San Leandro Unified School DistrictTradition and Innovation

Special

Special Board Meeting

· 12:48 PM

San Leandro City Council Chambers 835 E. 14th Street San Leandro, CA

Agenda 71 items

  1. 0 CALL TO ORDER/ROLL CALL - 6:00 P.M.
    Minutes
    The meeting was called to order by Trustee Katz-Lacabe at 6:00 p.m. It was noted that all Board members were present with the exception of Trustee L?pez.
  2. 1 PUBLIC TESTIMONY - CLOSED SESSION ITEMS
    Minutes
    There were no public comments regarding Closed Session items.
  3. 2 RECESS INTO CLOSED SESSION - 6:00 P.M.
    Minutes
    The Board recessed into closed session at 6:01 p.m.
  4. 2.1 Student Expulsions; Education Code 35146 and 48918(c)
  5. 2.2 Public Employee Discipline/Dismissal/Release/Hiring; Government Code Section 54957
  6. 2.3 Conference with Labor Negotiator; Government Code Section 54957.6
  7. 2.4 Conference with Real Property Negotiator - Property: Government Code Section 54956.8
    Quick Summary / Staff Recommendation
    Property: 13666 E. 14th Street, San Leandro, California Agency Negotiator: Cindy Cathey, Superintendent; Song Chin-Bendib, Assistant Superintendent Business and Operations; C. John Dominguez, School Site Solutions, Inc.; Philip Henderson, Orbach, Huff & Suarez, LLP Negotiating Parties: Potential party for negotiated purchase is Girls, Inc. Under Negotiation: Price and terms of payment for potential purchase.
  8. 2.5 Liability Claim
    Quick Summary / Staff Recommendation
    Pursuant to Government Code Section 54954 et seq. and 54956.95. Personal injury claim filed by Joshua Adriano against San Leandro Unified School District
  9. 3 RECONVENE TO OPEN SESSION - 7:00 p.m.
    Minutes
    The Board reconvened to open session at 7:00 p.m.
  10. 3.1 Report on Closed Session Action
  11. 3.2 Pledge of Allegiance
    Minutes
    Trustee Katz-Lacabe led the Pledge of Allegiance to the Flag.
  12. 3.3 Approval of Agenda Action recorded
    Minutes
    It was the consent of the Board to move the Reorganization of the Board to the end of the agenda. With that amendment, the agenda was approved.
    Actions
    Motion - Motion made by Jason Toro and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the Regular Board meeting agenda for December 11, 2012.

    Outcome

    Motion - Motion made by Jason Toro and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato

  13. 3.4 LEGAL STATEMENT
    Quick Summary / Staff Recommendation
    Members of the audience who wish to address the Board are asked to complete the yellow card available at the entrance and submit it to the Board's Administrative Assistant. Speakers who have completed the card will be called when the item is reached on the agenda or, for non-agenda items, during the Public Testimony. Cards are to be turned in before the item is reached on the agenda. Please note that the meeting is being recorded. State law prohibits the Board of Education from taking any action on or discussing items that are not on the posted agenda except to A) briefly respond to statements made or questions posed by the public in attendance; B) ask questions for clarification; C) provide a reference to a staff member or other resource for factual information in response to the inquiry; or D) ask a staff member to report back on the matter at the next meeting and/or put it on a future agenda. (Government Code 54954.2(a)).
  14. 4 PUBLIC TESTIMONY ON NON-AGENDA ITEMS - 7:10-7:20 p.m.
    Minutes
    Jon Sherr, President of the San Leandro Teachers' Association (SLTA), on behalf of SLTA, welcomed the new and returning Trustees, stating that SLTA is looking forward to a great collaboration with Board and the District. Thank you and good luck!
  15. 5 RECREATION & PARKS COMMISSION REPORT - 7:35-7:40 p.m.
    Minutes
    Evelyn Gonzalez the District's Recreation and Parks Commission representative introduced herself and congratulated the new (and re-elected) Board Trustees before giving a brief overview and introduction to the new Board members on the Recreation & Parks Commission. The Commission is under Department of Recreation and Human Services, which is comprised of two divisions: (1) Human Services, which has three commissions (Human Services Commission, Senior Commission,Youth Advisory Commission) and (2) Recreation, which has one commission, Recreation and Parks. Ms. Gonzalez also reported that the City of San Leandro has 23 parks and facilities, noting that Marina Park is undergoing some renovations including the irrigation.
  16. 6 PRESENTATIONS - 7:40-8:25 p.m.
  17. 6.1 2012-2013 First Interim Report
    Minutes
    Assistant Superintendent Song Chin-Bendib and Fiscal Director Marites Fermin, presented the First Interim Report for the 2012-2013 Fiscal Year, which includes fiscal years 2013-14 and 2014-15. The presentation included fiscal information that was presented to the Finance Committee on December 3, 2012, and the fiscal impact of Proposition 30 and Measure L. The Assistant Superintendent explained that in compliance with Education Code EC 42131(a) (1) requirements, Assembly Bill (AB) AB1200, and AB 2756, the Business Services Department has prepared the 2012-2013 First Interim Report. The First Interim Report is the financial update of the 2012-2013 Adopted Budget approved by the Board on June 26, 2012. The report is required to be approved by the governing board no later than 45 days after the close of the reporting period (October 31) to determine whether or not the District is able to meet its financial obligations. For the fiscal year 2012-2013 First Interim Report, San Leandro Unified is certifying a positive certification, and the Business Services staff has prepared the First Interim Report along with assumptions from the Alameda County Office of Education (ACOE) and the School Services of California (SSC), Inc. Dartboard which provides school districts critical economic indicators of budget projections. Highlights of the presentation included: The First Interim Report projected ending Fund Balances after designations for 2012-2013 and two subsequent years. The unrestricted ending fund balances include Tier III Flexibility funds that have been swept/approved by the Board. Any unswept or unapproved funds have been accounted for in a separate account and are not included in these balances. Fund Balance 2012-2013 2013-2014 2014-2015 After Designations* $1,233,345 $3,604,263 $3,500,980 * These balances do not include the 3% required reserve but is maintained separately in Fund 17 (a separate Fund). Major assumptions that have been applied toward the 2012-2013 First Interim Report : Revenue Limit statutory Cost Of Living Adjustment (COLA) = 3.24% Revenue Limit deficit factor = 22.272% Measure L Parcel tax: estimated amount of $2.4 million beginning 2013/14 fiscal year; the Measure is for five years State categorical and Special Ed COLA = 0% Mandated Cost Block grant received only for 2012/13. No revenue has been budgeted in subsequent fiscal years Decline of ADA in 2012-13: 101.65 ADA for both 2013-14 and 2014-15 = $816,112 (Net of 2.8 less FTEs due to fewer students) Reduction of COLA from 2.5% to 2.0% in 2013/14 and from 2.7% to 2.3% in 2014/15 = $394,985 Additional Special Education encroachment from increased NPS at $700,000; estimated for 2012/13 only $855/FTE to be paid starting February 2013 towards health and welfare benefits. This is per MOU with some bargaining units if Base Revenue Limit (BRL) remains at or above the 2011-2012 figure. Assistant Superintendent Chin-Bendib also reported that the State of California is finally showing some signs of economic recovery. On November 30, 2012, the Department of Finance announced that due to improved state cash flow, the state would be able to pay back the $1.9 billion deferral payment due in January 2013, one month early, in December 2012. In addition, the state will be able to eliminate the $900 million March 2013 deferral entirely. Although this early payment does not impact our Fund Balance, it will help cash flow tremendously, i.e. the District may not have to borrow to pay its bills in the future. This is not new money for 2012-2013. The Board thanked staff for the thorough presentation. Questions raised by the Board were clarified by staff.
    Quick Summary / Staff Recommendation
    Assistant Superintendent Song Chin-Bendib and Fiscal Director Marites Fermin, will present the First Interim Report for the 2012-2013 Fiscal Year, which includes fiscal years 2013-14 and 2014-15. Included in the presentation will be fiscal information that was presented to the Finance Committee on December 3, 2012, including the fiscal impact of Proposition 30 and Measure L along with any other relevant information since the meeting.
  18. 7 ACTION ITEM
  19. 7.1 Approval of Action Items
    Quick Summary / Staff Recommendation
    These items are presented for action at this time. Some may have been reviewed at a previous meeting.
  20. 8 Business and Operations
  21. 8.1 A Positive Certification of the First Interim Report for 2012-2013 Which Includes Fiscal Years 2013-14 and 2014-15 As Required by Assembly Bills 1200 and 2756 Action recorded
    Fiscal Impact
    The 2012-2013 First Interim Report has incorporated financial revisions from the June 26, 2012, Adopted Budget.
    To
    Cindy M. Cathey, Superintendent
    Minutes
    PUBLIC COMMENT Carol Delton, representing the San Leandro Teachers Association (SLTA) on budget and finance, provided clarifying information to the Board regarding what the assumptions mean to the District. Following Ms. Delton's comments, the Board approved the positive certification of the First Interim Report for 2012-2013 which includes Fiscal Years 2013-2014 and 2014-2015 as required by Assembly Bills 1200 and 2756.
    Actions
    Motion - Motion made by Ron Carey and a seconded by Lance James. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the positive certification of the First Interim Report for 2012-2013 which includes Fiscal Years 2013-2014 and 2014-2015 as required by Assembly Bills 1200 and 2756.
    Board Committee
    Board Finance Committee Meeting - December 3, 2012
    Background Information
    In compliance with Education Code EC 42131(a)(1) requirements, Assembly Bill (AB) AB1200, and AB 2756, the Business Services Department has prepared the 2012-2013 First Interim report which includes fiscal years 2013-14 and 2014-15. The First Interim Report is the financial update of the 2012-2013 Adopted Budget approved by the Board on June 26, 2012. The report is required to be approved by the governing board no later than 45 days after the close of the reporting period (October 31 st ) to determine whether or not the district is able to meet its financial obligations. The following certifications may be assigned: Positive: assigned to any district that based on current projections will meet its financial obligations in the current fiscal year and two subsequent fiscal years. Qualified: assigned to any district that based on current projections may not be able meet its financial obligations in the current fiscal year and two subsequent fiscal years. Negative: assigned to any district that based on current projections will not be able to meet its financial obligations for the remainder of the current fiscal year or the subsequent fiscal year. For the fiscal year 2012-2013 First Interim Report, San Leandro USD is certifying a positive certification. Business Services staff has prepared the First Interim Report, along with assumptions from the Alameda County Office of Education (ACOE) and the School Services of California (SSC), Inc. Dartboard which provides school districts critical economic indictors for budget projections. Multi-Year projections along with other analytical reports are provided under separate cover. Below are the First Interim Report projected ending Fund Balances after designations for 2012-2013 and two subsequent years. The unrestricted ending fund balances include Tier III Flexibility funds that have been swept/approved by the Board. Any unswept or unapproved funds have been accounted for in a separate account and are not included in these balances. Below are the First Interim Report projected ending Fund Balances after designations for 2012-2013 and two subsequent years: Fund Balance 2012-2013 2013-2014 2014-2015 After Designations* $1,233,345 $3,604,263 $3,500,980 * These balances do not include the 3% required reserve but is maintained separately in Fund 17 (a separate Fund). The following major assumptions have been applied toward the 2012-2013 First Interim Report: Revenue Limit statutory Cost Of Living Adjustment (COLA) = 3.24% Revenue Limit deficit factor = 22.272% Measure L Parcel tax: estimated amount of $2.4 million beginning 2013/14 fiscal year; the Measure is for five years State categorical and Special Ed COLA = 0% Mandated Cost Block grant received only for 2012/13. No revenue has been budgeted in subsequent fiscal years Decline of ADA in 2012-13: 101.65 ADA for both 2013-14 and 2014-15 = $816,112 (Net of 2.8 less FTEs due to fewer students) Reduction of COLA from 2.5% to 2.0% in 2013/14 and from 2.7% to 2.3% in 2014/15 = $394,985 Additional Special Education encroachment from increased NPS at $700,000; estimated for 2012/13 only $855/FTE to be paid starting February 2013 towards health and welfare benefits. This is per MOU with some bargaining units if Base Revenue Limit (BRL) remains at or above the 2011-2012 figure. The State of California is finally showing some signs of economic recovery. On November 30, 2012, the Department of Finance announced that due to improved state cash flow, the state would be able to pay back the $1.9 billion deferral payment due in January 2013, one month early, in December 2012. In addition, the state will be able to eliminate the $900 million March 2013 deferral entirely. Although this early payment does not impact our Fund Balance, it will help our cash flow tremendously, i.e. the District may not have to borrow to pay its bills in the future. This is not new money for 2012-2013.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Outcome

    Motion - Motion made by Ron Carey and a seconded by Lance James. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Ye

  22. 9 REPORTS - 8:25 - 8:35 p.m.
  23. 9.1 Correspondence
    Minutes
    As the new officers had yet to been elected, there was not a Correspondence Report.
  24. 9.2 Superintendent Report
    Minutes
    Superintendent Cindy Cathey acknowledged the hard work of the Keep the Music Rockin Foundation, stating that the December 6, Holidays with Lenny Williams Benefit Concert was fabulous, adding that "people were dancing in the aisles." The Superintendent will be attending a Community Schools meeting in Oakland on Tuesday, December 18. She also reminded the Board that the District Office, along with the school sites, will be closed for Winter Break from December 24-January 4.
  25. 9.3 Union Representative Reports
    Minutes
    Carol Delton, San Leandro Teachers' Association, spoke about RIF notices, noting that all the RIF notices that were issued last year have been recalled. She asked the Board to make a commitment and not issue RIFs, thus avoiding unnecessary worry and stress for their members.
  26. 10 BOARD COMMITTEE REPORTS - 8:35-8:45 p.m.
  27. 10.1 Facilites & Technology
    Minutes
    Trustee Prola reported that the Facilities & Technology Committee met on December 5 and heard a status report on the portables at Washington Elementary School, and discussed the exterior colors for the San Leandro High School swim center building, student drop off area at Wilson Elementary School and transportation of sports teams during the construction of the San Leandro High School fields and Burrell projects.
  28. 11 BOARD REPRESENTATIVE REPORTS- 8:45-8:50 p.m.
  29. 11.1 Eden Area Regional Occupational Program (ROP)
    Minutes
    Trustee Katz-Lacabe reported that the Governing Board of the Eden Area ROP met on December 6 where they approved the Contract for Youth Enrichment Services Collaborative Grant for the 2012-2013 school year and the First Interim Budget Report for 2012-2013. He also said that Arroya High School student Luz Yanez was selected as Student of the Month for November.
  30. 12 CONSENT ITEMS - 8:50-9:10 p.m.
  31. 12.1 Approval of Consent Items Action recorded
    Minutes
    The Board approved the Consent Items.
    Actions
    Motion - Motion made by Diana Prola and a seconded by Ron Carey. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    These items are considered routine and may be enacted by a single motion. At the request of any member of the Board, any item on the consent agenda shall be removed and given individual consideration for action as a regular agenda item.

    Outcome

    Motion - Motion made by Diana Prola and a seconded by Ron Carey. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Ye

  32. 13 Human Resources
  33. 13.1 Certificated Personnel Report 📎 1

    Attachments

  34. 13.2 Classified Personnel Report 📎 1

    Attachments

  35. 14 Educational Services
  36. 14.1 Addendum to the Memorandum of Understanding Between the San Leandro Unified School District and Achieve Learning and Resource Center, Inc. for SAT Prep at San Leandro High School for the 2012-2013 School Year 📎 1
    Fiscal Impact
    An additional $2,500 for 25 students to be funded by the GEAR UP Grant
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve the Addendum to the Memorandum of Understanding Between the San Leandro Unified School District and Achieve Learning and Resource Center, Inc. for SAT Prep at San Leandro High School for the 2012-2013 School Year
    Background Information
    On November 13, 2013, the Board approved a Memorandum of Understanding (MOU) between the District and Achieve Learning and Resource Center for a SAT Prep academy to increase the number of students who successfully take and score high on the SAT test. This MOU was to serve up to 100 student participants in the 7-week academy. This program is free to 11th grade students and is timed to run from january 2013-March 2013 culminating with students taking the SAT Exam on March 9, 2013. Due to overwhelming student response, the 100 available seats in the academy have been filled and there is a waiting list of 25 students. The GEAR UP Grant would like to increase this MOU to accommodate these 25 students. The cost equivalent of $100 per student will increase the MOU to $2,500, making it a cumulative total cost of $12,500. The addendum to the current MOU is attached; all contents of the MOU cover this addendum as well.
    From
    Debbie Wong, Assistant Superintendent, Educational Services

    Attachments

  37. 14.2 Amendment to the Contracted Services Agreement Between San Leandro Unified School District and Napa, Solano, Contra Costa Educational Support Team for Mathematics Institute at San Leandro High School for December 18, 2012 📎 1
    Fiscal Impact
    Additional $4,800 amendment to the June 2012 contract; funding will be from Program Improvement Year 3 Corrective Action The hourly contracted rate would be $150 per facilitator, which includes planning/preparation time and facilitation.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve the Amendment to the Contracted Services Agreement Between San Leandro Unified School District and Napa, Solano, Contra Costa Educational Support Team for Mathematics Institute at San Leandro High School for December 18, 2012
    Policy / Code
    Education Code 52055.57
    Background Information
    As required for a district in Program Improvement Year 3 Corrective Action, in June 2012, the District contracted services with Napa, Solano, Contra Costa (NSCC) Educational Support Team Services as our District Assistance Intervention Team (DAIT) for technical assistance to revise the Local Education Agency (LEA) Plan submitted March 10, 2012. With this agreement, NSCC must monitor progress along our LEA Plan. The scope of work included technical assistance for the state monitoring reports, five monitoring sessions at every school site throughout the school year, and review and rate LEA action steps. For the past two months, the DAIT team has been conducting classroom visitations in our schools with the outcome to strengthen classroom instruction and show progress along the LEA Plan. The DAIT team has recommended a mathematics institute for San Leandro High School Math Department to engage the teachers and site administrators in strengthening mathematics instructional practice, understanding the most recent research on mathematics, and engaging in the upcoming mathematics common core state standards. The 1-day Mathematics Institute would take place on campus on Tuesday, December 18, 2012. Two members from the DAIT team will plan with the site and district and facilitate the institute. This additional support would be an amendment to the June 2012 contract in the amount of $4,800, which will include the planning and preparation time, materials and facilitation.
    From
    Debbie Wong, Assistant Superintendent, Educational Services

    Attachments

  38. 14.3 2012-2013 NPS/A Contracts 📎 2
    Fiscal Impact
    $30,957.47 - Special Education funds.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve non-public school/agency contracts as listed above for the 2012-2013 school year.
    Board Committee
    Not Applicable
    Policy / Code
    Education Code: 56365(a) Education Code: 56361(3) Education Code: 56366
    Background Information
    New non-public school placement contracts for the school year 2012-2013. Student # DOB Cost Location # 1 12/04/2009 $880.00 Progressus Therapy, LLC # 2 05/01/2001 $704.00 Progressus Therapy, LLC # 3 02/13/2009 $704.00 Progressus Therapy, LLC # 4 04/03/2012 $1,936.00 Progressus Therapy, LLC # 5 11/23/1997 $26,733.47 Spectrum Center, Inc. Total $30,957.47
    From
    Debbie Wong, Assistant Superintendent, Educational Services

    Attachments

  39. 15 Business and Operations
  40. 15.1 Ratification of Payroll
    Quick Summary / Staff Recommendation
    Ratify October payroll in the amount of $5,454,956.70
  41. 15.2 Approval of Bill Warrants 📎 1
    Quick Summary / Staff Recommendation
    Approve Bill Warrants #88-50183269 - 88-50204254 in the amount of $4,434,423.64

    Attachments

  42. 15.3 Intra-Budget Transfers and Revisions 📎 2
    Quick Summary / Staff Recommendation
    Approve the request for Intra-Budget Transfers and Revisions for October 2012.

    Attachments

  43. 15.4 Resolution #12-72 to Declare Certain Equipment Surplus and/or Obsolete 📎 1
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Adopt Resolution #12-72 to declare equipment surplus and/or obsolete due to the age and condition of the designated equipment.
    Policy / Code
    Board Policy 3270(a); Administrative Regulations #3270 (a) #6.
    Background Information
    When district-owned books, equipment and supplies become unusable, obsolete, or no longer needed, the Superintendent or designee shall identify these items to the Governing Board, together with their estimated value and a recommendation that they be sold or disposed of by one of the methods prescribed in law and administrative regulations. With Board approval, the Superintendent or designee shall arrange for the sale or disposal of these items. Please see attached.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  44. 16 Facilities and Construction
  45. 16.1 Amendment #4 to the Design Services Contract with SIM Architects to add Measure B Savings Modernization at Madison Elementary School 📎 1
    Fiscal Impact
    Architectural services are funded by local Measure B Bond and State grant funds.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve Amendment #4 in the amount of $90,000 to the Design Services Contract with SIM Architects to add Measure B Savings Modernization at James Madison Elementary School for seismic upgrade and window replacement scopes.
    Board Committee
    Facilities and Construction Committee: December 5, 2012
    Background Information
    The Board of Education previously approved SIM Architects, through a Request for Qualifications (RFQ) process, to be placed in an Architectural Pool for use on selected projects as identified through the local Measure B Bond. Their original contract was approved by the Board on February 19, 2008, to provide renovation and upgrade design services for Wilson Elementary School. Amendment #1 to The SIM Architects agreement to provide Alameda County Health Department required upgrades to the Wilson Kitchen was approved by the Board on June 21, 2011. Amendment #2 was Board approved on October 19, 2011, for the Madison ES Modernization, HVAC, Roofing, Restroom, Generator, Ramp, etc. project from Measure B Savings. Amendment #3 was Board approved on August 8, 2012, for the Muir MS and Wilson ES Modernization project from Measure B Savings. This amendment #4 provides for the architectural services for the seismic upgrades and window replacements at Madison Elementary School. Amendment #4 will provide for design of the improvements with construction document review and approval by DSA as well as construction administration through construction and project closeout. Construction cost estimates will be provided during the design. Contract and Fee Summary Item Description of Service Fee Amount Item total Running total Initial Contract Wilson ES Heating Upgrades $203,260 $424,600 $424,600 Roofing Replacement $48,510 Classroom Paint & Lights $81,810 Restroom Renovations $91,020 Amend. #1 Kitchen Modifications Wilson ES $12,920 $12,920 $437,520 Amend. #2 Measure B Savings Mod. Madison ES $206,400 $206,400 $643,920 Amend. #3 Measure B Savings Mod. Muir MS $123,500 $156,366 $800,286 Measure B Savings Mod. Wilson ES $32,866 Amend. #4 Measure B Savings Mod. Madison ES Seismic & Windows $90,000 $90,000 $890,286
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  46. 16.2 Amendment #5 to the Design Services Contract with AEDIS Architects to add Measure B Savings Modernization at San Leandro High School and Portable Replacements at Washington Elementary School 📎 1
    Fiscal Impact
    Architectural services are funded by local Measure B Bond and State Grant funds. The additional cost would come from the Measure B financial reserve and any potential future savings.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve Amendment #5 for $29,000 to the Design Services Contract with AEDIS Architects to change the design services from Portable Replacements to Modular Classrooms at Washington Elementary School.
    Board Committee
    Facilities and Construction Committee: December 5, 2012
    Background Information
    The Board of Education previously approved AEDIS Architects, through a Request for Qualifications (RFQ) process, to be placed in an Architectural Pool for use on selected projects as identified through the local Measure B Bond. The original Contract was entered into on September 6, 2007, between AEDIS Architects and San Leandro Unified School District to provide architectural design services for painting and lighting modernization at San Leandro High School (SLHS), McKinley, Roosevelt, and Washington Elementary Schools. Subsequently The Board approved: Amendment #1, in the amount of $470,654, on November 6, 2007, which added modernization at Bancroft Middle School to the scope of the contract. Amendment #2, in the amount of $121,532, on December 14, 2010, which added classroom painting and lighting upgrades at Garfield and Monroe Elementary Schools. Amendment #3, in the amount of $18,810, on January 24, 2012, which added classroom painting and lighting upgrades at Washington Elementary School to Include Buildings C & E. Amendment #4, in the amount of $389,562, on August 7, 2012, which provides architectural design services for window, skylight, seismic and exterior door repair and or replacement at San Leandro High School as well as the replacement of portable classrooms in building C and E at Washington Elementary School. After exploring a potential opportunity to replace portable classrooms with another district?s stockpiled modular buildings, staff recommends investing in modular classrooms as a better investment for the District. Currently, we have $2.3 million in the budget for the portable classrooms replacement. For an additional $750,000 taken from the Measure B financial reserve, the District could purchase and install modular classroom buildings at Washington Elementary School instead of portables, as originally designed. Moving from portables to modular buildings would have many benefits, including more than doubling the life of the buildings: Portable Classroom Modular Building Flat Roof Standing Seam Roof (with higher pitch) Plywood Floor (hollow sound, etc.) Concrete floor (more substantial) Tongue and Groove Siding Stucco (more durable) 20-25 year life span 50 life span Contract and Fee Summary Item Description of Services Item Amount Running Total Original Contract Modernization at SLHS, McKinley, Roosevelt, Washington $1,045,588 $1,045,588 Amend. #1 Modernization at Bancroft MS $470,654 $1,516,242 Amend. #2 Modernization at Garfield & Monroe $121,532 $1,637,774 Amend. #3 Classroom Paint and Lights Washington Buildings C & E $18,810 $1,656,584 Amend. #4 Measure B Savings Mod. San Leandro HS $243,896 $389,562 $2,046,146 Replace Portables at Washington ES $145,666 Amend. #5 Washington ES Change from Portables to Modular Classrooms $29,000 $418,562 $2,464,708
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  47. 16.3 Budget Increase for the Washington Elementary School Modular Classrooms Project and Authorization to Negotiate a Piggy Back Agreement with American Modular Systems (AMS)
    Fiscal Impact
    The Washington Elementary School Classrooms Project is funded by Measure B Savings. The additional cost of $750,000 would come from the financial reserves and any potential future savings.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve the Budget Increase of $750,000, from $2,300,000 (original estimate if modulars were purchased through units stockpiled from another district) to $3,050,000, for the Washington Elementary School Classrooms Replacement Project Approve the authorization to enter into a Piggy Back Agreement with American Modular Systems (AMS) for up to $1.5 million (included in the $3,050,000 budget).
    Board Committee
    Facilities and Technology Committee: December 5, 2012.
    Background Information
    On July 10, 2012, the Board of Education reviewed and then on August 21, 2012, approved the Measure B Savings Projects, which included the Washington Elementary School Portable Classroom Replacement project in the budgeted amount of $2,300,000. On August 7, 2012, the Board approved AEDIS Amendment #4 that included architectural design services for the replacement of portable classrooms in buildings C and E at Washington Elementary School. In an effort to maximize resources, staff has explored a potential opportunity to replace the existing portable classrooms with another school district?s stockpiled modular buildings. Although this opportunity did not work out, it did in effect create an expanded programming phase to this project. This extensive and time consuming programming exercise, allowed the team to fine tune the District and the school site?s facility requirements, along with the associated costs that would be incurred to upgrade the new classrooms from portable construction to modular construction. The extensive programming phase was beneficial as it allowed the team to review the schematic assessment with the architect, which resulted in the reduction of the projected cost of $1m down to $750k. This additional investment would increase the expected usable life of the replacement classrooms from 25-30 years to 50 years because of the upgrade from portable to modular construction. However, at this point all extra time in the project delivery schedule has been exhausted. To avoid any potential delays to opening these classrooms for students and teachers in August 2013, the District will need to take action in December 2012, to enter into and order the fabrication of new classrooms. Based upon this information, staff and the team recommend investing additional funds in the amount of $750,000 to construct the replacement classrooms using a modular type construction. Currently, $2.3 million is allocated in the budget for the portable classroom replacements, however staff is recommending an increase to the current budget in order to invest an additional $750,000 for modular classrooms. The additional cost of $750,000 is recommended to be taken from the Measure B Financial Reserve. For the modular classroom buildings, AEDIS Architects and staff are recommending the utilization of a State approved and established procurement and delivery method, commonly referred to as ?piggyback contract?. For the purchase and installation of modular classroom buildings, this delivery method allows relatively rapid procurement, fabrication, delivery and installation of replacement classrooms at Washington Elementary School over the 2013 summer break, at a competitive price. Piggyback contracting method can be used to procure equipment and modular classroom buildings. An original awarding agency issues bid documents, advertises, and receives competitive bids. In those bid documents there is clause that allows follow-on awarding agencies across the state to, in effect, write a change order to that original contract and receive the same competitive pricing. In addition to knowing the pricing ahead of time, the other main advantage is that the original awarding agency has already satisfied all the bid advertising, notifications and other requirements of Public Contract Code. This saves time and allows factory fabrication to start earlier. In this case, there is a current competitively bid contract between American Modular Systems Inc. and the Biggs Unified School District (BUSD) High Performance Facilities Contract approved by BUSD on 12/13/11, and this is now available for the San Leandro Unified School District to use for the purchase and installation of the modular buildings. On December 13, 2011, the Board of Trustees of the BUSD approved awarding the High Performance Facilities Contract for new modular classroom buildings and site work. Below is a table outlining the budget increase calculation: Breakdown of Budget Increase Request Calculation AMS upcharge from standard portables to modular with green enhancements $562,157 Additional Construction Management fee (none, if built and installed in 2013) $0 Additional Architectural Engineering fee $30,000 Additional Testing & Inspection $20,000 Additional DSA fees $5,622 Additional Project Contingency $132,122 Budget Increase Amount $750,000
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations
  48. 17 ACTION ITEMS - 9:10-9:15 p.m.
  49. 17.1 Approval of Action Items
    Quick Summary / Staff Recommendation
    These items are presented for action at this time. Some may have been reviewed at a previous meeting.
  50. 18 Educational Services
  51. 18.1 Approval of Recommendation for Readmission from Expulsion for Student E12-11/12 Action recorded
    To
    Cindy M. Cathey, Superintendent
    Minutes
    The Board approved the recommendation for Readmission from Expulsion for Student E12-11/12.
    Actions
    Motion - Motion made by Ron Carey and a seconded by Corina N. Lopez. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the recommendation from the Director of Student Support Services for readmission from expulsion for student E12-11/12, who has satisfactorily completed the rehabiliation plan and is eligible for return to a comprehensive program.
    From
    Debbie Wong, Assistant Superintendent, Educational Services

    Outcome

    Motion - Motion made by Ron Carey and a seconded by Corina N. Lopez. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .

  52. 19 CONFERENCE ITEMS - 9:15-9:40 p.m.
  53. 19.1 Approval of Conference Items
    Quick Summary / Staff Recommendation
    These items are submitted for advance planning and to assist the Board in establishing future agenda items. The Board may, however, take action on the following:
  54. 20 General Services
  55. 20.1 2013 California School Boards Association (CSBA) Delegate Assembly Nominations Action recorded 📎 1
    Fiscal Impact
    In accordance with CSBA Bylaws, CSBA does not pay travel expenses associated with Delegate Assembly meetings.
    To
    Board of Education
    Minutes
    Trustee Prola indicated that she would like to continue as the California School Board's representative. As there were no other interested Trustees, the Board took action and approved the nomination of Diana Prola for the term beginning April 2, 2013, through March 31, 2015, by the following vote.
    Actions
    Motion - Motion made by Ron Carey and a seconded by Lance James. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    The Board will discuss and consider nominating interested candidates to the California School Boards Association (CSBA) Delegate Assembly for the term beginning April 1, 2012, through March 31, 2015.
    Board Committee
    Non Applicable
    Policy / Code
    None
    Background Information
    CSBA's Delegate Assembly is a vital link in the association's governance structure. Working with local districts, county offices, the Board of Directors and the Executive Committee, Delegates ensure that the association reflects the interest of school districts and county offices of education throughout the state. Nomination and Candidate Biographical Sketch forms for CSBA's Delegate Assembly are now being accepted until Monday, January 7, 2013. Key points: Any CSBA member board is eligible to nominate board members within their geographical region or subregion Boards may nominate as many individuals as they choose by using the nomination form Approval from the board member to be nominated CSBA's Delegate Assembly is required All nominees must submit a required one-page, single-sided, candidate biographical sketch form and an optional one-page, one-side r?sum?, (the r?sum? cannot be substituted for the candidate biographical sketch form) All nomination materials must be postmarked or faxed no later than Monday, January 7 Delegates serve two-year terms. Those elected in 2012 will serve beginning April 1, 2013 through March 31, 2015 There are two required Delegate Assembly meetings each years, one in May in Sacramento and one preceding the CSBA Annual Education Conference and Trade show in November/Decembe r
    From
    Cindy M. Cathey, Superintendent

    Outcome

    Motion - Motion made by Ron Carey and a seconded by Lance James. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Ye

    Attachments

  56. 20.2 Parcel Tax Levy and Exemption Administration Services with SCI Consulting Group Action recorded 📎 1
    Fiscal Impact
    Year One: $9,638 - $10,023 depedning upon the number of exemptions Year Two and Three: $7,400 per year Plus an amount not to exceed $750 per fiscal year for incidental expenses Funded from Measure L funds
    To
    Board of Education
    Minutes
    Superintendent Cathey said that with the November 6, 2012, passage of the Measure L Parcel Tax, it is fiscally prudent and common for districts to seek the services for an expert to administer and process both exemptions and to levy the parcel tax. The scope of work incudes such tasks as full services, year-round administration; identifying and verifying all parcels that should be subject to the parcel tax, calculating each parcel tax, determining parcel tax levies, responding to public inquiries and appeals, meeting legal reporting and accountability requirements, liaison with county assessor and county tax collector, etc. The Superintendent said that staff is recommending that the Board approve the parcel tax and exemption administration services with SCI Consulting Group, adding that they have worked with many school districts including: Albany, Alameda, Dublin, West Contract Costa and Davis Joint Unified. Following the questions raised, the Board approved the contract between the San Leandro Unified School District and SCI Consulting Group for Measure L Parcel Tax Exemption Administration and Levy for the 2013-2014 through 2015-2016 school years.
    Actions
    Motion - Motion made by Diana Prola and a seconded by Ron Carey. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the contract between the San Leandro Unified School District and SCI Consulting Group for Measure L Parcel Tax Exemption Administration and Levy for the 2013-2014 through 2015 - 2016 school years
    Background Information
    On November 6, 2012, 66.75% of the voters of San Leandro passed Measure L, an Educational Parcel Tax to protect and preserve important programs and services for students. The parcel tax is for five years and includes an independent Citizen's Oversight Committee. The parcel tax also provides for an exemption for seniors and eligible individuals with disabilities. It is fiscally prudent and common for districts to seek the services for an expert provider to administer and process both exemptions and to levy the parcel tax. The scope of work includes such tasks as: full service, year-round administration; identifying and verifying all parcels that should be subject to the parcel tax, calculating each parcel tax, determining parcel tax levies, responding to public inquiries and appeals, meeting legal reporting and accountability requirements, liaison with county assessor and county tax collector, etc. SCI Consulting Group has worked with many school districts including: Albany, Alameda, Dublin, West Contra Costa, and Davis Joint Unified. The contract proposal is attached.
    From
    Cindy M. Cathey, Superintendent

    Outcome

    Motion - Motion made by Diana Prola and a seconded by Ron Carey. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Ye

    Attachments

  57. 21 INFORMATION ITEMS - 9:40-9:50 p.m.
  58. 21.1 Information Items
    Quick Summary / Staff Recommendation
    These items are intended to keep the Board informed on various District business matters which do not require action by the Board.
  59. 22 Business and Operations
  60. 22.1 Miscellaneous Receipts
    Minutes
    Miscellaneous receipts in the amount of $14,083,666.58 have been deposited in the Treasury of Alameda County.
    Quick Summary / Staff Recommendation
    Miscellaneous Receipts in the amount of $14,083,666.58
  61. 23 Facilities and Construction
  62. 23.1 Exterior Colors for the San Leandro High School Swim Center 📎 1
    Fiscal Impact
    The SLHS Swim Center is funded through Measure M.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    The Board of Education to receive this information for review.
    Board Committee
    Facilities and Construction Committee: December 5, 2012
    Background Information
    One of the major marquee projects identified in the Measure M language is the San Leandro High School Swim Center and Fields project. The District retained WLC Architects, Inc. to design and prepare all the design and construction documents. Plans and specifications were approved by the Division of the State Architect (DSA) on May 18, 2012, and the project was bid through the requirements of Public Contract Code. On July 10, 2012, the District received bids through the formal sealed bid opening process, per State of California Public Contract Code requirements, for the San Leandro High School Swim Center and Fields project. On July 17, 2012, the Board of Education awarded the contract to F&H Construction, Inc., which submitted the lowest responsive, responsible bid. WLC Architects developed a color scheme for the SLHS Swim Center that was aesthetically pleasing and in harmony with the color palette chosen for both the Arts Education Center and the Career Technical Education Center, both located at the San Leandro High School main campus (a similar color palette was also chosen for the Fred T. Korematsu campus, helping to unify the relationship with the main campus). In addition to the aesthetic appeal, the paint, colors and placement proposed were also selected to provide additional benefits to the center, such as reduction of glare from the sun and pool, and durability and resistance to corrosion from chlorine, etc. The proposed exterior colors for the SLHS Swim Center were presented to administrators at the high school, and on December 5, 2012, presented to the Facilities and Technology Committee.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  63. 24 REORGANIZATION OF THE BOARD - 7:20-7:35 p.m.
    Minutes
    Trustee Katz-Lacabe prefaced the voting by explaining that each Board member received ballots for Board President, Vice-President and Clerk. When the nominations have been completed, the Board member will write down his selection on the appropriate ballot. The ballots will be collected by the Administrative Assistant and read a loud. It was noted that per the Board Bylaws, "Before serving as Board President, the Trustee must have completed the California School Board Associations' (CSBA) Board President's workshop".
  64. 24.1 Election of President of the Board of Education 2012/2013 Action recorded
    Minutes
    Trustee Prola was nominated for the Office of President. Ballots were collected and the votes were read. Trustee Prola was unanimously elected to the Office of President of the Board of Education for the 2012-2013 school year.
    Actions
    Motion - Motion made by Lance James and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .

    Outcome

    Motion - Motion made by Lance James and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato

  65. 24.2 Election of Vice President of the Board of Education for 2012/2013 Action recorded
    Minutes
    Trustee Toro was nominated for the Office of the Vice President. Ballot were collected and read. Trustee Toro was unanimously elected to the Office of Vice-President of the Board of Education for the 2012-2013 school year.
    Actions
    Motion - Motion made by Vince J. Rosato and a seconded by Lance James. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .

    Outcome

    Motion - Motion made by Vince J. Rosato and a seconded by Lance James. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato

  66. 24.3 Election of Clerk of the Board of Education for 2012/2013 Action recorded
    Minutes
    Trustee Carey was nominated to the Office of Clerk. The ballots were collected and read. Trustee Carey was unanimously elected to the Office of Clerk of the Board of Education.
    Actions
    Motion - Motion made by Lance James and a seconded by Diana Prola. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .

    Outcome

    Motion - Motion made by Lance James and a seconded by Diana Prola. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .;

  67. 25 ADDITIONAL SUGGESTIONS AND COMMENTS FROM BOARD MEMBERS-9:50 p.m.
    Minutes
    Trustee L?pez congratulated the new officers and thanked staff for the explanation of the budget, adding that she was happy that she attended the Finance Committee meeting prior to the Board meeting which helped her to be better prepared for the discussion on the First Interim Report. She thanked the community for giving her the opportunity to serve as a Trustee and for the support from the teachers' union. Trustee Toro thanked staff for the budget presentation. Trustee Carey welcomed the new board members and congratulated the new officers. He attended the Lenny Williams Concert and it was great, adding that students from the Regional Occupational Program prepared the food for the event. Friday will be the San Leandro High School Fundraiser at Drakes. He also announced that he will not be at the January 15 Board meeting. Trustee James disclosed that on December 7 he received a DUI, stating, "I must disclose to the Board that I received a DUI Friday night. I made a poor decision and am paying the price. This is teaching me to slow down and make better judgments." "I assure you that I take my position on the board and in the community very seriously and that nothing like this will happen again." Trustee Prola thanked for the Board for the confidence in electing her President. She asked for consensus to schedule a Board retreat; however, it was noted that consensus was received at the last meeting. Trustee Rosato thanked the San Leandro Teachers' Association for their overview of the budget and appreciated the "behind the scenes" work. Trustee Katz-Lacabe welcomed the new Trustees and is looking forward to working together. For the benefit of the new trustees, he reiterated a concern that he has mentioned before with regards to reducing the size of the Board from 7 to 5 members. Following Board member comments, the Board adjourned into closed session at 8:21 p.m.
  68. 26 ANNOUNCEMENT
  69. 26.1 Board of Education Meetings
    Minutes
    Regular Board Meeting - December 18, 2012 (cancelled) Regular Board Meeting - January 15, 2013 Regular Board Meeting - January 29, 2013 Regular Board Meeting - February 5, 2013 Tentative Board Meeting/Work Session - February 12, 2013 (District Office) Regular Board Meeting - February 26, 2013 Regular Board Meeting - March 5, 2013 Special Board Meeting - March 12, 2013 (District Office) Regular Board Meeting - March 19, 2013 Regular Board Meeting - April 2, 2013 Regular Board Meeting - April 16, 2013 Regular Board Meeting - May 7, 2013 Tentative Board Meeting/Work Session - May 14, 2013 (District Office) Regular Board Meeting - May 21, 2013 Regular Board Meeting - June 4, 2013 Regular Board Meeting - June 18, 2013 Special Board Meeting - June 25, 2013 (District Office)
    Quick Summary / Staff Recommendation
    Regular Board Meeting - December 18, 2012 (cancelled) Regular Board Meeting - January 15, 2013 Regular Board Meeting - January 29, 2013 Regular Board Meeting - February 5, 2013 Tentative Board Meeting/Work Session - February 12, 2013 (District Office) Regular Board Meeting - February 26, 2013 Regular Board Meeting - March 5, 2013 Special Board Meeting - March 12, 2013 (District Office) Regular Board Meeting - March 19, 2013 Regular Board Meeting - April 2, 2013 Regular Board Meeting - April 16, 2013 Regular Board Meeting - May 7, 2013 Tentative Board Meeting/Work Session - May 14, 2013 (District Office) Regular Board Meeting - May 21, 2013 Regular Board Meeting - June 4, 2013 Regular Board Meeting - June 18, 2013 Special Board Meeting - June 25, 2013 (District Office)
  70. 27 ADJOURNMENT*
  71. 27.1 Time Action recorded
    Minutes
    The Board reconvened to open session at 9:14 p.m., where no action was taken. The meeting was adjourned at 9:15 p.m.
    Actions
    Motion - Motion made by Ron Carey and a seconded by Lance James. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .

    Outcome

    Motion - Motion made by Ron Carey and a seconded by Lance James. | Vote: Yes Lance James .; Yes Ron Carey .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Ye

Contracts and agreements on this agenda 9

Extracted automatically from the agenda items and attachments; amounts appear only when printed in the documents.

ItemVendor / partyDescriptionAmount
2.4 Real Property NegotiatorProperty: 13666 E. 14th Street, San Leandro, California Agency Negotiator: Cindy Cathey, Superintendent; Song Chin-Bendib, Assistant Superintendent Business and Operations; C. John Dominguez, School Site Solutions,...—
14.1 Achieve Learning and Resource Center, IncApprove the Addendum to the Memorandum of Understanding Between the San Leandro Unified School District and Achieve Learning and Resource Center, Inc. for SAT Prep at San Leandro High School for the 2012-2013 School Year$2,500
14.2 Napa, Solano, Contra Costa Educational Support TeamApprove the Amendment to the Contracted Services Agreement Between San Leandro Unified School District and Napa, Solano, Contra Costa Educational Support Team for Mathematics Institute at San Leandro High School for...$4,800
14.3 SpectrumApprove non-public school/agency contracts as listed above for the 2012-2013 school year.$ 25,920.00
14.3 Progressus Therapy, LLCApprove non-public school/agency contracts as listed above for the 2012-2013 school year.—
16.1 SIM ArchitectsApprove Amendment #4 in the amount of $90,000 to the Design Services Contract with SIM Architects to add Measure B Savings Modernization at James Madison Elementary School for seismic upgrade and window replacement scopes.$90,000
16.2 AEDIS ArchitectsApprove Amendment #5 for $29,000 to the Design Services Contract with AEDIS Architects to change the design services from Portable Replacements to Modular Classrooms at Washington Elementary School.$29,000
16.3 American Modular SystemsApprove the Budget Increase of $750,000, from $2,300,000 (original estimate if modulars were purchased through units stockpiled from another district) to $3,050,000, for the Washington Elementary School Classrooms...$1.5 million
20.2 Parcel Tax Levy and Exemption AdministrationApprove the contract between the San Leandro Unified School District and SCI Consulting Group for Measure L Parcel Tax Exemption Administration and Levy for the 2013-2014 through 2015 - 2016 school years$750

Document

Open in new tab