San Leandro Unified School DistrictTradition and Innovation

Regular

Regular Meeting

Agenda 17 items

Agenda items for this meeting were extracted automatically from the PDF agenda, so numbering and boundaries may be approximate — the PDF is the official record.

  1. 5.1-A Schematic Design Phase of the New 9th Grade Campus REPORTS

    Recommended motion

    Backup will be emailed on Approve the schematic design phase, Tuesday, including site plan, floor plan and elevations Sept. 5, 2007 for the new 9th Grade Campus.

    Staff Recommendation: Backup will be emailed on Approve the schematic design phase, Tuesday, including site plan, floor plan and elevations Sept. 5, 2007 for the new 9th Grade Campus. Motion Second Vote Correspondence Superintendent’s Report Board Committee Reports • Facilities/Technology
  2. 1.1-C Approval of Amended Board Minutes – April 13, 2007 Passed

    Recommended motion

    Approve the amended minutes of the regular Board meeting held April 13, 2007.

    Staff Recommendation
    Approve the amended minutes of the regular Board meeting held April 13, 2007.

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  3. 2.1-C Acceptance of Personnel Report Passed

    Recommended motion

    Accept Personnel Report as submitted.

    Staff Recommendation
    Accept Personnel Report as submitted.

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  4. 2.2-C Renewal of Student Teaching Agreements Passed

    Recommended motion

    Approve the renewal of the Student Teaching Agreement between the District and Mills College.

    Staff Recommendation
    Approve the renewal of the Student Teaching Agreement between the District and Mills College.

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  5. 2.3-C Resolution #07-35, Teachers Teaching Out of Subject Area Passed

    Recommended motion

    Adopt Resolution #07-35 authorizing a Holder of a Multiple Subject or Standard Teaching Credential to Teach Out of Major/Minor Subject Area.

    Staff Recommendation
    Adopt Resolution #07-35 authorizing a Holder of a Multiple Subject or Standard Teaching Credential to Teach Out of Major/Minor Subject Area.

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  6. 2.4-C Resolution #07-36, Teachers Teaching Out of Subject Area Passed

    Recommended motion

    Adopt Resolution #07-36 authorizing a Holder of a Single Subject or Standard Teaching Credential to Teach Out of Major/Minor Subject Area.

    Staff Recommendation
    Adopt Resolution #07-36 authorizing a Holder of a Single Subject or Standard Teaching Credential to Teach Out of Major/Minor Subject Area.

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  7. 3.1-C Non-Public School Contracts Passed

    Recommended motion

    Approve the Non-Public School Contracts for Special Education Students.

    Staff Recommendation
    Approve the Non-Public School Contracts for Special Education Students.

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  8. 3.2-C Memorandum of Understanding (MOU) with Girl Scouts of the San Francisco Bay Area Passed

    Recommended motion

    Approve the Memorandum of Understanding (MOU) with Girl Scouts of the San Francisco Bay Area to operate an After School Education and Safety (ASES) program at John Muir and Bancroft Middle Schools.

    Staff Recommendation
    Approve the Memorandum of Understanding (MOU) with Girl Scouts of the San Francisco Bay Area to operate an After School Education and Safety (ASES) program at John Muir and Bancroft Middle Schools.

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  9. 3.3-C Discard Obsolete Supplemental Instructional Materials and Obsolete Library Books for John Muir Middle School Passed

    Recommended motion

    Approve the request to discard obsolete supplemental instructional materials and obsolete library books for John Muir Middle School per Board Policy 3270.

    Staff Recommendation
    Approve the request to discard obsolete supplemental instructional materials and obsolete library books for John Muir Middle School per Board Policy 3270.

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  10. 3.4-C Community-Based English Tutoring Program Application, Fiscal Year 2007-08 Business Operations Passed

    Recommended motion

    Approve the Community-Based English Tutoring Program Application for the Adult School, Fiscal Year 2007-08.

    Staff Recommendation
    Approve the Community-Based English Tutoring Program Application for the Adult School, Fiscal Year 2007-08.

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  11. 4.1-C Resolution #07-37 to Declare Certain Equipment Surplus and/or Obsolete. Passed

    Recommended motion

    Adopt Resolution #07- 37 to declare certain equipment surplus and/or obsolete due to the age and condition of the designated equipment.

    Staff Recommendation
    Adopt Resolution #07- 37 to declare certain equipment surplus and/or obsolete due to the age and condition of the designated equipment.

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  12. 4.2-C Resolution #07-34 to Perform Emergency Dry Rot Repair Work at Garfield, Monroe, McKinley and Washington Elementary Schools Facilities and Construction Passed

    Recommended motion

    Approve by unanimous vote, Resolution #07-34 to perform emergency dry rot work at Garfield, McKinley, Roosevelt, and Washington Elementary Schools. (Bid packages #07-02; #07-04 – backup)

    Staff Recommendation
    Approve by unanimous vote, Resolution #07-34 to perform emergency dry rot work at Garfield, McKinley, Roosevelt, and Washington Elementary Schools. (Bid packages #07-02; #07-04 – backup)

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  13. 5.1-C Architectural Design Services Contract with AEDIS Architects for the SLHS Library Expansion Passed

    Recommended motion

    A copy of the Approve the Architectural Design Services contract Contract with AEDIS Architects for the SLHS is included Library Expansion. in Board packet

    Staff Recommendation
    A copy of the Approve the Architectural Design Services contract Contract with AEDIS Architects for the SLHS is included Library Expansion. in Board packet

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  14. 5.2-C Architectural Design Services Contract with AEDIS Architects for the Renovation & Upgrades at San Leandro High School and McKinley, Roosevelt and Washington Elementary Schools Projects Passed

    Recommended motion

    A copy of the Approve the Architectural Design Services contract Contract with AEDIS Architects for the San is included Leandro High School and McKinley, Roosevelt in Board and Washington Elementary Schools Projects. packet

    Staff Recommendation
    A copy of the Approve the Architectural Design Services contract Contract with AEDIS Architects for the San is included Leandro High School and McKinley, Roosevelt in Board and Washington Elementary Schools Projects. packet

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  15. 5.3-C Geotechnical Engineering & Soils Investigation Services Contract with Ninyo & Moore for the 9th Grade Campus, Arts Education Center, PG&E Parking Lot and Library Expansion Projects Passed

    Recommended motion

    A copy of the Approve the Geotechnical Engineering & Soils contract Investigation Services Contract with Ninyo & is included Moore for the 9th Grade Campus, Arts in Board Education Center, PG&E Parking Lot and packet Library Expansion Projects.

    Staff Recommendation
    A copy of the Approve the Geotechnical Engineering & Soils contract Investigation Services Contract with Ninyo & is included Moore for the 9th Grade Campus, Arts in Board Education Center, PG&E Parking Lot and packet Library Expansion Projects.

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  16. 5.4-C Construction Contract with Coulter Construction for the Portable #41 Exiting Revisions project for the Adventure Time Program at Madison Elementary School Passed

    Recommended motion

    A copy of the Award the bid proposal to Coulter Construction contract for the Portable #41 Exiting Revisions project is included for the Adventure Time Program at Madison in Board Elementary School. packet

    Staff Recommendation
    A copy of the Award the bid proposal to Coulter Construction contract for the Portable #41 Exiting Revisions project is included for the Adventure Time Program at Madison in Board Elementary School. packet

    Outcome

    Approved as part of consent items (7-0 vote per minutes)

  17. 2.1-A Resolution #07-38, Reduce Classified Services Due to Lack of Funds/Work

    Recommended motion

    Adopt Resolution #07-38, to eliminate/reduce classified services due to a lack of funds/work.

    Staff Recommendation
    Adopt Resolution #07-38, to eliminate/reduce classified services due to a lack of funds/work.

Contracts and agreements on this agenda 8

Extracted automatically from the agenda items and attachments; amounts appear only when printed in the documents.

ItemVendor / partyDescriptionAmount
2.2-C Mills CollegeApprove the renewal of the Student Teaching Agreement between the District and Mills College.—
3.1-C —Approve the Non-Public School Contracts for—
3.2-C —Approve the Memorandum of Understanding (MOU) with Girl Scouts of the San Francisco Bay Area to operate an After School Education and Safety (ASES) program at John Muir and Bancroft Middle Schools.—
4.2-C —Approve by unanimous vote, Resolution #07-34 to perform emergency dry rot work at Garfield, McKinley, Roosevelt, and Washington Elementary Schools. (Bid packages #07-02; #07-04 – backup)—
5.1-C AEDIS ArchitectsA copy of the Approve the Architectural Design Services contract Contract with AEDIS Architects for the SLHS is included Library Expansion. in Board packet—
5.2-C AEDIS ArchitectsA copy of the Approve the Architectural Design Services contract Contract with AEDIS Architects for the San is included Leandro High School and McKinley, Roosevelt in Board and Washington Elementary Schools Projects. packet—
5.3-C Geotechnical Engineering & Soils InvestigationA copy of the Approve the Geotechnical Engineering & Soils contract Investigation Services Contract with Ninyo & is included Moore for the 9th Grade Campus, Arts in Board Education Center, PG&E Parking Lot and packet...—
5.4-C Coulter ConstructionA copy of the Award the bid proposal to Coulter Construction contract for the Portable #41 Exiting Revisions project is included for the Adventure Time Program at Madison in Board Elementary School. packet—

Document

Open in new tab