San Leandro Unified School DistrictTradition and Innovation

Regular

Regular Board Meeting

· 7:00 PM

San Leandro City Council Chambers 835 E. 14th Street San Leandro, CA

Agenda 107 items

  1. 0 CALL TO ORDER/ROLL CALL - 6:00 P.M.
    Minutes
    The meeting was called to order by President Prola at 6:00 p.m. It was noted that all Board members were present with the exception of Trustee Carey.
  2. 1 PUBLIC TESTIMONY - CLOSED SESSION ITEMS
    Minutes
    There were no public comments regarding the closed session agenda.
  3. 2 RECESS INTO CLOSED SESSION - 6:00 P.M.
    Minutes
    The Board recessed into closed session at 6:01 p.m.
  4. 2.1 Student Expulsions; Education Code 35146 and 48918(c)
  5. 2.2 Public Employee Performance Evaluation, Title: Superintendent, Government Code Section 54957
  6. 2.3 Public Employee Discipline/Dismissal/Release/Hiring; Government Code Section 54957
  7. 2.4 Conference with Labor Negotiator; Government Code Section 54957.6
  8. 2.5 Conference with Real Property Negotiator - Property: Government Code Section 54956.8
    Quick Summary / Staff Recommendation
    Property: 13666 E. 14th Street, San Leandro, California Agency Negotiator: Cindy Cathey, Superintendent; Song Chin-Bendib, Assistant Superintendent Business and Operations; C. John Dominguez, School Site Solutions, Inc.; Philip Henderson, Orbach, Huff & Suarez, LLP Negotiating Parties: Potential party for negotiated purchase is Girls, Inc. Under Negotiation: Price and terms of payment for potential purchase.
  9. 2.6 Conference with Legal Counsel - Existing Litigation - 1 case, Government Code Section 54956.9
  10. 2.7 Liability Claim
    Quick Summary / Staff Recommendation
    Pursuant to Government Code Section 54954 et seq. and 54956.95. Personal injury claim filed by Anastacia Fialho against San Leandro Unified School District
  11. 3 RECONVENE TO OPEN SESSION - 7:00 p.m.
    Minutes
    The Board reconvened to open session at 7:00 p.m.
  12. 3.1 Report on Closed Session Action
  13. 3.2 Pledge of Allegiance
    Minutes
    President Prola led the Pledge of Allegiance to the Flag.
  14. 3.3 Approval of Agenda Action recorded
    Minutes
    The Board approved the Regular Board meeting agenda for January 15, 2013. Trustee Carey was absent.
    Actions
    Motion - Motion made by Lance James and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the Regular Board meeting agenda for January 15, 2013.

    Outcome

    Motion - Motion made by Lance James and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Tor

  15. 3.4 LEGAL STATEMENT
    Quick Summary / Staff Recommendation
    Members of the audience who wish to address the Board are asked to complete the yellow card available at the entrance and submit it to the Board's Administrative Assistant. Speakers who have completed the card will be called when the item is reached on the agenda or, for non-agenda items, during the Public Testimony. Cards are to be turned in before the item is reached on the agenda. Please note that the meeting is being recorded. State law prohibits the Board of Education from taking any action on or discussing items that are not on the posted agenda except to A) briefly respond to statements made or questions posed by the public in attendance; B) ask questions for clarification; C) provide a reference to a staff member or other resource for factual information in response to the inquiry; or D) ask a staff member to report back on the matter at the next meeting and/or put it on a future agenda. (Government Code 54954.2(a)).
  16. 4 CELEBRATING OUR SCHOOLS - 7:05-7:20 p.m.
  17. 4.1 San Leandro High School Annual Season of Service, Period of Peace Launch
    Minutes
    San Leandro High School proudly shared their award winning community service learning activities and projects during the Season of Service, Period of Peace which runs from Dr. Martin Luther King, Jr. Day through Cesar Chavez Day March 30. San Leandro High School teachers Jill Synott, and Phil Hargrave, and San Leandro High School student Valencia Clark, President of the Student Peace Council for Season of Service, shared their inspiring and creative thinking as they launch this year's Season of Service, Period of Peace. Highlights included: Season of Service Period of Peace began in 2006 with twenty-four students from the San Leandro Academy for Multimedia (SLAM) participating in a "Fast for Non-Violence." This year, approximately 1500 students from such groups as SLAM, AVID Program, After School Program, Academies, sports teams, Special Education, and various school departments will be participating in this 10-week campaign to create campus climate that values non-violence Activities will be happening simultaneously at the FTK Campus and the San Leandro High School main campus At the conclusion, there will be two all-school assemblies celebrating the students and all the work they have done For the past two years San Leandro High School has won awards, specifically noting that last year, SLAM was honored with the "Promising Practices Award" from the Character Ed partnership Mr. Hargrave provided a video of last year's presentation highlighting how the various service groups demonstrated peace, along with one of the student projects from SLAM on cyber-bullying. Following the video, Ms. Synott said that this year's theme focuses on personal responsibility and what it means to be an ally to your peers, and helping to create a safe place for all kids on campus. Upcoming projects for this year include: The Black Student Union (BSU) will be holding an all-school poetry contest Club Rainbow will be conducting classroom visits to educate students about gender diversity, and gender bullying. They will also be hosting a screening of "Straightlaced" in the AEC on February 1 DECA will be targeting cyber-bullying Boys Basketball is teaming up with the severely disabled Special Ed. students regarding being an ally to your peers The English classes will be working together to help bridge the gap between the SLHS and FTK campuses AVID is creating anonymous bullying tip-box on the FTK campus SLAM is participating in the SLAM Fast for Nonviolence San Leandro High School student Valencia Clark shared her thoughts and experience, adding that she is very excited about this year and invited the Board to participate and attend the assemblies. The Board thanked the high school staff for this very touching and informative presentation and for guiding the students. A copy of this year's schedule will be sent to the Board.
    Quick Summary / Staff Recommendation
    San Leandro High School is proud to share their award winning community service learning activities and projects during the Season of Service, Period of Peace from the end of January through Cesar Chavez Day March 30th. Jill Synott, SLHS teacher, and other staff and students will share their inspiring and creative thinking as they launch this year's Season of Service, Period of Peace.
  18. 5 PUBLIC TESTIMONY ON NON-AGENDA ITEMS-7:20-7:30 p.m.
    Minutes
    Joseph Stegner, Jr., a resident of San Leandro and a former student of Sandy Hook Elementary School, addressed the Board regarding a song that he wrote a couple of months before the tragedy in Newton, Connecticut. He is hoping to find an elementary school chorus to sing an excerpt of the song (which he distributed) to add to a collection of work by Sandy Hook School alumni, while inspiring the singers and their audiences for years to come. He hoped that the Board would find the lyrics moving and asked if he could be directed on how to proceed.
  19. 6 PRESENTATION - 7:30-7:45 p.m.
  20. 6.1 2011-2012 Independent Audit Report
    Minutes
    Terri Montgomery, Principal, from Vavrinek, Trine, Day and Co, LLP, District's independent auditor, presented the audit report related to the District financial statement for the year ending June 30, 2012 (2011-2012). The audit report includes the District financial statements, supplemental information, auditor's opinions on the financial statements, federal compliance, and state compliance. Ms. Montgomery reported that that District received one significant deficiency with the finding related to the Associated Student Body (ASB). Responding to the ASB finding, Assistant Superintendent Song Chin-Bendib noted that the site office managers and ASB staff members were sent to workshop in November 2012, and the district will also continue to monitor the sites with periodic site visits to review student body activities and to tighten and strengthen the internal controls surrounding the student body funds. In addition, Ms. Montgomery will be giving a presentation on January 18, 2013, for Principals, Office Managers and other staff who are directly involved with Donations and ASB funds. Following up on a comment made by Trustee Katz-Lacabe that findings related to ASB funds are a frequent area of work needed, not only in our District, but other districts, Ms. Montgomery said that out of approximately 250 school district audits their firm does a year, about 80% have an ASB finding, adding that for the first year they audit a district, it is very rare that that is the only finding, commending the District for receiving only this one. In addition, Vavrinek, Trine, Day and Co, LLP, shared with the Board the Performance Audit on the Measure B and Measure M Bond funds. A Performance Audit requires the independent auditors to randomly select the sample of expenditures using a statistical methodology that provides high accuracy and a wide range of transactions. The Performance Audit will be presented to the Citizens Bond Oversight Committee (CBOC) on February 13, 2013. It was noted that two corrections were made on the Measure M and Measure B financial audits, adding that they have been fixed and a revised copy will be distributed to the Board, District Office staff, and the Citizens Bond Oversight Committee (CBOC). Ms. Montgomery concluded that the District continues to have consecutive excellent audit reviews, with the performance audit on Measure B and M showing funds were expended only on the voter-approved Measure B and M projects, for the fourth year in a row. The Board thanked the audit firm for their service.
    Quick Summary / Staff Recommendation
    Goal #2: Ensure the Financial Stability and Efficiency of the District Vavrinek, Trine, Day and Co, LLP, District's independent auditor, will present the audit report related to the District financial statement for the year ended June 30, 2012 (2011-2012). The audit report includes the District financial statements, supplemental information, auditor's opinions on the financial statements, federal compliance, and state compliance. In addition, Vavrinek, Trine, Day and Co, LLP, will share with the Board the Performance Audit on the Measure B and Measure M Bond funds. The Performance Audit will be presented to the Citizens Bond Oversight Committee (CBOC) on February 13, 2013.
  21. 7 ACTION ITEM - 7:45-7:50 p.m.
  22. 7.1 Approval of Action Items
    Quick Summary / Staff Recommendation
    These items are presented for action at this time. Some may have been reviewed at a previous meeting.
  23. 8 Business and Operations
  24. 8.1 2011-2012 Fiscal Year Independent Audit Report Action recorded
    Fiscal Impact
    The cost of the audit is $33,600 from the General Fund and $6,100 from the Bond Fund. This cost is included in the approved District budget.
    To
    Cindy M. Cathey, Superintendent
    Minutes
    The Board approved acceptance of the Independent Audit Report for fiscal year 2011-2012 as prepared by Vavrinek, Trine, Day & Co., LLP. Trustee Carey was absent.
    Actions
    Motion - Motion made by Mike Katz-Lacabe and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Accept the Independent Audit Report for fiscal year 2011-2012 as prepared by Vavrinek, Trine, Day & Co, LLP.
    Board Committee
    Finance Committee meeting: December 3, 2012
    Policy / Code
    Office of Management & Budget (OMB) Circular A-133
    Background Information
    Vavrinek, Trine, Day & Co, LLP, (VTD) has performed a detailed audit of the District?s financial records on all funds for the 2011-2012 fiscal year. VTD will be presenting their audit findings and recommendations. Additionally, VTD will share with the Board the Performance Audit conducted by the auditors on Measure B and M Bond funds. A Performance Audit requires the independent auditors to randomly select the sample of expenditures using a statistical methodology that provides high accuracy and a wide range of transactions. VTD audited the District?s 2011-2012 financial records in accordance with the new Performance Audit standards and will share with the Board the Performance Audit conducted. The Performance Bond audit will be presented to the Citizens Bond Oversight Committee (CBOC) on February 13, 2013. The District continues to have consecutive excellent audit reviews, with the performance audit on Measure B and M showing funds were expended only on the voter-approved Measure B and M projects, for the fourth year in a row.
    From
    Sing Chin-Bendib, Assistant Superintendent, Business and Operations

    Outcome

    Motion - Motion made by Mike Katz-Lacabe and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason To

  25. 9 PRESENTATION - 7:50-8:10 p.m.
  26. 9.1 Eden Area Regional Occupational Program (ROP) Annual Report
    Minutes
    As a partner in education, the Eden Area Regional Occupational Program (ROP) offers rigorous and relevant career technical education to students in the San Leandro Unified School District. In the 2011-2012 school year 1,500 of our high school students were enrolled in ROP programs?both at the Lincoln and SLHS campuses as well as at the ROP Center in Hayward. ROP?s focus on college and career readiness has given many San Leandro students their start each year in exciting and rewarding careers through secondary Career-Technical Education (CTE) courses and pathways. In addition, Eden Area ROP functions as the District's career technical education advisory committee for each pathway to develop recommendations on the program. The Board of Education must annually approve Eden Area ROP as the provider of this function. Dr. Irene Fujii, Superintendent of Eden Area ROP, reviewed the 2011-2012 data, program, student highlights and the work ahead. The Board received for information the Eden Area Regional Occupational Program Annual Report. The Board was happy that the District is part of this program and thanked Dr. Fujii for the presentation and for what ROP offers our students. Trustee Rosato asked that copies of the written slides of the presentation be sent to the Board.
    Quick Summary / Staff Recommendation
    As a partner in education, the Eden Area Regional Occupational Program (ROP) offers rigorous and relevant career technical education to students in the San Leandro Unified School District. In the 2011-2012 school year, our high school students were enrolled in ROP programs?both at the Lincoln and SLHS campuses as well as at the ROP Center in Hayward. ROP?s focus of college and career readiness has given many San Leandro students their start each year in exciting and rewarding careers through secondary Career-Technical Education (CTE) courses and pathways. In addition, Eden Area ROP functions as the District's career technical education advisory committee for each pathway to develop recommendations on the program. Dr. Irene Fujii, Superintendent of Eden Area ROP, will review the 2011-2012 data, program and student highlights and the work ahead. The Board will receive for information the Eden Area Regional Occupational Program Annual Report. Dr. Irene Fujii, Superintendent of Eden Area ROP, will review the 2011-2012 data, program and student highlights and the work ahead.
  27. 10 ACTION ITEM - Educational Services
  28. 10.1 Eden Area Regional Occupational Program (ROP) Advisory Committee Action recorded
    To
    Cindy M. Cathey, Superintendent
    Minutes
    The Board approved Eden Area ROP to serve as the District's liaison as the career technical education advisory committee, which must be done annually. Trustee Carey was absent.
    Actions
    Motion - Motion made by Mike Katz-Lacabe and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve Eden Area ROP to serve as the District's liaison as the career technical education advisory committee.
    Background Information
    Eden Area Regional Occupational Program (ROP)provides the District with industry standard career technical education pathways for a number of years. Eden Area ROP organizes and facilitates District personnel to serve on the career technical education advisory committee to develop recommendations on the program in each career technical pathway. The District's Board of Education must annually approve Eden Area ROP as the provider of this function.
    From
    Debbie Wong, Assistant Superintendent, Educational Services

    Outcome

    Motion - Motion made by Mike Katz-Lacabe and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason To

  29. 11 PRESENTATION - 8:10-8:40 p.m.
  30. 11.1 Measure M Presentation on the Elementary School Athletic Exteriors
    Minutes
    Assistant Superintendent of Business and Operations, Song Chin-Bendib; John Dominguez, Interim Director of Bond Projects; Kurt Weidmann, Consultant with Harris and Associates; DLM Architecture, SIM Architects, and Van Pelt Construction Services provided a facilities and construction presentation to the Board on the Measure M Exterior Athletic Design and Construction Documents for Garfield, Jefferson, Madison, McKinley, Monroe, Roosevelt, Washington and Wilson Elementary Schools. It was explained that the original scope, as approved by the Board, was to repair the playground equipment. However, with additional savings from bond projects, and discovering that the cost differential between repairing and replacement is minimal, staff requested the architects develop two options for bids: Option A: Repairing playground equipment, and Option B: Replacing playground equipment It was noted that staff was recommending approval of Option B as the marginal cost increase between repairing and replacing equipment is due to the high cost of having to custom fabricate some equipment items which were impossible to replace. Additionally, replacement equipment will last 15 years vs. 5 years for repaired equipment, which is a much better investment. The presentation was followed by a conference item to discuss and consider approval of staff's recommendation and the corresponding construction documents.
    Quick Summary / Staff Recommendation
    Goal #5: Ensure Safe and Well Maintained Facilities Assistant Superintendent of Business and Operations, Song Chin-Bendib; John Dominguez, Interim Director of Bond Projects; Kurt Weidmann, Consultant with Harris and Associates; DLM Architecture, SIM Architects, and Van Pelt Construction Services will provide a facilities and construction presentation to the Board on the Measure M Exterior Athletic Design and Construction Documents for Garfield, Jefferson, Madison, McKinley, Monroe, Roosevelt, Washington and Wilson Elementary Schools. The presentation will be followed by a conference item to discuss and consider approval of the construction documents.
  31. 12 CONFERENCE ITEMS
  32. 12.1 Approval of Conference Items
    Quick Summary / Staff Recommendation
    These items are submitted for advance planning and to assist the Board in establishing future agenda items. The Board may, however, take action on the following:
  33. 13 Facilities and Construction
  34. 13.1 Construction Documents for the Garfield, Jefferson, Madison, McKinley, Monroe, Roosevelt, Washington and Wilson Elementary Schools Athletic Exteriors projects, funded through Measure M Action recorded
    Fiscal Impact
    Cost of replacement is estimated to be only $77,500 more than the cost of repair, and is funded through Measure M.
    To
    Cindy M. Cathey, Superintendent
    Minutes
    The Board approved Option B, replacement of playground equipment, and the Construction Documents for submittal to the Division of the State Architect (DSA), for the Garfield, Jefferson, Madison, McKinley, Monroe, Roosevelt, Washington and Wilson Elementary Schools Athletic Exteriors, funded through Measure M. Trustee Carey was absent.
    Actions
    Motion - Motion made by Mike Katz-Lacabe and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve Option B. Replacement of Playground Equipment, and the Construction Documents for submittal to the Division of the State Architect (DSA), for the Garfield, Jefferson, Madison, McKinley, Monroe, Roosevelt, Washington and Wilson Elementary Schools Athletic Exteriors, funded through Measure M.
    Board Committee
    Facilities and Technology Committee: January 9, 2013
    Background Information
    In November 2010, San Leandro voters passed Measure M, a $50.1 million school facilities bond to address modernization and new construction throughout the District, including the renovation of the Pacific Sports Complex and Burrell Field, renovation of the San Leandro High School Swim Center, a new track and field at John Muir Middle School and various other projects at all school sites throughout the District. In order to design facilities that will best serve the needs of our students, schools and the community, the District used the same successful Conceptual Design Team process that was used for the Measure B Bond Program. Three Conceptual Design Teams were formed: Pacific Sports Complex and Burrell Field San Leandro High School Swim Center, Track and Field Elementary and Middle Schools Athletic Exteriors The Conceptual Design Teams for the Elementary and Middle Schools Athletic Exteriors held their three meetings: October 25, November 9, and November 29, 2011. During the first meeting members were introduced to one another, meeting norms were established, and an overview of the architectural design process and the role of the Conceptual Design Team were provided. After a review of each site, stakeholders from each school identified all the current uses, expressed potential uses they would like to see at the site, asked questions, and voiced concerns and needs. The architects incorporated the feedback and suggestions, and at least one schematic review design meeting was held at each site. The schematic designs were presented to the Board of Education and approved on July 17, 2012. The architects have taken the approved schematic designs and further refined them based on additional meetings with the sites in order to develop the Construction Documents for submittal to the Division of the State Architect (DSA) for review and approval. The original scope as approved by the Board is to repair the playground equipment. However, with additional savings from bond projects, and discovering that the cost differential between repairing and replacement is minimal, staff requested the architects to develop two options for bids: A) repairing playground equipment, and B) replacing playground equipment. The marginal cost increase between repairing and replacing playground equipment is due to the high cost of having to custom fabricate some equipment items which were impossible to replace. Additionally, replacement equipment will last 15 years vs. 5 years for repaired equipment, which is a much better investment. Staff is recommending approval of Option B, and approval of the corresponding Construction Documents for the Elementary Schools Athletic Exteriors.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Outcome

    Motion - Motion made by Mike Katz-Lacabe and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason To

  35. 14 REPORTS - 8:40-8:55 p.m.
  36. 14.1 Student Board Member Report
    Minutes
    Student Board Member Elisha Feliciano provided the Board with an update on activities at the San Leandro High School main campus and the Fred T. Korematsu campus. Highlights included: Track season has begun. The athletes are anticipating the completion of the new track and field Following the tragedy in Connecticut early this year, students became concerned about the procedures that the District has in place should something like this happen About a week ago, one of the high school's students, Tyronta Mickens, was shot and killed, stating that in his honor, a large piece of paper was placed in the cafeteria where students came and wrote their sentiments regarding him. Upcoming events for this week include: Finals week began yesterday, stating that students are taking advantage of the library services and tutors "Season of Service" begins on Tuesday, January 22, reminding the Board of the project she introduced, "One Love". She thanked those Trustees who have participated, adding that there is still time to send in your letters This weekend the Business Academy will be attending a NORCAL competition On February 1, Club Rainbow will be featuring a screening of "Straightlaced in the Arts Education Center regarding gender stereotypes. The community is welcome.
  37. 14.2 Union Representative Reports
    Minutes
    There were no union representative reports.
  38. 14.3 Superintendent's Report
    Minutes
    Superintendent Cathey acknowledged the Keep Music Rockin Foundation, and students in the San Leandro High School Jazz Band for submitting a video request to Carlos Santana inviting him to visit the high school and meet with them. Later the students were invited to join him for a jam session. The Superintendent provided a brief summary of the School Services of California (SSC) workshop on the Governor's Proposed Budget which was attended by Assistant Superintendent Song Chin-Bendib, Trustee James, and her today, reporting that normally you come away with an understanding of the impact of the budget to the District; however, that was not the case as the "weighted formula", now called the Local Controlled Funding Formula (LCFF) is unknown at this time. SSC is working really hard to figure out what it means for districts. On the positive side, she said this is the first time in five years that funding is going up, noting that the process has just begun. Hopefully there will be some clarity when the May Revise comes out. The Superintendent added that Assistant Superintendent Chin-Bendib will be providing a detailed presentation on the budget at the January 29, 2013, Board meeting. The Superintendent attended the City Council work session last night where they discussed fee structures for the use of the fields by the City, by residents and by non-residents. They also had a preliminary discussion about Burrell Field and the Pacific Sports Complex, noting that limited funds is an issue. Staff will come back to the Board with some options, and next steps. The Superintendent reminded the new Board members of the New Board Orientation tomorrow with Educational Services from 5:30-7:00 p.m. at the District Office. Following the Superintendent's report, Trustee Katz-Lacabe asked that information regarding the death of the San Leandro High School student be included in the next Confidentially Speaking.
  39. 15 BOARD COMMITTEE REPORTS-8:55-9:00 p.m.
  40. 15.1 Facilities and Technology
    Minutes
    Trustee Prola reported that the Facilities & Technology Committee met on January 9, 2013, and discussed many items that are on the agenda tonight for Board consideration, notably, the renewal of the contract with School Site Solutions, Inc. to continue to provide temporary support for Bond projects, Notice of Completion for Trinet Construction at Lincoln High School, and on-going contracts for the work at the elementary schools and Burrell Field.
  41. 16 CONSENT ITEMS - 9:00-9:20 p.m.
  42. 16.1 Approval of Consent Items Action recorded
    Minutes
    The Board approved the Consent Items. Trustee Carey was absent.
    Actions
    Motion - Motion made by Vince J. Rosato and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    These items are considered routine and may be enacted by a single motion. At the request of any member of the Board, any item on the consent agenda shall be removed and given individual consideration for action as a regular agenda item.

    Outcome

    Motion - Motion made by Vince J. Rosato and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Tor

  43. 17 General Services
  44. 17.1 Approval of Minutes - November 13, 2012 📎 1
    Quick Summary / Staff Recommendation
    Approve the minutes of the Special Board meeting held on November 13, 2012.

    Attachments

  45. 17.2 Approval of Minutes - December 4, 2012 📎 1
    Quick Summary / Staff Recommendation
    Approve the minutes of the Regular Board meeting held on December 4, 2012.

    Attachments

  46. 17.3 Approval of Minutes - December 11, 2012 📎 1
    Quick Summary / Staff Recommendation
    Approve the minutes of the Special Board meeting held on December 11, 2012.

    Attachments

  47. 17.4 Resolution #13-01 Signature Card - Board Members 📎 1
    To
    Board of Education
    Quick Summary / Staff Recommendation
    Adopt Resolution #13-01 - Signature Card - Board Members
    Board Committee
    Non Applicable
    Policy / Code
    Education Code Section 42632 and 42633
    Background Information
    Pursuant to Education Code Section 42632, each order drawn on the funds of a school district shall be signed by a least a majority of the members of the Governing Board of the district, or by a person or persons authorized by the Governing Board to sign order in its name. ?The Governing Board of each school district shall be responsible for filing such signatures with the County Office of Education per Education Code Section 42633. ? This Resolution supersedes all previous resolutions representing signatures of the Governing Board, and declares said prior resolution null and void.?
    From
    Cindy Cathey, Superintendent

    Attachments

  48. 17.5 Resolution #13-02 Signature Card - Authorized Agents on Payroll Warrants and Disbursements 📎 1
    To
    Board of Education
    Quick Summary / Staff Recommendation
    Adopt Resolution #13-02 Signature Card - Authorized Agents on Payroll Warrants and Disbursements.
    Board Committee
    Non Applicable
    Policy / Code
    Education Code Sections 42632 and 42633
    Background Information
    Each year, pursuant to Education Code Section 42632, each order drawn on the funds of a school district shall be signed by at least a majority of the members of the Governing Board of the district, or by a person or persons authorized by the Governing Board to sign order on payroll warrants and disbursements in its name. The Governing Board of each school district shall be responsible for filing such signatures with the County Office of Education per Education Code Section 42633. This resolution supersedes all previous resolutions authorizing such signature(s) on behalf of the Governing Board, and declares said prior resolutions null and void.
    From
    Cindy Cathey, Superintendent

    Attachments

  49. 17.6 Resolution #13-03 Signature Card - Authorized Agents on Official Documents and Reports 📎 1
    To
    Board of Education
    Quick Summary / Staff Recommendation
    Adopt Resolution #13-03 Signature Card - Authorized Agents on Official Documents and Reports.
    Board Committee
    Non Applicable
    Background Information
    The San Leandro Unified School District occasionally must provide signature approval on certain official documents and reports, including local, State and Federal reports, such as Transportation, Attendance, and Class Size Reduction; and this resolution supersedes all previous resolutions authorizing such signature(s) on certain official documents and reports, and declares said prior resolutions null and void.
    From
    Cindy Cathey, Superintendent

    Attachments

  50. 18 Human Resources
  51. 18.1 Certificated Personnel Report 📎 1

    Attachments

  52. 18.2 Classified Personnel Report 📎 1

    Attachments

  53. 19 Educational Services
  54. 19.1 Resolution No. 13-05 National No Name Calling Week, January 21-25, 2013 📎 1
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Adopt Resolution No. 13-05 National No Name Calling Week, January 21-25, 2013
    Policy / Code
    Board Policy 5145.3 Non-Discrimination/Harassment Board Policy Bullying/Cyberbullying
    Background Information
    All schools in the San Leandro Unified School District are working diligently to ensure that every school and every classroom are free of all forms of bullying. National research and mental health organizations tell us that every year, students of all ages in schools across the nation encounter various forms of bullying such as physical bullying (hitting and/or punching), verbal bullying (teasing or name calling), emotional bullying (intimidation through gestures or social exclusion) or cyber bullying (sending insulting messages by phone or computer e-mail). Victims of bullying can suffer long term negative effects. Each year all schools receive information and curriculum resources to address this issue from the www.nonamecallingweek.org website. To solidify the District?s continued commitment to creating safe, respectful, and inclusive schools and classrooms, staff is recommending the Board of Education adopt a resolution in support of and to ensure the District?s schools? participation in ?National No Name Calling Week? (January 21-25, 2013) and promote anti-bullying messages and practices through this national event.
    From
    Debbie Wong, Assistant Superintendent, Educational Services

    Attachments

  55. 19.2 Contracted Services Agreement Between San Leandro Unified School District and Hatchuel, Tabernik & Associates, Inc. (HTA) for Development of the Planning Process and Facilitation for Full Service Community Schools for the 2012-2013 School Year 📎 1
    Fiscal Impact
    None to the General Fund; $19,388 from the District's San Francisco Foundation Grant for Full Service Community Schools Planning Process
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve the Contracted Services Agreement Between San Leandro Unified School District and Hatchuel, Tabernik & Associates, Inc. (HTA) for Development of the Planning Process and Facilitation for Full Service Community Schools for the 2012-2013 School Year
    Background Information
    For the past two years, with the assistance from Hatuchuel Tabernik & Associates, Inc. (HTA), the District was fortunate to receive two community schools planning grants from the San Francisco Foundation for $20,000 each year. The District seeks to contract again with HTA to work collaboratively with the District in continuing the planning and facilitating process to develop full service community schools beginning with San Leandro High School. The scope of work will begin from January through June 2013 and include: Plan and implement Full Service Community Schools process meetings Support and facilitate the SLHS pilot of Full Service Community Schools Work in collaboration with Alameda County public agencies to engage their participation and leverage their resources in Full Service Community Schools planning and sustainability Assist in the Full Service Community Schools Board Resolution Support the evaluation of ongoing efforts Prepare all progress reports and complete San Francisco Foundation reports One tangible future outcome will be to provide a school-based health center for the SLHS campus of which the community schools process will support and leverage resources and sustainability.
    From
    Debbie Wong, Assistant Superintendent, Educational Services

    Attachments

  56. 19.3 2012-2013 Non-Public School/Agency Contracts 📎 2
    Fiscal Impact
    $242,233.00- Special Education funds.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve non-public school/agency contracts as listed above for the 2012-2013 school year.
    Board Committee
    Not Applicable
    Policy / Code
    Education Code: 56365(a) Education Code: 56361(3) Education Code: 56366
    Background Information
    New non-public school placement contracts for the school year 2012-2013. Student # DOB Cost Location # 1 02/08/97 $200,575.00 North Valley Schools # 2 11/24/96 $21,624.00 Seneca Family of Agencies # 3 05/20/98 $20,034.00 Seneca Family of Agencies Total $242,233.00
    From
    Debbie Wong, Assistant Superintendent, Educational Services

    Attachments

  57. 20 Business and Operations
  58. 20.1 Ratification of Payroll
    Quick Summary / Staff Recommendation
    Ratify December payroll in the amount of $5,494,168.71.
  59. 20.2 Approval of Bill Warrants 📎 1
    Quick Summary / Staff Recommendation
    Approve Bill Warrants #88-50208194 - 88-50218622 in the amount of $2,531,478.79

    Attachments

  60. 20.3 Intra-Budget Transfers and Revisions 📎 2
    Quick Summary / Staff Recommendation
    Approve the request for Intra-Budget Transfers and Revisions for December 2012.

    Attachments

  61. 20.4 Extension of Contract for Network Administrator ? James Foster 📎 1
    Fiscal Impact
    The proposed contract for James Foster?s services will be $50 per hour for a total of $9,600 out of the General Fund budget (it is part of the budget; no additional cost). This contract will cover up through March 31, 2013.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve extension of the contract for Network Administrator, James Foster, to assist the District in administering and managing its data network through March 31, 2013.
    Background Information
    This contract is to extend James Foster?s (Jim) services in the Information Technology (IT) Department from January 2013 to end of March 2013. James Foster has assisted the IT Department of San Leandro Unified in maintaining our data network for the past 20 years. Under the terms of the current contract, Jim is assigned to work 8 hours a day, 2 days a week (totaling 16 hours per week). The details of contract stipulate Jim?s compensation at a rate of $50/hour, not to exceed $39,200 per year. In addition, either party has the option to terminate the contract with 30 day prior notice. These terms and rates have remained the same for the past 4 years. Initially Jim was planning to retire in June of 2012, but the District requested that he postpone his retirement until the District had a plan for the position. Thus, Jim agreed to postpone his retirement until December of 2012, and the Board approved his contract extension on June 5, 2012. On December 4, 2012, the Board approved a Network Technician position in lieu of contracting with Jim, and staff is in the process of filling the position. Filling the position takes longer than expected. Therefore, the District has requested Jim to further postpone his retirement until March 2013. This new contract extension moving forward will only be for the three additional months from January 2013 to end of March 2013. The total amount of the new extension will be $9,600 while maintaining the same hourly rate and hours per week. This will provide the District more time to fill his position and fulfill his responsibilities. It will be difficult, if not impossible, to find someone with Jim?s experience and expertise at the current rate of compensation. James Foster is an asset to the District IT Department. His experience in technology and history in the District has proven to be invaluable to the successful operations of the IT Department, with his 13 year knowledge of our District network and servers. Jim is also employed by Pleasanton Unified on a part time basis and we have benefited on more than one occasion from the experiences he has brought over from Pleasanton. Part of Jim?s responsibilities include, but are not limited to: maintaining the servers to ensure their proper operation, server rebuilds, updating staff accounts and access permissions, configuring/updating the VoIP system and any and all issues that cannot be resolved by the experience and knowledge of a level one computer technician. He is also a great backup person to have when the Information Technology Administrator is not available or to step in to assist the Technology Administrator wherever needed. The District Information Technology Department has not increased staffing since its inception 14 years ago. With the addition of the 9th Grade campus, the new labs at the Business Academy and the Arts & Education Center and the influx of additional computers throughout the District, the Information Technology Department certainly cannot afford to lose the staff it currently has.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  62. 20.5 Contract Services with Finishing Touches to Repair Library Tables at San Leandro High School 📎 2
    Fiscal Impact
    $5,300 from San Leandro High School Library Donation Account
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve the contact with Finishing Touches to repair the San Leandro High School Library tables
    Background Information
    Library tables at San Leandro High School have been vandalized over time and many were in very poor condition. In an effort to repair the tables, the school contacted the Maintenance and Operations Department to determine the best way to repair the tables. The Maintenance Department Manager determined that the tables could not be repaired in-house, by district staff. A cost estimate was obtained by the Maintenance Department from an outside vendor. The cost estimate to properly repair the tables was beyond the affordability of the school. In an effort to find the best deal to repair the tables, San Leandro High School staff sought other estimates. The high school contracted with Finishing Touches to complete the work during the Thanksgiving break. Upon completion of the work, the high school paid the vendor $5,300 from the school?s library donation account. The District?s procedures for hiring an outside contractor and the District?s contract approval process were not followed in this instance. At this time, staff is bringing the contract forward to the Board for approval (post completed work). The correct contract approval process has been reviewed with San Leandro High School staff and such an error should not reoccur.
    From
    Song Chin-Bendib, Assistant Superintendent of Business and Operations

    Attachments

  63. 20.6 Contracts for amounts $5,000 or less for fiscal year 2012-2013 📎 1
    Fiscal Impact
    None, but each contract will be funded based on its budget source requested.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve contracts on the attached spreadsheet which are for amounts $5,000 or less for fiscal year 2012-2013.
    Board Committee
    Board Committee: Finance Committee on June 20, 2011
    Background Information
    Attached is the "summary spreadsheet for all contracts $5,000 or less for fiscal year". The spreadsheet will be provided to the Board at every board meeting if there are any contracts falling under this category. Detailed contract information will not be part of the Board packet but will be available for questions or inspection upon request. For accounting purposes, each contract still requires submission of a requisition for approval by site administrator. All contracts require two signatures - Initiating Administrator and the Chief Business Officer or a Cabinet member.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  64. 21 Facilities and Construction
  65. 21.1 Renew Contract with School Site Solutions, Inc. to Provide Temporary Support for Bond Projects 📎 1
    Fiscal Impact
    Amount is not-to-exceed $132,000 per year plus reimbursement for out-of-pocket expenses for hotel and 50% of gasoline. The cost for 2012-13 would be prorated based on the number of work days.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve renewal of contract with School Site Solutions, Inc. to provide support for bond projects.
    Background Information
    The District has a contract with School Site Solutions, John Dominguez, to serve as the Interim Bond Director and provide support for Measure B and M bond projects. The contract started in September 2012 and has been extended until January 31, 2013, to give staff some time to present a long term plan. The current contract with Mr. Dominguez is at a rate of $85 per hour plus reimbursement for some out of pocket expenses. The existing contract cost is not-to-exceed $24,000 (plus estimated expenses) for a period of approximately three months at three-four days per week. Staff is requesting a long term contract with Mr. Dominguez until December 31, 2014. Mr. Dominguez is currently working 3 days per week and could be up to 4 days depending on needs. The same terms and conditions would be extended in the contract until end of 2014. The estimated cost is not-to-exceed $132,000 per year plus out-of-pocket expenses. Attached is the Consultant Agreement with School Site Solutions. The period covered by the renewal of the contract is February 1, 2013, through December 31, 2014, excluding holidays.
    From
    Song Chin-Bendib Assistant Superintendent, Business & Operations

    Attachments

  66. 21.2 Amendment #1 to the Architectural Services Agreement with DLM, Inc. to provide Athletic Oriented Site Improvements at Seven (7) Elementary School Sites. 📎 1
    Fiscal Impact
    The cost of architectural services is included in the approved Measure M project list from the November 2010 Facility General Obligation Bond Election.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve Amendment #1, to the Architectural Services Agreement with DLM, Inc., in the amount of $22,904, to provide Athletic Oriented Site Improvements at Seven (7) Elementary School Sites.
    Board Committee
    Facilities and Technology Committee: January 9, 2013
    Background Information
    On March 1, 2011, the Board of Education approved DLM Architects, through a Request for Qualifications (RFQ) process, to be placed in an Architectural Pool for use on selected projects as identified through the local Measure M Bond. On December 6, 2011, the Board of Education approved an agreement with DLM, Inc. in the amount of $446,500, which covers athletic-oriented site improvements at Garfield, Jefferson, Madison, McKinley, Monroe, Roosevelt, and Washington Elementary Schools. Amendment #1 modifies the agreement to include requested additional civil survey services at seven elementary school sites, specifically partial topographic survey including features, locations and elevations. The agreement has been reviewed by the District?s former legal counsel and the template has been used as the District standard through Measure B.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  67. 21.3 Final Change Order #3 to the Construction Contract with Trinet Construction, Inc. for the Lincoln High School Renovations, Upgrades, Site Athletic Improvements, and Portable large Classroom Building Project 📎 1
    Fiscal Impact
    The project is funded by Measure B and Measure M Local Bond funds.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve Final Change Order #3 to the Construction Contract, in the amount of $44,687, with Trinet Construction, Inc. for the Lincoln High School renovations, upgrades, site athletic improvements, portable large classroom project and additional fire alarm work.
    Board Committee
    Facilities and Technology Committee: January 9, 2013
    Background Information
    In 2006, renovations and upgrades to Lincoln High School were identified in the Measure B language and in 2007, the renovation project was created. In 2010, Measure M created a project for exterior athletic improvements. In 2011, the Board created a Measure B savings project for a multi-purpose large portable building to provide space for assemblies, inclement weather physical education activities, lunches, and other related indoor activities. In 2011, Jeffery Wong Architects was retained to design and prepare all of the design and construction documents for the three scopes of work. The design called for two contractors, one for the building fabrication and one for the site and other work. On February 28, 2012, the Board approved the piggyback purchase of a pre-approved 40? x 60? portable building from Enviroplex, Inc. On May 15, 2012, the District conducted a formal sealed bid opening process for the sitework project, per State of California Public Contract Code requirements. The site work project for Lincoln High School includes renovations, upgrades, site athletic improvements, and sitework for the 40? x 60? classroom. On June 5, 2012, the Board of Education approved the contract with the lowest responsive, responsible bidder, Trinet Construction, Inc. On August 7, 2012, the Board of Education approved Change Order #1 to Trinet in the amount of $14,687; and on November 6, 2012 the Board of Education approved Change Order #2 to Trinet in the amount of $15,235. Change Order #3, in the amount of $44,687 to Trinet and is required by Code. The existing fire alarm system was a stand-alone system, unmonitored by Sonitrol, but met code requirements and the needs of the District. The project was approved by DSA with the fire alarm as-is. During construction, DSA investigated further and determined that because the campus has expanded with added buildings, and fire alarm codes have changed, a campus wide, addressable, fully monitored fire alarm system is now code required. Contract Summary Item Item Amount Running Contract Total Total Contract Increase Original Contract $854,000 $854,000 0% CO #1 $14,687 $868,687 1.7% CO #2 $15,235 $883,922 3.5% CO #3 $44,687 928,609 8.7% Budget Summary Lincoln High Project Soft Cost Budget $499,114 Trinet Construction (Site) $928,609 Enviroplex (Building) $265,211 TBD (Exterior Doors) $42,000 Project Contingency $4,569 Total Project Budget $1,739,503
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  68. 21.4 Notice of Completion (NOC) for the Lincoln High School Portable Large Classroom Project 📎 1
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve the Notice of Completion (NOC) for the Lincoln High School Portable Large Classroom Project.
    Board Committee
    Facilities and Technology Committee: January 9, 2013
    Policy / Code
    Notice of Completion is subject to approval by the Board of Trustees per Contract Specification 00700 General Conditions, Article 21, and Section 21.05- Board Approval Authorizing Execution of Notice of Completion and Acceptance of Contract.
    Background Information
    All work required of the contractor, Trinet Construction, Inc., has been performed and is now complete. The final construction contract amount is $928,609, which includes three change orders with a combined increase of $74,609 to the original contract amount. Retention is scheduled to be released based on the time frames prescribed by the Public Contract Code. The project was completed on December 19, 2012. The project team included Jeffery E. Wong Architects (Architectural Design) and Harris & Associates (CM).
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  69. 21.5 Change Order #2 to the Construction Contract with F&H Construction for the San Leandro High School Swim Center and Fields Project 📎 1
    Fiscal Impact
    Funded through Measure M and Measure B.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve Change Order #2 to the Construction Contract with F&H Construction in the amount of $20,249 with F&H Construction for the San Leandro High School Swim Center, Fields, Grading and Drainage Projects.
    Board Committee
    Facilities and Technology Committee: January 9, 2013
    Background Information
    One of the major marquee projects identified in the Measure M language is the San Leandro High School Swim Center and Fields project. The District retained WLC Architects, Inc. to design and prepare all the design and construction documents. Plans and specifications were approved by the Division of the State Architect (DSA) on May 18, 2012, and the project was bid through the requirements of Public Contract Code. On July 10, 2012, the District received bids through the formal sealed bid opening process, per State of California Public Contract Code requirements, for the San Leandro High School Swim Center and Fields project. Seven (7) bids were received for the project. The lowest responsive, responsible bid was submitted by F&H Construction, Inc. in the amount of $10,186,000. On July 17, 2012, the Board of Education created the Measure B SLHS Grading & Drainage project and approved the construction contract with F&H Construction, Inc. On November 6, 2012, the Board of Education approved Change Order #1 for the removal and disposal of asbestos containing pipes from various areas of the existing athletic fields at the high school to an approved landfill. Change Order #2, in the amount of $20,249, addresses field conditions to improve safety, or item modifications to increase value, flexibility and/or functionality. It incorporates credits and additions from the value engineering exercise that occurred after the bid/award phase. Contract Summary Item Item Amount Running Contract Total Total Contract Increase Original Contract $10,186,000 10,186,000 0% CO #1 $37,136 $10,223,136 0.36% CO #2 $20,249 10,243,385 0.56% Budget Summary SLHS Swim Center and Fields, Grading and Drainage Projects Soft Cost Budget (Site Costs, Planning, Construction Testing, Construction Inspection, Furniture, Fixtures & Equipment) $4,021,903 Hard Cost Budget Construction Construction Contingency (5%) $10,635,000 $10,186,000 $449,000 Project Contingency $230,407 Total Project Budget $14,887,310
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  70. 21.6 Agreement with Maggiora Bros. Drilling, Inc. for Replacement Irrigation Well Construction at the San Leandro High School Track and Field Project, funded through Measure M 📎 1
    Fiscal Impact
    The cost of construction services is included in the approved Measure B savings project list from the August 2012 and existing Measure M projects.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve the Construction Services Agreement, in the amount of $224,075, with Maggiora Bros. Drilling, Inc. for Irrigation Well Construction at San Leandro High School.
    Board Committee
    Facilities and Technology Committee: January 9, 2013
    Background Information
    On August 7, 2012, the Board of Education approved the creation and funding of the SLHS Irrigation Well Replacement scope from Measure B Savings. On December 6, 2012, the District received two bids for the demolition of the existing well and construction of a new well at SLHS, per Public Contract Code requirements. The low responsive, responsible bidder was Maggiora Bros Drilling, Inc., in the amount of $224,075. This agreement in the amount of $224,075 covers construction of the replacement irrigation well at San Leandro High School. The bids were over the engineer?s original anticipated cost for construction of $170,000. Bid climate, constrained occupied school site and well depth may have been contributing factors to the difference. The replacement irrigation well is required to avoid the continuing general fund costs of purchasing water from East Bay Municipal Utility District to irrigate fields, thus, there is long term savings to the General Fund. The capital cost short fall of $54,075 will be funded from available project contingency. The agreement has been reviewed by the District?s former legal counsel and the template has been used as the District standard through Measure B. Bid Summary Bidder Amount 1 Maggiora Bros Drilling, Inc. $224,075 2 NorCal Pump & Well, Inc. $225,072
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  71. 21.7 Ratification of American Modular Systems (AMS) piggyback contract for Washington Elementary School replacement classrooms 📎 1
    Fiscal Impact
    Portable buildings are paid by Measure B Bond Funds.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve the Agreement in the amount of $1,198,640 with American Modular Systems, Inc. for the Fabrication and Installation of a seven modular classrooms at Washington Elementary School.
    Board Committee
    Facilities and Technology Committee: January 9, 2013
    Background Information
    On July 10, 2012, the Board of Education reviewed and then on August 21, 2012, approved the Measure B Savings Projects, which included the Washington Elementary School Portable Classroom Replacement project in the budgeted amount of $2,300,000. On December 11, 2012, the Board approved a $750,000 increase to the project budget to bring the total project budget to $3,050,000. The $750,000 budget increase is to install modular classrooms instead of portable classrooms. Also on December 11, 2012 the Board granted authority to staff to negotiate and enter into a piggyback agreement up to $1,500,000 with AMS. The District is utilizing a State approved and established procurement and delivery method, commonly referred to as a ?piggyback contract?. For the purchase and installation of modular classroom buildings, this delivery method allows relatively rapid procurement, fabrication, delivery and installation of replacement classrooms at Washington Elementary School over the 2013 summer break, at a competitive price. The piggyback contracting method can be used to procure equipment and modular classroom buildings. An original awarding agency issues bid documents, advertises, and receives competitive bids. In those bid documents there is clause that allows follow-on awarding agencies across the state to, in effect, write a change order to the original contract and receive the same competitive pricing. In addition to knowing the pricing ahead of time, the other main advantage is that the original awarding agency has already satisfied all the bid advertising, notifications and other requirements of Public Contract Code. This saves time and allows factory fabrication to start earlier. In this case, there is a current competitively bid contract between American Modular Systems Inc. and the Biggs Unified School District (BUSD) High Performance Facilities Contract approved by BUSD on 2/16/12, and this is now available for the San Leandro Unified School District to use for the purchase and installation of the modular buildings. On February 16, 2012, the Board of Trustees of the BUSD approved awarding the High Performance Facilities Contract for new modular classroom buildings and site work. The agreement has been reviewed by the District?s legal counsel Orbach, Huff, & Suarez, LLP.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  72. 21.8 Construction Contract with NEMA Construction for the Measure B Savings Madison Elementary School Backup Generator Project 📎 1
    Fiscal Impact
    The cost of construction services is included in the approved Measure B savings project list from the August 2012 and existing Measure M projects.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve the Construction Contract, in the amount of $89,000, with NEMA Construction for Backup Generator Project at Madison Elementary School.
    Board Committee
    Facilities and Technology Committee: January 9, 2013
    Background Information
    On August 7, 2012, the Board of Education approved the creation and funding of the Madison Elementary School Backup Generator Project from Measure B Savings. On January 7, 2013, the District received five bids for the installation of a backup generator at Madison Elementary School, per Public Contract Code requirements. The low responsive, responsible bidder was NEMA Construction, in the amount of $89,000. The agreement has been reviewed by the District?s former legal counsel and the template has been used as the District standard through Measure B. Bid Summary Bidder Amount 1 NEMA Construction $89,000 2 Ray?s Electric $225,072.00 3 Vandon Bros Electric, Inc. $129,600 4 Rodan Builders, Inc. $158,000 5 Redwood Engineering Construction $162,800
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  73. 21.9 Award Bid to First Student, Inc. for the Extracurricular Transportation for San Leandro High School Sports Teams Displaced by the SLUSD Pacific Sports Complex & Burrell Field and the SLHS Swim Center, Track and Field Projects 📎 1
    Fiscal Impact
    The project will be funded by Measure M Local Bond funds. The lowest responsive bid amount is $82,694.
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Approve the Transportation Contract with First Student, Inc. for the Extracurricular Transportation for SLHS Sports Teams Displaced by the SLUSD Pacific Sports Complex & Burrell Field and the SLHS Swim Center, Track and Field Projects.
    Board Committee
    Facilities and Technology Committee: January 9, 2013
    Background Information
    Two of the major marquee projects identified in the Measure M language are the SLUSD Pacific Sports Complex and Burrell Field, and the San Leandro High School Swim Center, Track and Field Project. Construction of these projects necessitates the displacement of the San Leandro High School (SLHS) sports teams. As directed by the Board of Education, staff researched transportation needs of students during the construction phase. On June 7, 2012, the District conducted a formal sealed bid opening process, per State of California Public Contract Code requirements, for award of a contract for Furnishing Extracurricular Transportation for Groups of Students (Bid No. 13-15) for San Leandro Unified School District. Three (3) bids were received for the furnishing of extracurricular transportation for groups of students displaced by the project. Summary of Three Lowest Responsive Bids Bidder Total Cost Rank First Student $82,694 1 My Coyote Express $109,420 2 El Camino Charter $114,300 3 Based on a check of the required documents of the bid package, the District verified that the bid meets the requirements of Public Contract Code and recommends the lowest responsive, responsible bidder First Student, Inc. to the Board of Trustees.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  74. 21.10 Resolution No. 13-04 Acknowledging the State of California?s Applications Received Beyond Bond Authority Language 📎 1
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Adopt Resolution No. 13-04 Acknowledging the State of California?s Applications Received Beyond Bond Authority Language
    Board Committee
    Facilities & Technology Committee: January 9, 2013
    Background Information
    The Office of Administrative Law approved emergency regulations on November 1, 2012, that will impact how the Office of Public School Construction (OPSC) process applications received after existing State bond authority is no longer available for New Construction and Modernization applications. These regulations establish a State Allocation Board (SAB) acknowledged list for projects that are received by OPSC after State bond authority is exhausted. The new list is called the ?Applications Received Beyond Bond Authority List." Applications placed on this list will only undergo an intake review to ensure all of the required documents have been submitted, but will not be fully processed by the OPSC nor presented to the SAB for approval. All New Construction and Modernization applications received on or after November 1, 2012, will be subject to the new regulations and processing procedures, as approved by the SAB at the September 2012 meeting. Resolution No. 13-04 acknowledges that the State of California is not expected or obligated to provide funding for future funding applications submitted under the school facility program and is required to be adopted by school boards in order to be eligible to submit applications. Essentially, adoption of the resolution will allow our District to submit applications and get in line should funding become available in the future.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Attachments

  75. 22 ACTION ITEMS - 9:20-9:30 p.m.
  76. 22.1 Approval of Action Items
    Quick Summary / Staff Recommendation
    These items are presented for action at this time. Some may have been reviewed at a previous meeting.
  77. 23 General Services
  78. 23.1 Alameda County School Boards Association (ACSBA) Representative Action recorded
    Minutes
    The Board appointed Trustee Prola as the representative to the Alameda County Schools Boards Association (ACSBA) for a one-year term, January 2013-January 2014. Trustee Carey was absent.
    Actions
    Motion - Motion made by Mike Katz-Lacabe and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the appointment of a representative to the Alameda County School Boards Association (ACSBA) for a one-year term, January 2013-January 2014.

    Outcome

    Motion - Motion made by Mike Katz-Lacabe and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason To

  79. 23.2 Alameda County School Boards Association (ACSBA) Alternate Action recorded
    Minutes
    The Board appointed Corina L?pez as the alternate to the Alameda County School Boards Association (ACSBA) for a one-year term, January 2013-January 2014. Trustee Carey was absent.
    Actions
    Motion - Motion made by Mike Katz-Lacabe and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the appointment of an alternate to the Alameda County School Boards Association (ACSBA) for a one-year term, January 2013-January 2014.

    Outcome

    Motion - Motion made by Mike Katz-Lacabe and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jaso

  80. 23.3 Eden Area Regional Program (ROP) Governing Board Representative Action recorded
    Minutes
    The Board appointed Trustee Toro as the representative to the Eden Area Regional Occupational Program (ROP) for a two-year term, January 2013-January 2015. Trustee Carey was absent.
    Actions
    Motion - Motion made by Corina N. Lopez and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the appointment of a representative to the Eden Area Regional Occupational Program (ROP) for a two-year term, January 2013-January 2015.

    Outcome

    Motion - Motion made by Corina N. Lopez and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason

  81. 23.4 Eden Area Regional Program(ROP)Governing Board Alternate Action recorded
    Minutes
    The Board approved the appointment of Trustee Katz-Lacabe as the alternate to the Eden Area Regional Occupational Program (ROP) for a two-year term, January 2013-January 2015. Trustee Carey was absent.
    Actions
    Motion - Motion made by Jason Toro and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the appointment of an alternate to the Eden Area Regional Occupational Program (ROP) Governing Board Alternate for a two-year term, January 2013-January 2015.

    Outcome

    Motion - Motion made by Jason Toro and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .

  82. 23.5 Mid-Alameda County Special Education Local Plan Area (MACSELPA) Representative Action recorded
    Minutes
    The Board appointed Trustee Rosato as the representative to the Mid-Alameda County Special Education Local Plan Area (MACSELPA) for a two-year term, January 2013-January 2015. Trustee Carey was absent.
    Actions
    Motion - Motion made by Lance James and a seconded by Corina N. Lopez. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the appointment of a representative to the Mid-Alameda County Special Education Local Plan Area (MACSELPA) for a two-year term, January 2013-January 2015.

    Outcome

    Motion - Motion made by Lance James and a seconded by Corina N. Lopez. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Tor

  83. 23.6 Mid-Alameda County Special Education Local Plan Area (MACSELPA) Alternate Action recorded
    Minutes
    The Board appointed Trustee James as the alternate to the Mid-Alameda County Special Education Local Plan Area (MACSELPA) for a two-year term, January 2013-January 2015. Trustee Carey was absent.
    Actions
    Motion - Motion made by Vince J. Rosato and a seconded by Jason Toro. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the appointment of an alternate to the Mid-Alameda County Special Education Local Plan Area (MACSELPA) for a two-year term, January 2013-January 2015.

    Outcome

    Motion - Motion made by Vince J. Rosato and a seconded by Jason Toro. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro

  84. 23.7 Drug, Alcohol, Tobacco Education (DATE) Committee Representative Action recorded
    Minutes
    The Board appointed Trustee James as the representative to the Drug, Alcohol, Tobacco Education (DATE) Committee for a one-year term, January 2013-January 2014. Trustee Carey was absent.
    Actions
    Motion - Motion made by Jason Toro and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the appointment of a representative to the Drug, Alcohol, Tobacco Education (DATE) Committee for a one-year term, January 2013-January 2014.

    Outcome

    Motion - Motion made by Jason Toro and a seconded by Vince J. Rosato. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro

  85. 23.8 Drug, Alcohol, Tobacco Education (DATE) Committee Alternate Action recorded
    Minutes
    The Board appointed Trustee Toro as the alternate to the Drug, Alcohol, Tobacco Education (DATE) Committee for a one-year term, January 2013-January 2014. Trustee Carey was absent.
    Actions
    Motion - Motion made by Vince J. Rosato and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the appointment of an alternate to the Drug, Alcohol, Tobacco Education (DATE) Committee for a one-year term, January 2013-January 2014.

    Outcome

    Motion - Motion made by Vince J. Rosato and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Tor

  86. 23.9 San Leandro Disaster Preparedness Council Representative Action recorded
    Minutes
    The Board appointed Trustee Rosato as the representative to the San Leandro Disaster Preparedness Council for a one-year term, January 2013-January 2014. Trustee Carey was absent.
    Actions
    Motion - Motion made by Mike Katz-Lacabe and a seconded by Corina N. Lopez. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the appointment of a representative to the San Leandro Disaster Preparedness Council for a one-year term, January 2013-January 2014.

    Outcome

    Motion - Motion made by Mike Katz-Lacabe and a seconded by Corina N. Lopez. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jaso

  87. 23.10 San Leandro Disaster Preparedness Council Alternate Action recorded
    Minutes
    The Board appointed Trustee Katz-Lacabe as the alternate to the San Leandro Disaster Preparedness Council for a one-year term, January 2013-January 2014. Trustee Carey was absent.
    Actions
    Motion - Motion made by Lance James and a seconded by Jason Toro. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Approve the appointment of an alternate to the San Leandro Disaster Preparedness Council for a one-year term, January 2013-January 2014.

    Outcome

    Motion - Motion made by Lance James and a seconded by Jason Toro. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .

  88. 24 Educational Services
  89. 24.1 Recommendation for Readmission for Expulsion for Student E0-11/12
    To
    Cindy M. Cathey, Superintendent
    Minutes
    This item was pulled at the request of the Superintendent. It will be brought back to the January 29, 2013, Board meeting.
    Quick Summary / Staff Recommendation
    Approve the recommendation from the Director of Student Support Services for readmission from expulsion for student E0-11/12, who has satisfactorily completed the rehabilitation plan and is eligible to return to a comprehensive program.
    From
    Debbie Wong, Assistant Superintendent, Educational Services
  90. 24.2 Recommendation for Expungement of Expulsion for Student E15-09/10
    To
    Cindy M. Cathey, Superintendent
    Minutes
    This item was pulled at the request of the Superintendent. It will be brought back to the January 29, 2013, Board meeting.
    Quick Summary / Staff Recommendation
    Approve the recommendation to expunge the expulsion record for student E15-09/10. Therefore, all records associated with the expulsion will be expunged from the student's school and District record.
    From
    Debbie Wong, Assistant Superintendent for Educational Services
  91. 25 CONFERENCE ITEMS - 9:30-9:40 p.m.
  92. 26 Business and Operations
  93. 26.1 Budget Development Timeline For Fiscal Year 2012-13 Which Includes 2013-2014 and 2014-2015 Action recorded 📎 1
    Fiscal Impact
    Determined as part of the budget development process.
    To
    Cindy M. Cathey, Superintendent
    Minutes
    Assistant Superintendent Song Chin-Bendib explained that the Budget Development Timeline for Fiscal Year 2012-13 which includes 2013-2014, 2014-2015, and 2015-2016 is a working document and typically it ties to the unveiling of the Governor's proposed budget. The document is a work in progress and staff updates it whenever relevant and appropriate information is available, and brings it to the Board as an information item. She drew the Board's attention to the Finance Committee meetings, noting that in light of the lack of clarity and insufficient detail received from the School Services of California (SSC) budget conference today, she is asking that the Board approved the timeline tonight and that it be adjusted as more information becomes available. With that, Trustee Rosato asked that when the meetings are scheduled, ample notice of cancellation be given to our stakeholders. Assistant Superintendent Chin-Bendib said that staff is very mindful of noting changes, informing stakeholders, and posting on the website. Following the discussion, the Board approved the Budget Development Timeline for 2013-2014 Adopted Budget which includes fiscal years 2014-2015, 2015-2016. Trustee Carey was absent.
    Actions
    Motion - Motion made by Vince J. Rosato and a seconded by Mike Katz-Lacabe. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Discuss, review, and approve the Budget Development Timeline for 2013-2014 Adopted Budget which includes fiscal years 2014-2015 and 2015-2016.
    Policy / Code
    California Education Code 42120-42129
    Background Information
    Fiscal turmoil started in 2008-09 at the State level and as a result school districts across the State have experienced severe and devastating budget cuts. Hopefully, with the passage of Proposition 30 in November 2012, there is some fiscal stability for school districts in the next few years. Staff will be attending the School Services of California (SSC) budget conference on January 15, 2013, and will be presenting any and all relevant information to the Board on January 29, 2013. Attached is a draft or working document of the Budget Development Timeline. Every fiscal year, the process commences at the beginning of the calendar year and typically it ties to the unveiling of the Governor?s proposed budget. The document is a work in progress and staff will update it whenever relevant and appropriate information is available. As part of the budget development timeline, districts are required to submit an adopted budget to the Alameda County Office of Education (ACOE) before June 30, 2013. The adopted budget will include fiscal years 2013-2014, 2014-2015, and 2015-2016. The budget development timeline shows the progression of meetings that are needed to finalize the adopted budget, which will occur throughout the 2012-2013 school year. The Board will discuss this timeline and opportunities for the community to stay informed and provide input.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Outcome

    Motion - Motion made by Vince J. Rosato and a seconded by Mike Katz-Lacabe. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jaso

    Attachments

  94. 27 Facilities and Construction
  95. 27.1 Resolution No. 13-06 Submittal of Application(s) for all CalRecycle Grants for which San Leandro Unified School District is Eligible Action recorded 📎 1
    Fiscal Impact
    Grant award could result in up to $150,000 in reimbursed costs for installing the resilient surfacing at all elementary schools, funded through Measure M.
    To
    Cindy M. Cathey, Superintendent
    Minutes
    The Board adopted Resolution No. 13-06 Submittal of Application(s) for all CalRecycle Grants for which San Leandro Unified School District is eligible. Trustee Carey was absent.
    Actions
    Motion - Motion made by Vince J. Rosato and a seconded by Mike Katz-Lacabe. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .
    Quick Summary / Staff Recommendation
    Adopt Resolution No. 13-06 Submittal of Application(s) for all CalRecycle Grants for which San Leandro Unified School District is Eligible.
    Board Committee
    Facilities & Technology: January 9, 2013
    Background Information
    In November 2010, San Leandro voters passed Measure M, a $50.1 million school facilities bond to address modernization and new construction throughout the District, including the renovation of the Pacific Sports Complex and Burrell Field, renovation of the San Leandro High School Swim Center, a new track and field at John Muir Middle School and various other projects at all school sites throughout the District, including renovations and upgrades of all elementary school athletic exteriors (i.e. playgrounds). In order to design facilities that will best serve the needs of our students, schools and the community, the District is aggressively pursuing grant funding opportunities to offset costs and/or enhance scope of work. The State of California Department of Resources Recycling and Recovery (CalRecycle) administers various grant programs, including the Tire-Derived Product Grants, which is a reimbursement grant. Deadline for the 2012 Tire Derived Product Grant was December 11, 2012, with a secondary deadline of January 17, 2013, for online posting of a Board Adopted Resolution authorizing submittal of application(s) to CalRecycle for all grants for which the district is eligible, and empowering the Superintendent or her designee to execute all grant documents necessary to secure grant funds and implement any approved grant project. If awarded, the Tire Derived Product Grant could reimburse the District for up to $150,000 for use of resilient materials manufactured from recycled tires. (In 2007, the City of San Leandro and the District received a recycled tired grant from the California Waste Management Board in the amount of $22,568 for the synthetic track at Bancroft Middle School). Based on its analysis of the data collected for a Report to the Legislature of the State of California, the California Office of Environmental Health Hazard Assessment (OEHHA) concluded artificial turf fields do not pose a serious public health concern, with the possible exception of an increased skin abrasion rate on artificial turf relative to natural turf. Additionally, the materials used are high quality and for children?s playgrounds, pose a safer surface for children. Staff is recommending the adoption of Resolution No. 13-06 Submittal of Application(s) for all CalRecycle Grants for which San Leandro Unified School District is Eligible.
    From
    Song Chin-Bendib, Assistant Superintendent, Business and Operations

    Outcome

    Motion - Motion made by Vince J. Rosato and a seconded by Mike Katz-Lacabe. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jaso

    Attachments

  96. 28 INFORMATION ITEMS - 9:40-9:50 p.m.
  97. 28.1 Information Items
    Quick Summary / Staff Recommendation
    These items are intended to keep the Board informed on various District business matters which do not require action by the Board.
  98. 29 Educational Services
  99. 29.1 Letter of Agreement Between San Leandro Unified School District and Alameda County Office, Gateways East Bay STEM Network, and The Tech Museum for STEM2: The Power of Discovery for our ASES After School Programs 📎 1
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Receive Information on the Collaboration between San Leandro Unified School District and Alameda County Office of Education, Gateways East Bay STEM Network, and The Tech Museum
    Background Information
    STEM2 is part of the California After School Network and California STEM Learning Network. STEM2: The Power of Discovery, is about working collaboratively to provide support and resources necessary to increase quality Science, Technology, Engineering and Mathematics (STEM) learning opportunities. STEM2 works with after school programs to focus on the creation and implementation of a comprehensive multi-year strategic plan that facilitates cross-sector partnerships and increases high quality STEM learning opportunities. As a partner district, there will be a needs and readiness assessment, an action plan drafted from the needs assessment, match with STEM partner resources, guidance on alignment with the regular school day and integration with Common Core State Standards, professional development and evaluation on promising practices, and work towards a sustainability plan for continuing STEM learning opportunities. This letter of agreement is to ensure a commitment by both parties to carry out the vision and mission of STEM2 for all 8 ASES school sites.
    From
    Debbie Wong, Assistant Superintendent, Educational Services

    Attachments

  100. 29.2 Williams Uniform Complaint Procedures (including Valenzuela Settlement Requirement) Quarterly Report:October-December 2012 📎 1
    To
    Cindy M. Cathey, Superintendent
    Quick Summary / Staff Recommendation
    Williams Uniform Complaint Procedures (including Valenzuela Settlement Requirement) Quarterly Report:October-December 2012
    Policy / Code
    California Education Code Section 35186
    Background Information
    The regulations of the Williams lawsuit settlement require school districts to complete ?Quarterly Complaint? reports that document the number of complaints for textbooks and instructional materials, teacher vacancies and misassignments, and facilities conditions. Additionally, effective January 2008, as a result of settlement with the California State Department of Education, districts are required to implement the Valenzuela Settlement Legislation (Assembly Bill 347). This legislation requires that districts offer services for two consecutive years following grade twelve to students who did not pass the CAHSEE by the end of their 12th grade. Additionally, the legislation requires that students and families have the opportunity to file a complaint against the District for not fulfilling this requirement. Notification regarding the complaint process is integrated into the Williams Complaint form which is posted in every secondary classroom as required. For the period October-December 2012, the District did not have any complaints.
    From
    Debbie Wong, Assistant Superintendent, Educational Services

    Attachments

  101. 30 Business and Operations
  102. 30.1 Miscellaneous Receipts
    Minutes
    Miscellaneous Receipts in the amount of $21,881,684.02 have been deposited in the Treasury of Alameda County.
    Quick Summary / Staff Recommendation
    Miscellaneous Receipts in the amount of $21,881,684.02.
  103. 31 ADDITIONAL SUGGESTIONS AND COMMENTS FROM BOARD MEMBERS-9:50 p.m.
    Minutes
    Trustee Toro appreciated that the high school students are concerned about safety at the school sites. He asked and received consensus for the Board and District staff review of the District's emergency procedures, and that the information be vetted by the San Leandro Police Department. Trustee Rosato met with Castro Valley Unified School Board President John Barbieri, who encouraged our Board members to attend the next Alameda Schools Board Association meeting this Thursday, 7 p.m. at the Alameda County Office of Education. Trustee Rosato also announced that there are still openings for judges for the Dr. Martin Luther King, Jr. Forensics Tournament being held at James Logan High in Union city. He will pass on the information to the Superintendent. Trustee L?pez thanked and concurred with Trustee Toro that staff should review the District safety standards. She attended, on behalf of the Board, the San Leandro YMCA Youth & Government's Bill Hearing Night on January 3, where a number of students from San Leandro High School participated in a mock bill hearing, adding that many community leaders, school officials and former trustees were in attendance. Trustee L?pez also attended (along with Trustees Prola and Katz-Lacabe) the City Council meeting on Monday and is looking forward to continued conversations and information regarding Burrell Field and Pacific Sports Complex. Trustee Katz-Lacabe commented that while the birth rate is declining in various areas of San Leandro by two to three percent, the population for that same 10-year period increased by seven percent, suggesting that the District look at what the impact, if any, has on some of the assumptions we are making with regards to enrollment at the schools. He would like to see the Finance Committee meet soon and make recommendations for restorations of some of cuts made by the Board, in light of the passage of Proposition 30 and Measure L. He also expressed how grateful he was to Assemblymember Rob Bonta for his first piece of legislation clarifying the language regarding parcel taxes. Trustee James, responding to Trustee Katz-Lacabe's regarding the Finance Committee meeting soon to consider restoration of cuts, felt that when clarifying information is received from the state, (which is expected in about two weeks) that would be the time for the Finance Committee to schedule a meeting. He also shared that his wife accompanied the San Leandro High School Ski Team for a one-day trip to Kirkwood. Trustee Prola announced the following the 2012-2013 Board Committee assignments: Communication/Advocacy/City-District Liaison (which is currently not meeting) Mike Katz-Lacabe, Chair Vince J. Rosato Lance James Ron Carey, Alternate Curriculum/Policy Ron Carey, Chair Vince J. Rosato Diana Prola Corina L?pez, Alternate Finance Lance James, Chair Jason Toro Corina L?pez Ron Carey, Alternate Facilities/Technology Diana Prola, Chair Mike Katz-Lacabe Jason Toro It was noted that currently there is not an alternate to the Facilities/Technology Committee. Trustee Prola welcomed the new Board members. She attended the Annual Boys and Girls Club Crab Feed on January 12, 2013. She also acknowledged Assemblymember Rob Bonta for introducing AB 59, clarifying the language of uniformity and the effects on parcel taxes. Trustee Prola asked and received consensus to adjourn the meeting in memory of the children and adults who lost their lives at the Sandy Hood Elementary School tragedy, San Leandro High School student Tyronta Mickens, and Joe Collier, husband of former Board member Esther Holcomb, who was a dedicated and long-time supporter of San Leandro Schools and our sports programs.
  104. 32 ANNOUNCEMENT
  105. 32.1 Board of Education Meetings
    Minutes
    Regular Board Meeting - January 29, 2013 Regular Board Meeting - February 5, 2013 Tentative Board Meeting/Work Session - February 12, 2013 (District Office) Regular Board Meeting - February 26, 2013 Regular Board Meeting - March 5, 2013 Special Board Meeting - March 12, 2013 (District Office) Regular Board Meeting - March 19, 2013 Regular Board Meeting - April 2, 2013 Regular Board Meeting - April 16, 2013 Regular Board Meeting - May 7, 2013 Tentative Board Meeting/Work Session - May 14, 2013 (District Office) Regular Board Meeting - May 21, 2013 Regular Board Meeting - June 4, 2013 Regular Board Meeting - June 18, 2013 Special Board Meeting - June 25, 2013 (District Office)
    Quick Summary / Staff Recommendation
    Regular Board Meeting - January 29, 2013 Regular Board Meeting - February 5, 2013 Tentative Board Meeting/Work Session - February 12, 2013 (District Office) Regular Board Meeting - February 26, 2013 Regular Board Meeting - March 5, 2013 Special Board Meeting - March 12, 2013 (District Office) Regular Board Meeting - March 19, 2013 Regular Board Meeting - April 2, 2013 Regular Board Meeting - April 16, 2013 Regular Board Meeting - May 7, 2013 Tentative Board Meeting/Work Session - May 14, 2013 (District Office) Regular Board Meeting - May 21, 2013 Regular Board Meeting - June 4, 2013 Regular Board Meeting - June 18, 2013 Special Board Meeting - June 25, 2013 (District Office)
  106. 33 ADJOURNMENT*
  107. 33.1 Time Action recorded
    Minutes
    The meeting was adjourned at 9:05 p.m. Trustee Carey was absent.
    Actions
    Motion - Motion made by Mike Katz-Lacabe and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason Toro .

    Outcome

    Motion - Motion made by Mike Katz-Lacabe and a seconded by Lance James. | Vote: Yes Lance James .; Yes Diana Prola .; Yes Mike Katz-Lacabe .; Yes Corina N. Lopez .; Yes Vince J. Rosato .; Yes Jason To

Contracts and agreements on this agenda 20

Extracted automatically from the agenda items and attachments; amounts appear only when printed in the documents.

ItemVendor / partyDescriptionAmount
2.5 Real Property NegotiatorProperty: 13666 E. 14th Street, San Leandro, California Agency Negotiator: Cindy Cathey, Superintendent; Song Chin-Bendib, Assistant Superintendent Business and Operations; C. John Dominguez, School Site Solutions,...—
4.1 San Leandro High School Annual SeasonSan Leandro High School is proud to share their award winning community service learning activities and projects during the Season of Service, Period of Peace from the end of January through Cesar Chavez Day March...—
11.1 Harris and AssociatesGoal #5: Ensure Safe and Well Maintained Facilities Assistant Superintendent of Business and Operations, Song Chin-Bendib; John Dominguez, Interim Director of Bond Projects; Kurt Weidmann, Consultant with Harris and...—
19.2 Hatchuel, Tabernik & Associates, IncApprove the Contracted Services Agreement Between San Leandro Unified School District and Hatchuel, Tabernik & Associates, Inc. (HTA) for Development of the Planning Process and Facilitation for Full Service...$19,388
19.3 —Approve non-public school/agency contracts as listed above for the 2012-2013 school year.$35,638.00
19.3 Seneca Family of AgenciesApprove non-public school/agency contracts as listed above for the 2012-2013 school year.—
20.4 ExtensionApprove extension of the contract for Network Administrator, James Foster, to assist the District in administering and managing its data network through March 31, 2013.$9,600
20.5 Finishing TouchesApprove the contact with Finishing Touches to repair the San Leandro High School Library tables$5,300
20.6 Marilyn ThirionOffice support for the Business Academy at San Leandro High School$2,000 ($20/hr)
20.6 Clap Yo Hands Sound and VideoDJ Services for Winter Ball at San Leandro High School$400 (flat fee)
20.6 Public EconomicsRedevelopment agency consulting services(Not to exceed) $1,500
21.1 RenewApprove renewal of contract with School Site Solutions, Inc. to provide support for bond projects.$132,000 per year plus reimb
21.2 DLM, IncApprove Amendment #1, to the Architectural Services Agreement with DLM, Inc., in the amount of $22,904, to provide Athletic Oriented Site Improvements at Seven (7) Elementary School Sites.$22,904
21.3 FinalApprove Final Change Order #3 to the Construction Contract, in the amount of $44,687, with Trinet Construction, Inc. for the Lincoln High School renovations, upgrades, site athletic improvements, portable large...$44,687
21.5 F&H ConstructionApprove Change Order #2 to the Construction Contract with F&H Construction in the amount of $20,249 with F&H Construction for the San Leandro High School Swim Center, Fields, Grading and Drainage Projects.$20,249
21.6 Maggiora BrosApprove the Construction Services Agreement, in the amount of $224,075, with Maggiora Bros. Drilling, Inc. for Irrigation Well Construction at San Leandro High School.$224,075
21.7 American Modular Systems, IncApprove the Agreement in the amount of $1,198,640 with American Modular Systems, Inc. for the Fabrication and Installation of a seven modular classrooms at Washington Elementary School.$1,198,640
21.8 NEMA ConstructionApprove the Construction Contract, in the amount of $89,000, with NEMA Construction for Backup Generator Project at Madison Elementary School.$89,000
21.9 First Student, IncApprove the Transportation Contract with First Student, Inc. for the Extracurricular Transportation for SLHS Sports Teams Displaced by the SLUSD Pacific Sports Complex & Burrell Field and the SLHS Swim Center, Track...$82,694
29.1 LetterReceive Information on the Collaboration between San Leandro Unified School District and Alameda County Office of Education, Gateways East Bay STEM Network, and The Tech Museum—

Document

Open in new tab