover the remaining costs.

FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
Girls Inc MOU
13.7. Memorandum of Understanding Between San Leandro Unified School District and East Bay Agency for Children for Mental Health Services for the 2013-2014 School Year
Fiscal Impact
No impact to the General Fund; $10,000 for 3-4 interns (will be adjusted accordingly)from District EIA Centralized Services Budget; $9,500 from Positive School Climate Grant Budget
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the Memorandum of Understanding Between San Leandro Unified School District and East Bay Agency for Children for Mental Health Services for the 2013-2014 School Year
Policy/Code
Local Education Agency Plan (LEAP) High Leverage Action Step #4
Background Information

As part of our efforts to develop a sustainable Behavioral Tiered Intervention System through our community schools partnerships, the District has been in development for a sustainable system for behavioral health services to support our Coordination of Services Team (COST) referrals. The system requires mental health counseling services for every school site staffed by our intentional partners. East Bay Agency for Children (EBAC) will provide 3-4 direct therapeutic services at the following school sites:

  • Wilson Elementary School
  • Bancroft Middle School
  • San Leandro High School/FTK Campus

These services support students experiencing emotional, social, or behavioral challenges that are hindering their academic success. The mental health services will use applicable and culturally relevant interventions and practical strategies and tools that students can utilize in and outside of school.  In addition, EBAC will provide violence prevention workshops for students, families and staff at each of the elementary schools.  

The memorandum of understanding describes the services in detail.

 

 

FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
EBAC MOU
13.8. Discard Damaged Textbooks at the Instructional Materials Center (IMC) at District Office
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation

Approve Discard of Damaged Textbooks at the Instructional Materials Center (IMC) at District Office

Policy/Code
Board Policy 3270 Education Code 60500
Background Information

In accordance with Board Policy BP 3270, the District Office seeks to dispose of damaged textbooks located at the Instructional Material Center (IMC) at District Office. (Refer to attached listing for specific information.)

FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
IMC Discards-April 2013
13.9. Memorandum of Understanding Between San Leandro Unified School District and Family Service Counseling Center for Mental Health Services at San Leandro High School for the 2013-2014 School Year
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the Memorandum of Understanding Between San Leandro Unified School District and Family Service Counseling Center for Mental Health Services at San Leandro High School for the 2013-2014 School Year
Policy/Code
Local Education Agency Plan (LEAP) High Leverage Action #4
Background Information

In building the vision of full service community schools, the District has been working on a sustainable implementation plan that includes community agency partners to support the needs of our students and families. As part of this collaboration, the District opened the Office of Student and Family Wellness (OSFW) this school year with the intent to provide mental health services and other socio-emotional programs for our students and families with the goal of supporting healthy students and healthy minds. One part of these efforts is to develop agreements with various agencies to provide mental health supports. One of the agencies will be the Family Services Counseling and Community Resource Center who will be providing pro bono services for our students with one mental health intern for direct clinical services at San Leandro High School.

The MOU describes the services in detail. We are fortunate to receive these free services for our students and families.

 

FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
FSCC MOU 13-14
13.10. Revision of Board Policy 3440 and Administrative Regulations 3440 (a-c), Inventories
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the Revision of Board Policy 3440 and Administrative Regulations 3440 (a-c), Inventories.
Board Committee
The Board Policy Committee met on May 15, 2013
Policy/Code
Board Policy 3440 and Administrative Regulations 3440, INVENTORIES; Ed Code 35168 Inventory of Equipment.
Background Information
During our Federal Program Monitoring (FPM) process, the District became aware that it needed to revise and update portions of our Board Policy and Administrative Regulations on Inventories of Equipment. Most of the changes were standard updates from the CSBA Model policies that reworded entire sections of the policy and regulations. There are two areas that were shared and discussed at the Board Curriculum Committee on May 15, 2013. On page 1 of the Board Policy 3440 we changed unit cost of $300 to $500 in item #2 as the threshold when we would need to follow the state procedures for inventoring equipment. This now matches the $500 amount in item #1 and it also matches the amount audited in FPM. The other important change was an update of the language in AR 3440 that refers to the requirement of a "physical inventory of equipment" every 2 years. We added the mandatory phrase requiring "the results reconciled with the property records".
FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
Rev BP AR 3440 Inventories
13.11. 2012-2013 Non-Public School/Agency Contracts
Fiscal Impact
$13,761.25 - Special Education funds.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve non-public school/agency contracts as listed above for the 2012-2013 school year.
Board Committee
Not Applicable
Policy/Code
Education Code: 56365(a) Education Code: 56361(3) Education Code: 56366
Background Information

New non-public school placement and agency contracts for the school year 2012-2013.

 

Student # DOB Cost Location
# 1 09/12/99

$8,109.00

Seneca Family of Agencies
# 2 02/25/01

$249.00

Spectrum Center, Inc. (Addendum to initial ISA approved 04/11/13)
# 3 05/06/00

$266.00

Spectrum Center, Inc. (Addendum to initial ISA Approved 5/13/13)
# 4 06/05/96

$342.75

Spectrum Center, Inc. (Addendum to initial ISA Approved 9/13/12/)
# 5 06/07/04

$4,794.50

Spectrum Center, Inc. (Addendum to initial ISA Approved 4/11/13)

 

Total

 

 

$13,761.25

 

 

FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
Seneca Family of Agencies
Spectrum Center, Inc.
13.12. Acceptance of Donations for May 21, 2013
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve Acceptance of Donations for May 21, 2013
Policy/Code
BP 3290 Acceptance of Donations
FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
Acceptance of Donations 5-21-13
14. Business and Operations
14.1. Ratification of Payroll
Quick Summary/Staff Recommendation
Ratify April payroll in the amount of $5,654,750.99.
14.2. Approval of Bill Warrants
Quick Summary/Staff Recommendation
Approve Bill Warrants #88-50245862 - #88-50259200 in the amount of $6,759,718.72.
Attachments:
Bill Warrants - #88-50245862 - #88-50259200
14.3. Intra-Budget Transfers and Revisions
Quick Summary/Staff Recommendation
Approve the request for Intra-Budget Transfers and Revisions for April, 2013.
Attachments:
Intra-Budget Transfer
Intra-Budget Revision
14.4. Resolution #13-29 to Declare Certain Equipment Surplus and/or Obsolete
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Adopt Resolution #13-29 to declare equipment surplus and/or obsolete due to the age and condition of the designated equipment.
Policy/Code
Board Policy 3270(a); Administrative Regulations #3270 (a) #6.
Background Information
When district-owned books, equipment and supplies become unusable, obsolete, or no longer needed, the Superintendent or designee shall identify these items to the Governing Board, together with their estimated value and a recommendation that they be sold or disposed of by one of the methods prescribed in law and administrative regulations. With Board approval, the Superintendent or designee shall arrange for the sale or disposal of these items. Please see attached.
FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
Resolution #13-29 - Discard of Obsolete Equipment
14.5. Lease Agreement between San Leandro Unified School District and the City of San Leandro
Fiscal Impact
Lease agreement with the City of San Leandro is attached and the rental fee is $2,792 per month (including utilities and custodial costs). The cost will be paid out of the Measure B savings project for the District Office roofing and HVAC construction budget.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the lease agreement between the City of San Leandro and the San Leandro Unified School District for the property at 999 East 14th Street
Background Information
The final bond projects for Measure B Saving Phase I and Phase II, and Measure M are estimated to all be completed by December 2014. One of the final projects to be completed is the renovation of the District Office building which includes: replacement of the roof, replacement of the 40 year old HVAC units, massive duct work, etc. This project is expected to take five months to complete. The work is scheduled to begin on May 20, 2013 and to be completed in late September. In order to complete the work on the building, the staff has had to be relocated. The original plan was to move half of the staff into the Instructional Materials Center (IMC) which is located in a separate building at the back of the district office and to move the rest of the staff into temporary trailers to be to be located in the far west end of the District property. Unfortunately, within 48 hours of the delivery of the temporary trailers at about midnight on April 26, 2013, the trailers were completely destroyed by fire the cause of which has been designated as ?undetermined.? This meant that the remainder of the district would need to find an alternative location for staff. After exploring many different options, the City of San Leandro was contacted to see if leasing their unused property at 999 East 14th Street was an option. Chris Zapata, the City Manager, shared our situation with the Mayor and the City Council during his comments at the meeting on May 6, 2013. The Mayor and the Council gave full support to Chris Zapata, to see if there was a way to help us out. Through incredible flexibility and support, the district and the city have been able to enter into a lease agreement for the five month period that the district office is under renovation. The terms of the agreement are attached. The Superintendent and the Board of Education would like to extend our gratitude to the City Manager, the Mayor, the Council, and staff for working so fast, so hard, and so cooperatively with us to work out all of the details involved with a complex move such as this one. We could not be more appreciative. This is yet again reflective of the strong partnership between the City and the District. While we recognize that having district staff in two different locations, may cause an inconvenience for some staff and members of the public, we are doing our best to ensure a smooth transition. Please note that the following services will continue to be located at the district office (back of property) located at: 14735 Juniper Street: ? Student Support Services Department ? Special Education Department ? Curriculum and Instruction Department ? Food Services ? Information Technology ? Bond Projects The following services will now be located at 999 East 14th Street (building next to/south of the San Leandro Police Department: ? Superintendent?s Office ? Human Resources ? Business Services (accounts payable, purchasing, etc.) ? Payroll ? Employee Benefits ? Human Resources
FROM:
Song Chin-Bendib, Assistant Superintendent, Business and operations
Attachments:
Lease Agreement with City of San Leandro
14.6. Agreement between Northern California Local 355 Utility and Landscape J.A.T.C. Apprenticeship Program and San Leandro Unified School District Adult School
Fiscal Impact
The Adult School will retain 20% of all dispersed funds as the LEA and the District would retain 5% of all funding dispersed through the Adult School. Estimated amount unknown at this time.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the agreement between Northern California Local 355 Utility and Landscape J.A.T.C. Apprenticeship Program and San Leandro Unified School District Adult School
Background Information
Cureently the San Leandro Adult Schools offers serveral apprenticeship programs. they are seeking to add another such program to their offerings. This agreement between the Northern California Local 355 Utility and Landscape J.A.T.C. Apprenticeship Program and San Leandro Adult School will allow individuals to enter a 9,000 hour landscape training program that is usually completed in five years. The program has jurisdiction in forty-four counties in northern California and fourteen counties in Northern Nevada. Landscape Fitters provide services including irrigation, backfill trenches, setting boulders, soil preparation, planting, and laying sod. Utility Fitters perform services in the landscape fitting and irrigation industry. Work covered includes all installations of underground services performed in construction including utilities, water, sewers, storm drains leading to and from treatment plants, pump stations, or reservoirs. The instructor for this apprenticeship program will be paid by the Northern California Local 355 Utility Landscape J.A.T.C. There will be no instructional costs to the Adult School. There is no cost to the students who enter this program. Managing all aspects of the program will be the responsibility of the Northern California Local 355 Utility Landscape J.A.T.C. There will be no cost to the Adult School or the District. As with all apprenticeship programs, the Adult School will be the Local Education Agency (LEA) using federal Montoya funds to assist the Northern California Local 355 Utility and Landscape J.A.T.C. Apprenticeship Program. The Adult School will retain 20% of all dispersed funds as the LEA and the District would retain 5% of all funding dispersed through the Adult School. All students must be registered with the California Department of Apprenticeship Standards and verified by the Adult School. All student attendance records must be verified by the Adult School. As with all apprenticeship programs, the State of California, Department of Industrial Relations, Division of Apprenticeship Standards (DAS), will monitor this partnership, at no cost to the Adult School. DAS Apprenticeship Consultant, Victor Rodriquez, is approving this partnership to move forward on behalf of the State of California, once the San Leandro Unified School District Board of Education approves this agreement.
FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
J.A.T.C. Apprenticeship Program
14.7. Contract for Services between Folger Graphics and San Leandro Adult School
Fiscal Impact
The annual cost for the 2013-2014 school year services will be less than $20,000, paid out of the Adult School?s Workforce Investment Act, Title II federal money.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the contract between Folger Graphics and the San Leandro Adult School.
Background Information
This contract with Folger Graphics is for the services provided to the Adult School. The services include printing and distributing the Adult School?s brochure twice annually in the 2013-2014 school year. Additionally, this contract is for the printed materials used for marketing and forms used by the Adult School. Adult Schools are required to produce and distribute a brochure that announces classes paid for in part by State and/or Federal money. After going out for bids in prior years, Folger Graphics has continued to be the lowest cost. They are also a locally owned company. As a result, the Adult School changed from another competitor to Folger Graphics two years ago. The financial costs of this contract may be paid for out of the Adult School?s Workforce Investment Act, Title II federal money.
FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
Folger Graphics Invoice
14.8. Contract for Services between Administrative Software Applications, Inc. (ASAP) and San Leandro Unified School District Adult School
Fiscal Impact
The annual cost for the 2013-2014 school year services will be $8,626, paid for out of WIA federal money.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the contract between Administrative Software Applications, Inc. and the San Leandro Unified School District Adult School
Background Information
This contract with Administrative Software Applications, Inc. (ASAP) is for the services provided to the Adult School. The services include providing and maintaining the Adult School student attendance software/database, online student registration and student tuition collection, and teacher contracts, plus all of the Adult School?s mandated reporting to the State and Federal Government. ASAP is one of the few California Department of Education approved vendors that provide this service. The Adult School has been using ASAP?s services for over ten years. Contracting with ASAP or one of its competitors is mandated in order to continue to receive certain State and Federal funds. An example of these funds that the Adult School receives is the Workforce Investment Act, Title II (WIA) federal funds which exceeds $400,000 per school year. The financial costs of this contract may be paid for out of the above WIA federal money.
FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
ASAP Invoice
14.9. Contracts for amounts $5,000 or less for fiscal year 2012-2013.
Fiscal Impact
None, but each contract will be funded based on its budget source requested.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve contracts on the attached spreadsheet which are for amounts $5,000 or less for fiscal year 2012-2013.
Board Committee
Finance Committee on June 20, 2011
Background Information
Attached is the "summary spreadsheet for all contracts $5,000 or less for fiscal year". The spreadsheet will be provided to the Board at every board meeting if there are any contracts falling under this category. Detailed contract information will not be part of the Board packet but will be available for questions or inspection upon request. For accounting purposes, each contract still requires submission of a requisition for approval by site administrator. All contracts require two signatures - Initiating Administrator and the Chief Business Officer or a Cabinet member.
FROM:
Song Chin-Bendib, Assistant Superintendent, Business & Operations
Attachments:
$5,000 or Less Worksheet
15. Facilities and Construction
15.1. Change Order #6 to the Construction Contract with Zolman Construction and Development Inc. for the Pacific Sports Complex and Burrell Field Project
Fiscal Impact
The project is funded by Measure M Local Bond funds. This change order #6 represents an increase of $54,749, for a new contract amount of $13,164,984. This new contract amount is an increase of 0.42% to the new contract amount under deductive Change Order #1, and still a decrease of $335,016 to the original contract amount of $13,500,000. The project is within the hard cost budget of $13,519,613.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve Change Order #6, in the amount of $54,749, to the Construction Contract with Zolman Construction and Development, Inc. for the Pacific Sports Complex and Burrell Field Project.
Board Committee
Facilities and Technology Committee: May 15, 2013.
Background Information

One of the major marquee projects identified in the Measure M language is the SLUSD Pacific Sports Complex and Burrell Field.  AEDIS Architecture & Planning was retained to design and prepare all of the design and construction documents.  Plans and specifications were approved by the Division of the State Architect (DSA) and the project was bid through the requirements of Public Contract Code.  

The Board approved the construction contract with Zolman Construction and Development Inc. on May 15, 2012, in the amount of $13,500,000.

Change Order #1, a deductive change order, in the amount of <$646,387>, was approved by the Board of Education on July 17, 2012.

(Prior to awarding the contract, the Board authorized the transfer of $1,627,000 from the Measure M financial reserve to fund additional scope and escalation costs.  To minimize the need to expend all of the transferred funds staff conducted a value engineering process with AEDIS Architects and the contractor Zolman.  The contractor?s value for the items was negotiated and included in the above-mentioned deductive change order.)

Change Order #2, in the amount of $23,549, was approved by the Board of Education on November 6, 2012, to address unforeseen conditions (i.e. demolition of additional concrete curb footage, additional sanitary sewer line, removal and disposal of asbestos, and removal of two concrete pads not shown on plans).

Change Order #3, approved by the Board of Education on December 4, 2012, in the amount of $92,324.30, for the removal and disposal of additional asphalt paving containing asbestos ;and for the drilling of an additional 180 feet in depth for the irrigation well per the Geo Consultant .

Change Order #4, approved by the Board of Education on April 9, 2013, in the amount of $59,755, addressed field conditions, and provided value, flexibility and functionality, including the installation of underground conduit to accommodate future solar panel installations.

Change Order #5, in the amount of $80,894, addressed hidden field conditions and underground obstructions, additional functionality for storm water system lift stations and additional structural members at the ticket booth.  It included a credit in the amount of <$3,761> for reducing the depth of the irrigation well.

This Change Order #6, in the amount of $54,749, is for the provision of security cameras for the Burrell football field, buildings, bleachers and associated structures and was requested by the District. 

Contract Summary

Item

Item Amount

Running Contract Total

Total Contract Increase

Original Contract

$13,500,000

$13,500,000

0%

CO #1

-$646,387

$12,853,613

-4.8%

CO #2

$23,549

$12,877,162

0.18%

CO #3

$92,324

$12,969,486

0.9%

CO #4

$59,755

$13,029,241

0.46%

CO #5

$80,994

$13,110,235

0.62%

CO #6

$54,749

$13,164,984

0.42%

Budget Summary

SLUSD Pacific Sports Complex and Burrell Field Project
Soft Cost Budget

$4,088,437

Hard Cost Budget

     Construction

     Construction Contingency

 

$12,853,613

$666,000

                                  $13,519,613

Project Contingency

$255,453

Total Project Budget

$17,863,503

 

FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
Change Order #6 - Zolman Construction & Development, Inc.
15.2. Amendment No. 4 to the Professional Services Contract with Fugro Consultants, Inc. Geotechnical for Measure M to Include Special Inspection and Testing (T&I) for the John Muir and Bancroft Middle School Projects
Fiscal Impact
Consulting, testing and inspection services are paid through local Measure M Bond.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve Amendment #4, in the amount of $61,535, to the professional services contract with Fugro Consultants, Inc., to include special inspection and testing for (T&I) John Muir and Bancroft Middle Schools.
Board Committee
Facilities and Technology Committee: May 15, 2013
Background Information

The Board of Education previously approved Fugro Consultants, Inc., through a Request for Qualifications (RFQ) process for geotechnical engineering and soils investigations.  The original contract in the amount of $72,500 was approved by the Board on April 5, 2011, between Fugro Consultants Inc. and San Leandro Unified School District to provide geotechnical engineering and soils investigation services (soils report) for the Pacific Sports Complex and the SLHS Swim Center.

On April 17, 2012, the Board of Education approved Amendment #1 to include services needed to provide geotechnical data for the design of the John Muir Middle School artificial turf field, all-weather track, and associated bio -swale to mitigate storm water runoff.

On July 17, 2012, the Board approved Amendment #2 to include services needed to provide special inspections and testing for the construction of the San Leandro High School Pool Facility and Fields project, as well as Amendment #3 to provide special inspections and testing for the construction of the Pacific Sports Complex and Burrell Field project.

This amendment, #4, adds services needed to provide special inspections and testing (T&I) for the John Muir and Bancroft Middle School projects.

Contract/Fee Summary

Item Project Fee Running Total % Increase
Initial Contract Pacific/Burrell ? soils report

$41,500

$41,500

0

SLHS Pool ? soils report

$31,000

$72,500

Amendment #1 Muir MS ? soils report

$16,000

$88,500

22%

Amendment #2 SLHS Pool & Fields ? T&I

$113,120

$201,620

128%

Amendment #3 Pacific/Burrell ?T&I

$119,840

$321,460

59%

Amendment #4 Muir MS ? T&I

$48,940

$370,400

19%

Bancroft MS ? T&I

$12,595

$382,995

 

FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
Amendment #4 - Fugro Consultants, Inc.
15.3. Agreement between the City of San Leandro and the San Leandro Unified School District for the Right to Construct A Walking Path on City Land at McCartney Park Located Adjacent to Washington Elementary School
Fiscal Impact
Construction of the walking path is paid by Measure M Bond Funds.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the agreement between the City of San Leandro and the San Leandro Unified School District for the right to construct a walking path on City land at McCartney Park located adjacent to Washington Elementary School.
Board Committee
Facilities and Technology Committee: May 15, 2013
Background Information
In November 2010, San Leandro voters passed Measure M, a $50.1 million school facilities bond to address modernization and new construction throughout the District, including the renovation of all elementary school athletic exteriors, which includes new play structures and improvements at all eight elementary schools, including walking paths or par courses. In order to gain access to construct a walking path on city land at McCartney Park located adjacent to Washington Elementary School, an agreement between the City of San Leandro and The San Leandro Unified School District has been negotiated and mutually agreed upon which outlines the provisions regarding site access for construction and future maintenance of the walking Path.
FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
Walking Path Agreement
15.4. Contract with Lemke Landscape for the Landscape Renovation of the McKinley Elementary School Back Field
Fiscal Impact
Projects will be funded from the Measure B savings.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the contract for landscape renovation of the McKinley Elementary School Back Field, in the amount of $26,144.30, with Lempke Landscaping, to be funded from Measure B savings.
Board Committee
Facilities and Technology Committee: May 15, 2013
Background Information
One of the marquee projects funded by the Measure M bond program is the San Leandro High School Field & Pool project. Projected construction completion time is August 2013 with the exception of the synthetic football field which was completed in early April 2013. During construction of the fields, the High School sports teams were displaced and had to be relocated to the McKinley Elementary Field for football and soccer practices because it is closest to the High School to save on transportation costs. Due to intense use of the McKinley field for approximately six months, September 2012 through February 2013, the field needs to be restored to its original condition. In order for seeding and grass to take root and be ready for use by the school in the Fall, we must start the repair work immediately. It takes a minimum of 3 months for a newly seeded field to be ready for use. Staff had solicited quotes from a couple of vendors and Lemke Landscape came to be the lowest cost. Additionally, the District has utilized the service of Lemke Landscape for landscape renovation projects in the past. Staff recommends approval of the Lemke landscape contract, in the amount of $26,144.30, for landscape renovation of the McKinley Elementary School Back Field (see attached contract).
FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
Lemke Landscape Invoice
15.5. Construction Contract with On Point Construction for the Measure B Savings Madison Elementary School Seismic and Windows Project
Fiscal Impact
The cost of construction services is included in the approved Measure B savings project list from the August 2012.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the Construction Contract, in the amount of $405,600, with On Point Construction for the Seismic and Windows Project at Madison Elementary School.
Background Information

On August 21, 2012, the Board of Education approved the creation and funding of the Madison Elementary School Seismic and Windows Project from Measure B Savings.

On May 7, 2013, the District received two bids for the seismic work and installation of windows at Madison Elementary School, per Public Contract Code requirements.  The low responsive, responsible bidder was On Point Construction, in the amount of $355,600. The estimated project budget was $450,000.

The agreement has been reviewed by the District?s former legal counsel and the template has been used as the District standard through Measure B.

Bid Summary

 

Bidder

Amount

1

On Point Construction

$355,600

2

Bay View Painting & Construction

$474,400

 There is a $50,000 owner controlled allowance for hidden conditions called for  on the bid form, therefore the original contract amount will be $355,600 + $50,000 = $405,600.

Budget Summary

Madison ES District Offices & Instructional Materials Center (IMC) HVAC and Roof Replacement, Generator, SDC Restroom, Seismic & Window Project
Soft Cost Budget

$917,977

Hard Cost Budget

     Construction (Emer. Generator)

     Construction (SDC Restroom)

     Construction (HVAC, Roof, etc.)

     Construction (Seismic windows)

     Interim housing                         

     Construction Contingency

                                      

                               $165,000

$85,000

$1,047,000

$450,000

                                $125,000

$328,000

Project Contingency

$217,023

Total Project Budget

$3,335,000

 

FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
On Point Construction Contract for Madison project
15.6. Construction Agreement with WA Thomas Co., Inc. for the Measure B Savings Wilson Elementary School and John Muir Middle School Modernization Projects
Fiscal Impact
The cost of construction services is included in the approved Measure B savings project list from the August 21, 2012 meeting.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the construction agreement, in the amount of $924,000, with WA Thomas Co., Inc. for the Wilson Elementary School and John Muir Middle School modernization projects.
Background Information

On August 21, 2013, the Board of Education approved the creation and funding of Wilson Elementary School and John Muir Middle School Modernization Projects from Measure B Savings.

On April 30, 2013, the District conducted a formal sealed bid opening process, per State of California Public Contract Code requirements, for construction site work on the Muir Middle School & Wilson Elementary School Modernization Project.

Three (3) bids were received for the project. The lowest responsive, responsible bidder was WA Thomas Co. Inc. at $899,000.  There is a $25,000 owner controlled allowance for hidden conditions called for  on the bid form, therefore the original contract amount will be $899,000 + $25,000 = $924,000.

The agreement has been reviewed by the District?s former legal counsel and the template has been used as the District standard through Measure B.

Bid Summary

 

Bidder

Amount

1

WA Thomas Co., Inc.

$899,000

2

E.F. Brett & Co.

$929,000

3

Cal Pacific

$1,263,000

 The estimated project budget was $1,100,000 for Muir and $287,000 for Wilson, for a total of $1,387,000 for both projects.

Budget Summary

Muir MS & Wilson ES Modernization Project
Soft Cost Budget

$552,108

Hard Cost Budget

     Construction

     Change Order Contingency

                                     $1,472,509

$924,000

$548,509

 

Project Contingency

$55,407

Total Project Budget

$2,080,024

 

FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
Agreement with WA Thomas Co. - Modernization Projects
15.7. Agreement with Enviroplex for the Fabrication and Installation of the Adult School Modular Classroom building (at 1448 Williams Street)
Fiscal Impact
Portable buildings are paid by Measure B Bond Funds.
TO:
Cindy M. Cathey, Superintendent
 
Quick Summary/Staff Recommendation
Approve the Agreement in the amount of $225,000 with Enviroplex Inc. for the Fabrication and Installation of a Modular Computer Classroom at the San Leandro Adult School.
Board Committee
Facilities and Technology Committee: May 15, 2013
Background Information

On April 1, 2008, the Board approved Jeffery E. Wong Architects to provide architectural design services for the John Muir Middle School Renovation and Upgrade Project.  The scope of the original contract includes restroom renovations, interior classroom light fixture replacements, interior classroom painting, roofing replacement, and heating upgrades.

On July 19, 2011, the Board approved $16,978,500 in projects to be funded through Measure B Savings.  Subsequently, on August 2, 2011, the Board approved a prioritized list of additional projects to be funded.

On April 9, 2013, the Board approved Amendment #10 to the Harris & Associates professional services contract for one new project: the Adult School New Modular Classroom; Amendment #6 to the DSA IOR Professional Services Agreement with Jerome R. Zalinski, which includes this project; and Jeff Wong Architect was chosen as the Adult School architect because he designed the first two phases and the master plan at the Adult school.

For the modular classroom building, Jeffery Wong Architect and staff are recommending the utilization of a State approved and established procurement and delivery method commonly referred to as ?piggyback contract?.  For the purchase and install of modular/portable classroom buildings this delivery method allows relatively rapid procurement, fabrication, delivery, and installation of a portable multipurpose building at a competitive price. 

Piggyback contracting method can be used to procure equipment and portable classroom buildings.  An original awarding agency issues bid documents, advertises, and receives competitive bids.  In those bid documents there is clause that allows follow-on awarding agencies across the state to, in effect, write a change order to that original contract and receive the same competitive pricing.  In addition to knowing the pricing ahead of time, the other main advantage is that the original awarding agency has already satisfied all the bid advertising, notifications and other requirements of Public Contract Code.  This saves time, and allows factory fabrication to start earlier. 

In this case, there is a current competitively bid contract between Enviroplex Inc. and the New Jerusalem Elementary School, New Jerusalem Elementary School District (NJESD), Bid #09-1005, and this is now available for the San Leandro Unified School District to use for the purchase and installation of the building. On January 10, 2012, the Board of Trustees of the NJUSD approved awarding the Construction Contract Bid #09-1005 with Enviroplex, Inc. for new portable classroom/administration buildings and related sitework.

The Contract term of Bid #09-1005 is two (2) years after award.  Unit prices for all line items associated with this scope of work are to remain firm until January 6, 2013.  Through negotiations, the vendor has agreed to extend this pricing for this contract.

Pursuant to Public Contract Code Section 20118, other School Districts, public agencies, political subdivisions, municipalities, and tax supported agencies in the State of California may purchase portable buildings and associated alternates under the same terms and conditions of NJESD Bid #09-1005.

The District used this piggyback with Enviroplex to purchase the Adult School /Modular classroom.

The agreement has been reviewed by the District?s legal counsel Orbach, Huff, & Suarez, LLP.

Budget Summary

San Leandro Adult School Modular Computer Classroom Project
Soft Cost Budget

$125,000

Hard Cost Budget

     Construction ?Site work

     Modular Bldg w/Foundations

     Construction Contingency

 

$250,000

$225,000

  $25,000

                                        $500,000

Project Contingency

 $25,000

Total Project Budget

$650,000

 

FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
Piggyback Agreement with Enviroplex
16. ACTION ITEMS - 9:45-10:00 p.m.
16.1. Approval of Action Items
Quick Summary/Staff Recommendation
These items are presented for action at this time. Some may have been reviewed at a previous meeting.
17. Human Resources
17.1. Resolution #13-30 Reducing and/or Eliminating Specially Funded and General Funded Classified Services
Fiscal Impact
Approval of Resolution #13-30 will save school bugets approximately $79,000.
TO:
Cindy Cathey, Superintendent
 
Minutes:

The Board adopted Resolution #13-30 Reducing and/or Eliminating Specially Funded and General Funded Classified Services.

Actions:
Motion
- Motion made by Lance James and a seconded by Mike Katz-Lacabe.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
Adopt Resolution #13-30 Reducing and/or Eliminating Specially Funded and General Funded Classified Services.
Board Committee
Not applicable
Policy/Code
Education Codes 45308 and 45117
Background Information
Each year, school sites review their budgets with staff and school site councils. Decisions are made about how to spend site money and some sites use this money to pay for extra classified staff positions. Prior to the end of each school year, school sites and school site councils make decisions about whether or not to continue providing services performed by classified employees and/or if there is a lack of funds to provide these services. If there is a lack of work because sites do not intend to continue providing services and/or there is a lack of funds to provide these services, the classified employees in these positions must be laid off. Resolution #13-30 eliminates site-funded positions due to a lack of work and/or lack of funds. Approval of Resolution #13-30 will eliminate these positions and authorize staff to notice the affected employees.
FROM:
John Thompson, Ed.D. Senior Director II, Human Resources
Attachments:
Resolution #13-13 Elimination of Classified Services
18. Educational Services
18.1. Proposed Expulsion Order
TO:
Cindy M Cathey, Superintndant
 
Minutes:

The Board approved the recommendation from the Administrative Panel for the Expulsion Order Case E02-12/13.

Actions:
Motion
- Motion made by Lance James and a seconded by Jason Toro.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
Approve the Recomendaton from the Administrative Panel for the Expulsion Order for Case E02-12/13.
FROM:
Debbie Wong, Assistant Superintendant, Educational Services
19. Facilities and Construction
19.1. Resolution #13-32 Providing for The Issuance and Sale of General Obligation Bonds, Election Of 2010, Series B, In the Aggregate Principal Amount of Not To Exceed $20,100,000
Fiscal Impact
The not-to-exceed $20,100,000 Measure M General Obligation Bond, Series B comes from an ad valorem tax against the taxable property in the District.
TO:
Cindy M. Cathey, Superintendent
 
Minutes:

Assistant Superintendent Song Chin-Bendib explained that the District issued the first series of the Measure M Authorization in April 2011 and is ready to issue the last series, Series B of its Measure M General Obligation Bonds at a maximum sale of $20,100,00. This will be a Competitive Sales Bond sale and not Capital Appreciation Bonds (CABs).

Following the explanation, the Board adopted Resolution #13-32 Providing for The Issuance and Sale of General Obligation Bonds, Election Of 2012, Series B, In the Aggregate Principal Amount of Not to Exceed $20,100,000.

Actions:
Motion
- Motion made by Lance James and a seconded by Mike Katz-Lacabe.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
Adopt Resolution #13-32 authorizing the issuance and sale of San Leandro Unified School District (Alameda County, California), General Obligation Bonds, Election of 2010, Series B, in the aggregate principal amount not to exceed $20,100,000, to finance the construction and improvement of real property.
Background Information

At the November 2, 2010, election, 63.10% of the qualified electors of the San Leandro Unified School District approved the issuance and sale of general obligation bonds of the District for various purposes set forth in the ballot submitted to the voters, in the maximum amount of $50,100,000 payable from the levy of an ad valorem tax against the taxable property in the District.

The District issued the first series of the Measure M Authorization in April 2011 and is ready to issue the last series, Series B of its Measure M General Obligation Bonds.

Ruth Alahydoian, District Financial Advisor from KNN Public Finance, provided a presentation on the sale of this Series B on March 5, 2013.   Included in the presentation were:

  • Measure B and Measure M Project Timelines & Cash Needs
  • Recently introduced legislation affecting school bonds & discussion on Capital Appreciation Bonds (CABs)
  • Current bond market conditions & potential to refinance existing bonds
  • Financing schedule for bond issuance

Included in this Board packet are:

  • Resolution #13-32 authorizing the sale of the bonds and accompanying documents
    • Sets a maximum sale of $20,100,000 (the remaining authorization).
    • Authorizes district staff to prepare and finalize other documents.
    • Designates the Superintendent and Assistant Superintendent as the Authorized Officers of the District.
    • Authorizes a competitive sale.
    • Authorizes the use of professional services (bond counsel and financial advisor) and provides an estimate of the costs of issuance (see attached spreadsheet).
    • Authorizes the repayment of bonds from tax collections and directs the County to set the appropriate tax rate
  • Agent Agreement with technical parameters of bond administration.
  • Forms of Notice of Intention to Sell and Notice of Sale providing parameters of the competitive sale of the bonds.
  • Draft of the Preliminary Official Statement providing the District?s disclosure to potential investors.

The District Financial Advisor will be present at the Board meeting and can respond to any questions the Board or public has.

FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
Resolution 13-32 - General Obligation Bonds, Series B
Official Notice of Sale - GOB Series B
Paying Agent Agreement - GOB Series B
Cost of Bond Issuance
19.2. Resolution #13-33 Providing for The Issuance and Sale of General Obligation Bonds, Election Of 2006, Series E, In the Aggregate Principal Amount of Not To Exceed $11,673,613
Fiscal Impact
The not-to-exceed $11,673,613 Measure B General Obligation Bond, Series E comes from an ad valorem tax against the taxable property in the District.
TO:
Cindy M. Cathey, Superintendent
 
Minutes:

Responding to Trustee L?pez, Assistant Superintendent Song Chin-Bendib reiterated that the District was not engaging in a Capital Appreciation Bonds (CABs) and this is a Competitive Sales Bond sale at a maximum of $11,673,613 (the remaining authorization).

Following the explanation, the Board adopted Resolution #13-33 Providing for The Issuance and  Sale of General Obligation Bonds, Election Of 2006, Series E, In the Aggregate Principal Amount of Not To Exceed $11,673,613.

Actions:
Motion
- Motion made by Lance James and a seconded by Mike Katz-Lacabe.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
Adopt Resolution #13-33 authorizing the issuance and sale of San Leandro Unified School District (Alameda County, California), General Obligation Bonds, Election of 2006, Series E, in the aggregate principal amount not to exceed $11,673,613, to finance the construction and improvement of real property.
Background Information

At the November 7, 2006, election, 61.88% of the qualified electors of the San Leandro Unified School District approved the issuance and sale of general obligation bonds of the District for various purposes set forth in the ballot submitted to the voters, in the maximum amount of $109,000,000 payable from the levy of an ad valorem tax against the taxable property in the District.

The District has issued four series of the Measure B Authorization and is ready to issue the last series, Series E of its General Obligation Bonds.

Ruth Alahydoian, District Financial Advisor from KNN Public Finance, provided a presentation on the sale of this Series B on March 5, 2013.   Included in the presentation were:

  • Measure B and Measure M Project Timelines & Cash Needs
  • Recently introduced legislation affecting school bonds & discussion on CABs
  • Current bond market conditions & potential to refinance existing bonds
  • Financing schedule for bond issuance

Included in this Board packet are:

  • Resolution #13-33 authorizing the sale of the bonds and accompanying documents
    • Sets a maximum sale of $11,673,613 (the remaining authorization).
    • Authorizes district staff to prepare and final other documents.
    • Designates the Superintendent and Assistant Superintendent as the Authorized Officers of the District.
    • Authorizes a competitive sale.
    • Authorizes the use of professional services (bond counsel and financial advisor) and provides an estimate of the costs of issuance (see attached spreadsheet).
    • Authorizes the repayment of bonds from tax collections and directs the County to set the appropriate tax rate
  • Agent Agreement with technical parameters of bond administration.
  • Forms of Notice of Intention to Sell and Notice of Sale providing parameters of the competitive sale of the bonds.
  • Draft of the Preliminary Official Statement providing the District?s disclosure to potential investors.

The District Financial Advisor will be present at the Board meeting and can respond to any questions the Board or public has.

FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
Resolution #13-33 - General Obligation Bonds, Series E
Official Notice of Sale - GOB Series E
Cost of Bond Issuance - Series E
20. CONFERENCE ITEMS - 10:00-10:30 p.m.
21. General Services
21.1. Proposed Schedule for the 2013-2014 Board Meetings
Fiscal Impact

None

TO:
Board of Education
 
Minutes:

The Board approved the proposed schedule for the 2013-2014 Board meetings.

Actions:
Motion
- Motion made by Vince J. Rosato and a seconded by Lance James.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation

The Board will discuss and consider approving the proposed schedule for the Board meetings for 2013-2014.

Board Committee
Not Applicable
Policy/Code

Board By Law 9320 - Meetings and Notices

Background Information

Meetings of the Governing Board are conducted for the purpose of accomplishing district business.  At the beginning of each school year, the regular board meetings need to be scheduled.  The Board of Education for San Leandro Unified School District holds two regular meetings each month typically on the first and third Tuesday of each month. Shaded dates are placeholder meetings set aside for special work sessions, Unaudited Actuals, 1st and 2nd Interims and Adoption Budget approvals.  Federal holidays are included.  Also, please note that Cesar Chavez observance is Mach 31 and is a non-school day for students.  The first day of school for students is August 21.

Listed below are the Federal Holidays (green on calendar), Tentative Board Work Sessions (blue on calendar) and Special Board meetings due to budget development timeline (yellow on calendar).  Local holidays have not yet been finalized.    

Federal Holidays (Green on Calendar)

  • July 4 (4th of July Holiday)
  • September 2 (Labor Day Holiday)
  • November 11 (Veterans' Day Holiday)
  • November 28 (Thanksgiving Day)
  • December 25 (Christmas Day)
  • January 1 (New Years' Day)
  • January 20 (Martin Luther King Jr. Day)
  • February 17 (Presidents' Day)
  • May 26 (Memorial Day)

School Observance - no school for students

  • March 31 (Cesar Chavez Observance)

Tentative Board Work Sessions (Blue on Calendar)

  • October 8  
  • November 12        
  • January 21          
  • February 11         
  • May 13 

Special Board Meetings - Budget Reports (Yellow on Calendar)

  • September 10 (Unauditied Actuals)
  • December 10 (1st Interim Report)  
  • March 11 (2nd Interim before March 15)
  • June 24 (Adoption Budget)              

Holidays Not Yet Decided

  • November 25-29 (Thanksgiving Week)
  • December23-31; January 1-3 (Winter Recess Break)
  • February 17-21 (Presidents' Week
  • April 14-18 (Spring Break)
FROM:
Cindy M. Cathey, Superintendent
Attachments:
Proposed Sschedule of Board Meetings for 2013-2014
22. Educational Services
22.1. Revision to Board Policy and Administrative Regulations 1250: Visitors
TO:
Cindy M. Cathey, Superintendent
 
Minutes:

Trustee Katz-Lacabe was glad to see this come forward and felt that it was a reasonable request to have some kind of notification in advance of desired classroom visitations.

Trustee Prola raised a question whether or not adding "Unless otherwise directed by the principal or designee, a staff member shall accompany visitors while they are on school grounds" to the policy, was reasonable. Policy Chair Carey said it will depend on the situation, when it is appropriate, and staff availability, keeping in mind that the District is looking at safety for the teachers as well as allowing parent access to the classroom in a safe and appropriate manor. 

The Board approved the revision to Board Policy and Administrative Regulations 1250: Visitors as presented.

Actions:
Motion
- Motion made by Mike Katz-Lacabe and a seconded by Vince J. Rosato.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
Review and consider approving the proposed revisions to Board Policy 1250 and Administrative Regulation 1250: Visitors
Board Committee
Board Policy Committee meetings on March 13, April 17, and May 15, 2013
Policy/Code
Board Policy and Administrative Regulation 1250: Visitors
Background Information

Periodically, districts review and update Board Policies and Administrative Regulations to clarify language, comply with state or federal requirements, or based upon an expressed need. The District was asked to review Board Policy 1250 related to visitors. The Board Policy Committee met three times to address potential changes to this policy. As this policy is a complex one, staff looked at the California School Boards Association sample policy as well as policies from many surrounding districts. There were a number of items discussed as the policy and regulation language was reviewed. These items included: ? Definition of ?visitor? ? Inclusion of language that encourages all visitors to behave in an orderly manner and that per applicable law, allows the principal to request that an individual causing a disruption leave the school grounds ? Requirements for sex offenders on campus ? Registration requirements One item which included numerous conversations and the sharing of multiple perspectives was related to the classroom visits and how to ensure student and teacher safety while still upholding the Board?s desire to encourage parents/guardians and interested members of the community to visit the schools and view the educational programs. Several options were explored: Option # 1: Keep our current policy as it is. Options # 2. Change the wording to state: For classroom visitations, all visitors must notify the classroom teacher 24 hours in advance of the desired visitation or by prior arrangement with the classroom teacher. Option # 3. The teacher and/or principal/designee and parents/legal guardians will work together to arrange a time that is mutually agreeable for classroom visits. Such visits must be scheduled within 48 hours after the parent?s/legal guardian?s request or by prior arrangement with the teacher. Option # 4. Classroom visits or conferences will be scheduled within a reasonable time of the parent/legal guardian?s request. If a conference is desired, an appointment shall be set with the teacher during non-instructional time. The Policy Committee requested that staff seek input from parents. Given limited time, staff was only able to meet with parents from San Leandro High School as part of their Principals? Coffee and Conversation monthly meeting. The parents in attendance requested that the sentence ?Classroom visitations can also occur with less than 24 hour notice with approval of the teacher? be considered and added  to option #2. Attached are the proposed changes (in bold or in strikeout) to the Policy 1250 and the associated Regulations as recommended by the Board Policy Committee.

FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
BP AR 1250 Visitors
22.2. Proposal to Consolidate Two Part time Positions (.6 FTE Student Outreach Coordinator and .4 FTE BTSA Curriculum Specialist) into 1 FTE Coordinator of Educational Services Position, including Job Description
Fiscal Impact

There is no impact to the General Fund; The position is 100% categorically funded: $105,110 (base) $13,664 (salary driven costs)=$118,774 Total cost
 

  • McKinney Vento Grant: $10,777
  • ASES Grant: $20,665
  • ASSETS Grant: $37,496
  • Title I: $4,900
  • BTSA: $44,936

 

TO:
Cindy M. Cathey, Superintendent
 
Minutes:

The Board approved the Proposal to Consolidate Two Part Time Positions (.6 FTE Student Outreach Coordinator and .4 FTE BTSA curriculum Specialist) into 1 FTE Coordinator of Education /Services Position, including Job Description. 

Actions:
Motion
- Motion made by Mike Katz-Lacabe and a seconded by Lance James.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
Discuss and consider approval of the consolidation of the Student Outreach Coordinator and BTSA Curriculum Specialist Positions into Coordinator of Educational Services, Job Description, and Position
Background Information

Educational Services has two vacant administrative part-time positions  in two different departments.  Currently, the positions are:

  1. Student Support Services:  .6 Student Outreach/Grant Coordinator (Classified Administrator)
  2. Curriculum & Instruction:   .4 BTSA Curriculum Specialist (Certificated Administrator)

After a re-assessment of job responsibilities, Educational Services is proposing to consolidate both positions into a 1.0 certificated coordinator position for one year. This is not an increase in FTE.  The rationale for this consolidation is that the state and federal categorical funding that supports these current positions may or may not be ongoing.  For example, we will need to submit a new 21st Century ASSETs grant application for the 2014-2015 school year and it is highly competitive.  Also, as the District is in development phase for the future school-based health and wellness center, this position's responsibilities could change to support this work.   Consolidating the positions into a full time position will provide more flexibility and efficiency than two part time employees working a few days a week. 

Attached is a proposed job description for Coordinator of Educational Services for review. It lists the much needed responsibilities from both departments.  We seek to make this a certificated position as the job responsibilities are aligned to work closely with school sites and the individual must have a deep understanding of both programs and how schools work.  As a coordinator position, it is a slight upgrade of the position from an outreach/grant coordinator and curriculum specialist. However, this change is cost neutral because classified salary driven costs are higher than certificated salary driven costs.

This proposal is for the 2013-2014 school year only.  Given the moving parts, the position will be re-evaluated once funding is known and once there is more clarity on the impact of the school-based health center.

 

FROM:
Debbie Wong, Assistant Superintendent, Educational Services
Attachments:
Job Description - Coordinator of Educational Services
23. Business and Operations
23.1. Approval of the Public Disclosure of Collective Bargaining Agreement for the Teamsters Union Local NO. 856/Alameda Building and Trades Council
Fiscal Impact
The projected cost is $47,624 for 2012-13, $66,748 for 2013-14, and $76,197 for 2014-15.
TO:
Cindy M. Cathey, Superintendent
 
Minutes:

The Board approved the Public Disclosure of Collective Bargaining Agreement for the Teamsters Union Local No. 856/Alameda Building and Trades Council.

Actions:
Motion
- Motion made by Lance James and a seconded by Jason Toro.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
Approve the Public Disclosure of Collective Bargaining Agreement for the Teamsters Union Local NO. 856/Alameda Building and Trades Council.
Board Committee
Not Applicable
Policy/Code
Government Code 3547.5
Background Information
On April 22, 2013, the District and the Teamsters Union Local NO. 856/Alameda Building and Trades Council approved and signed off on a tentative agreement (TA). The TA contains components that address the following: 1) changes to collectively bargained language related to school beautification projects, employee uniforms, operations at Burrell Field, and PERS contributions. The TA also modifies the salary schedule for teamster and trades employees by adding additional longevity steps and changing the period of time between longevity steps. In addition, the TA provides a onetime payment of $855 to unit members for the 2012-13 school year to help offset rising healthcare costs. The Business Services Department has prepared the Public Disclosure Statement, Certification of the District?s ability to Meet the Costs of Collective Bargaining Agreement, in accordance with AG 1200, verifying that the District can afford to fund the TA. This document (attached) contains detailed and specific information about how this agreement affects District funds. The Alameda County Office of Education (ACOE) has reviewed this document and has verified that the District can afford to fund this agreement (document from ACOE is attached).
FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
Public Disclosure Documents for Agreement with Teamsters/Alameda Building and Trades Council
Approval Letter from ACOE
23.2. Ratification of Tentative Agreement between the San Leandro Unified School District and the Teamsters Union Local NO. 856/Alameda Building and Trades Council
Fiscal Impact
See the Business and Operations Conference Item on the agenda related to the approval of the Public Disclosure of Collective Bargaining Agreement for the Teamsters Union Local NO. 856/Alameda Building and Trades Council.
TO:
Cindy Cathey Superintendent
 
Minutes:

The Board ratified the tentative agreement between the San Leandro Unified School District and the Teamsters Union Local No. 856/Alameda Building and Trades Council.

Actions:
Motion
- Motion made by Lance James and a seconded by Vince J. Rosato.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
Ratify the tentative agreement between the San Leandro Unified School District and the Teamsters Union Local NO. 856/Alameda Building and Trades Council.
Board Committee
Not applicable
Policy/Code
Government Code 3547 Board Policies 4143 and 4243
Background Information
On April 22, 2013, the District and the Teamsters Union Local NO. 856/Alameda Building and Trades Council approved and signed off on a tentative agreement (TA). The TA contains components that address the following: 1) changes to collectively bargained language related to school beautification projects, employee uniforms, operations at Burrell Field, and PERS contributions. The TA also modifies the salary schedule for teamster and trades employees by adding additional longevity steps and changing the period of time between steps. In addition, the TA also provides a onetime payment of $855 to unit members for the 2012-13 school year to help offset rising healthcare costs. The Business Services Department has prepared the Public Disclosure Statement, Certification of the District?s ability to Meet the Costs of Collective Bargaining Agreement, in accordance with AG 1200, verifying that the District can afford to fund the TA.
FROM:
John Thompson, Ed.D. Senior Director II, Human Resources
Attachments:
Tentative Agreement with the Teamsters Union Local No. 856/Alameda Building Trades Council
24. Facilities and Construction
24.1. Approval of Measure B Savings Phase II Project/Scope List
Fiscal Impact
Measure B Phase II savings.
TO:
Cindy M. Cathey, Superintendent
 
Minutes:

The Board approved the list of Measure B Phase II Savings Projects.

Actions:
Motion
- Motion made by Lance James and a seconded by Ron Carey.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
Quick Summary/Staff Recommendation
Approve the list of Measure B phase II savings projects.
Board Committee
Facilities and Technology Committee: May 15, 2013
Background Information

The two most current bond measures approved by the San Leandro voters are Measure B (November 2006) and Measure M (November 2010). Once bond issuance proceeds are received the District is responsible for spending the funds on projects that comply with the bond measure ballot language.  Initial savings generated by the projects early in the program must be used to create and build projects that comply with the bond measure language and expended on the same timeline associated with the bond issuances.

To date, the bond program savings have been generated by a combination of factors, the primary being 1) Additional funding from Federal, State and non-bond Local sources 2) Sustained flat and/or deflationary pricing in the construction market 3) Highly efficient management, and 4) Low program, project and construction management cost structure.

The Phase I savings is estimated to be $27M while Phase II at $6.2M. The District has about $220M of unfunded needs not addressed by either Measure B and M bonds.

When the District started the discussion regarding savings with the Board nearly two years ago, not all the potential savings projects were created then. It was a work in progress with the intention to continuously address the most critical needs in the District. Additionally, the District?s prioritization of needs evolve over-time and the Board would like to reserve flexibility to address those needs.

Phase I Measure B savings: $27M

With flexibility to continuously address District?s unfunded facility needs in mind, the Board on July 19, 2011, approved $16,978,500 in projects to be funded through Measure B Phase I Savings.  Subsequently, on August 2, 2011, the Board approved a prioritized list of additional projects to be funded, bringing the today of Measure B Savings Phase I total to $25,197,900.

Phase II Measure B savings: $6.2M

For the new projects to be funded under Phase II Measure B savings, the District needs to start architects and project manager on the creation of these new projects and have the architect get into Division of State Architect (DSA) with plans by October 31, 2013, if the goal is to build these projects in 2014. We are currently falling behind schedule on this task.

Process for development of lists to be by Measure B savings

With the limited scope of recommending the allocation of $6.2M in new projects and scopes, the District staff, including maintenance & operations, information technology and the bond team reviewed and assembled the most pressing needs.  This list has been reviewed and prioritized over the past two months and presented to the Facilities and Technology committee.

The priorities for list are

  1. Seismic retrofits of district facilities
  2. Adult School Modular building (One and a half modular building units)
  3. Facility improvements that could improve safety and security
  4. High priority deferred maintenance needs
  5. Technology needs to get all schools up to a District standard.

The priorities were consistent with the priorities outlined in the 1997 District-wide Facilities Master Plan.

FROM:
Song Chin-Bendib, Assistant Superintendent, Business and Operations
Attachments:
DRAFT Measure B Savings, Phase II Project/Scope List
25. INFORMATION ITEMS - 10:30-10:35 p.m.
25.1. Information Items
Quick Summary/Staff Recommendation
These items are intended to keep the Board informed on various District business matters which do not require action by the Board.
26. Business and Operations
26.1. Miscellaneous Receipts
Minutes:

Miscellaneous Receipts in the amount of $22,391,739.63 has been deposited in the Treasury of Alameda County.

Quick Summary/Staff Recommendation
Miscellaneous Receipts in the amount of $22,391,739.63.
27. ADDITIONAL SUGGESTIONS AND COMMENTS FROM BOARD MEMBERS-10:35 pm
Minutes:

Trustee James attended the School Services of California May Revise Budget workshop.  He will be out of town June 16-19, 2013; and June 25-July 7, 2013, and will miss the June 18 Board meeting.

Trustee Carey shared that his son will be graduating with a BS in Athletic Training and he has been accepted in a Master's program (fully paid) at the California University of  Pennsylvania. He will also be working as a graduation assistant to help him through the year.  His daughter has completed her first year at San Jose State. Trustee Carey also wished Trustee James a "Happy Birthday."

Trustee Toro commented that it was nice to restore some of the budget cuts.  He raised concern about the future of the Adult School and Regional Occupational Programs (ROP).  He asked and received consensus to draft a resolution to maintain the District's commitment to ROP.

Trustee Rosato thanked District staff and the community for their input regarding the policy regarding "visitors".  He attended the City Council meeting last night where is wife was installed as a Commissioner on the Library and Historical Commission.  He would like to adjourn the meeting in memory of the victims of the tornado that hit Oklahoma. 

Trustee L?pez visited Lincoln Alternative High School and Jefferson Elementary School campuses where she was able to speak to both principals. She is planning on visiting another campus tomorrow.  

Trustee Katz-Lacabe commented on the great Bancroft Musical Theater production of "Guys and Dolls" held at the Arts Education Center, adding that also in attendance was former Assistant City Manager Jacqui Diaz, and the City's new Chief Innovation Officer, Deborah Acosta.

Trustee Prola attended the California School Boards Association Legislative Action Day on May 10 with Assemblymember Bonta who is sponsoring AB 59 which would provide clarification of parcel tax language with regards to implementation of all groups.  On May 16 she attended a reception for the AP Art exhibit at the Arts Educational Center.  She attended the City Council meeting last night and thanked them for allowing the District Office to move into their spare offices. Trustee Prola announced that a reception is being planned to honor Superintendent Cathey on her retirement on June 18, 6 p.m. (before the meeting).  She also recognized her colleagues for all of their work on the Superintendent Search which hopefully will be completed this weekend. 

28. ANNOUNCEMENT
28.1. Board of Education Meetings
Minutes:
  • Special Board Meeting - May 22, 2013
  • Special Board Meeting - May 23, 2013
  • Special Board Meeting - May 24, 2013
  • Special Board Meeting - May 25, 2013
  • Regular Board Meeting - June 4, 2013
  • Regular Board Meeting - June 18, 2013
  • Special Board Meeting - June 25, 2013 (District Office)

 

Quick Summary/Staff Recommendation
  • Special Board Meeting - May 22, 2013
  • Special Board Meeting - May 23, 2013
  • Special Board Meeting - May 24, 2013
  • Special Board Meeting - May 25, 2013
  • Regular Board Meeting - June 4, 2013
  • Regular Board Meeting - June 18, 2013
  • Special Board Meeting - June 25, 2013 (District Office)
29. ADJOURNMENT*
29.1. Time
Minutes:

The meeting was adjourned at 9:30 p.m. in memory of the victims of the tornado that hit Oklahoma.

Actions:
Motion
- Motion made by Ron Carey and a seconded by Lance James.
Vote:
Yes Lance James.
Yes Ron Carey.
Yes Diana Prola.
Yes Mike Katz-Lacabe.
Yes Corina N. Lopez.
Yes Vince J. Rosato.
Yes Jason Toro.
( Original )
PresentLinda Pollard
PresentCindy Cathey
PresentDebbie Wong
PresentJohn Thompson, Ed.D.
PresentLance James
PresentRon Carey
PresentDiana Prola
PresentMike Katz-Lacabe
PresentSong Chin-Bendib
PresentElisha Feliciano
PresentCorina N. Lopez
PresentVince J. Rosato
PresentJason Toro

The resubmit was successful.