San Leandro Unified School DistrictTradition and Innovation

Regular

Regular Board Meeting

· 7:00 PM

South Office Conference Room · 835 E. 14th Street · San Leandro, CA 94577 · · Closed Session - 6:00 pm · Open Session - 7:00 pm

Agenda 83 items

  1. A CALL TO ORDER - 6:00 P.M.
    Minutes
    The Board meeting was called to order at 6:00pm
  2. B PUBLIC TESTIMONY - CLOSED SESSION ITEMS
  3. C RECESS INTO CLOSED SESSION - 6:00 P.M.
    Minutes
    The Board recessed into Closed Session at 6pm
  4. C.1 Student Expulsions; EC 35146 and 48918(c)
  5. C.2 Public Employee Discipline/Dismissal/Release/Hiring; GC 54957
  6. C.3 Conference with Legal Negotiator (Government Code Section 54957.6) Employee organizations: SLTA. CSEA, T/T, Unrepresented Groups, Designated Representative: John Thompson
  7. D RECONVENE TO OPEN SESSION - 7:00 P.M.
    Minutes
    The Board reconvened to Open Session at 7pm.
  8. D.1 Report on Closed Session Action
    Minutes
    There were no items to report for Closed Session.
  9. D.2 Pledge of Allegiance
    Minutes
    President Rosato led the audience in the pledge of allegiance.
  10. D.3 Approval of Agenda Passed
    Minutes
    A motion was made to approve the Agenda.
    Actions
    Motion Passed with a motion by Lance James and a second by Monique Tate. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .

    Outcome

    Motion Passed

  11. E LEGAL STATEMENT
    Quick Summary / Abstract
    Members of the audience who wish to address the Board are asked to complete the yellow card available at the entrance and submit it to the Board's Administrative Assistant. Speakers who have completed the card will be called when the item is reached on the agenda or, for non-agenda items, during the Public Testimony. Cards are to be turned in before the item is reached on the agenda. Please note that the meeting is being recorded. State law prohibits the Board of Education from taking any action on or discussing items that are not on the posted agenda except to A) briefly respond to statements made or questions posed by the public in attendance; B) ask questions for clarification; C) provide a reference to a staff member or other resource for factual information in response to the inquiry; or D) ask a staff member to report back on the matter at the next meeting and/or put it on a future agenda. (Government Code 54954.2(a)).
  12. F PUBLIC TESTIMONY ON NON-AGENDA ITEMS
    Minutes
    President Rosato allowed a speakers for both agenda and non-agenda items to speak at this time since there were only two speaker cards submitted Mark Hamilton, came to speak on behalf of SLTA. He spoke on school/campus safety concerns. The high school teachers feel that there are not enough campus supervisors present. Also, SLTA reps meet with the administration at the high school weekly to discuss safety concerns. Topics of concern included a sewage smell near the science classes at the high school on the ground floor; Round up weed killer being sprayed during class time. Ruby Smart, a high school teacher, discussed item K.4.h - regarding approval of several new AP courses. She made herself available to answer any questions the Board may have regarding these courses. She looks forward to continued work with this process and will continue to help support these courses as needed.
  13. G REPORTS
    Minutes
    A Board Trustee read the correspondence report in the Board Clerk's absence. The Student Board Member, Board Trustees and Cabinet Members all briefly summarized reports and events in their corresponding positions.
  14. G.1 Correspondence
    Minutes
    Trustee James read the correspondence reports in the Trustee Sheridan's absence.
  15. G.2 Student Board Member Report
    Minutes
    Student Board Member Mason Medeiros stated that the senior class held their annual Winter Ball which was a great success. The school talent show coming up. The seniors are proposing to have a time capsule this year, pending approval. Underclassmen are choosing classes for the next school year.
  16. G.3 Union Representative Reports
    Minutes
    There were no union representatives reports for this meeting.
  17. G.4 Cabinet Reports
    Minutes
    All Cabinet members gave brief updates of recent events in their respective departments.
  18. G.4.a Superintendent
  19. G.4.b Deputy Superintendent, Educational Services
  20. G.4.c Assistant Superintendent, Human Resources
  21. G.4.d Assistant Superintendent, Business & Operations
  22. H BOARD COMMITTEE REPORTS
    Minutes
    All Board Trustees addressed events and updates in their respective committee positions.
  23. H.1 Communication/Advocacy
  24. H.2 Curriculum/Policy
  25. H.3 Facilities & Technology
  26. H.4 Finance
  27. H.5 Drug, Alcohol, Tobacco Education (DATE)
  28. I BOARD REPRESENTATIVE REPORTS
    Minutes
    All Board Trustees presented reports reflecting the various associations and programs they support.
  29. I.1 Alameda County School Boards Association
  30. I.2 Eden Area Regional Occupational Program
  31. I.3 Mid-Alameda County Sp. Ed. Local Plan Area
  32. I.4 City Disaster Preparedness Council
  33. J CONSENT AGENDA Passed
    Minutes
    Item J.1.a was pulled and moved before the consent agenda to be read as a proclamation. Items J.4.c., J.4.d., an J.4.e. - were voted on as action items. Motions are included in each agenda item.
    Actions
    Motion Passed with a motion by Evelyn Gonzalez and a second by Lance James. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Quick Summary / Abstract
    These items are considered routine and may be enacted by a single motion. At the request of any member of the Board, any item on the Consent Agenda shall be removed and given individual consideration for action as a regular agenda item.

    Outcome

    Motion Passed

  34. J.1 General Services Passed
  35. J.1.a Teen Dating Violence Awareness & Prevention Month Proclamation Passed 📎 1
    Rationale
    Proclamation from the City of San Leandro for Teen Dating & Awareness month
    Minutes
    Board President Rosato had all members of the audience present for the Teen Dating Violence and Awareness group stand and gather in the front of the conference room while he recited the proclamation from item J.1.a.

    Outcome

    Motion Passed (as part of consent agenda J)

    Attachments

  36. J.1.b Resolution 16-08 Read Across America Passed 📎 1
    Rationale
    Adopt Resolution 16-08 for National Education Association's (NEA) Read Across America Day. This commemorates Dr. Seuss's birthday and the importance of reading amongst all students in our schools.

    Outcome

    Motion Passed (as part of consent agenda J)

    Attachments

  37. J.1.c Resolution 16-09 Proclaiming Art is Education Month Passed 📎 1

    Recommended motion

    Adopt Resolution 16-09 Art is Education Month for March

    Rationale
    March 2016, marks the 16th Year Anniversary of Art IS Education, a month-long celebration of student achievement through the arts and arts integrated curriculum. The District has had a long-standing relationship with the Art IS Education Program with Alameda County Office of Education (ACOE). The website www.artiseducation.org has more information about the events and activities planned for the Art IS Education 16th Year Anniversary Celebration. This year’s theme is "Creating Solutions!", which is an invitation for students to tell their story about the role creativity plays in their lives to connect, inspire and make positive change in their community. Resolution No. 16-09 formally declares the month of March “Art IS Education Month.

    Outcome

    Motion Passed (as part of consent agenda J)

    Attachments

  38. J.2 Business & Operations Passed
  39. J.2.a Ratify January 2016 Payroll Passed
    Rationale
    Ratify January 2016 Payroll $5,708,884.66

    Outcome

    Motion Passed (as part of consent agenda J)

  40. J.2.b Approval of Receipts Passed
    Rationale
    Approval January Receipts in the amount of $16,169,851.54

    Outcome

    Motion Passed (as part of consent agenda J)

  41. J.2.c Approval of Bill Warrants Passed 📎 1
    Rationale
    January 2016 Bill Warrants #88-50666536- 88-50669502 in the amount of $2,626,554.67

    Outcome

    Motion Passed (as part of consent agenda J)

    Attachments

  42. J.3 Human Resources Passed
  43. J.3.a Updated Hourly and Daily Rate Schedule Passed 📎 1
    Rationale
    Staff has updated the Hourly and Daily Rate Schedule to reflect SLUSD Board of Education approved increases to these rates.

    Outcome

    Motion Passed (as part of consent agenda J)

    Attachments

  44. J.3.b Classified Personnel Report Passed 📎 1

    Outcome

    Motion Passed (as part of consent agenda J)

    Attachments

  45. J.3.c Certificated Personnel Report Passed 📎 1

    Outcome

    Motion Passed (as part of consent agenda J)

    Attachments

  46. J.4 Educational Services Passed
  47. J.4.a Contracts for Amounts $5,000 or less for Fiscal Year 2015-2016 Passed 📎 1

    Outcome

    Motion Passed (as part of consent agenda J)

    Attachments

  48. J.4.b Discard Electronic Equipment from Bancroft Middle School Passed 📎 1
    Rationale
    Bancroft Middle School is requesting approval to discard electronic equipment.

    Outcome

    Motion Passed (as part of consent agenda J)

    Attachments

  49. J.4.c Recommendation for Readmission from Expulsion E15 - 14/15 Passed
    Actions
    Motion Passed with a motion by Lance James and a second by Evelyn Gonzalez. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .

    Outcome

    Motion Passed

  50. J.4.d Recommendation for readmission from Expulsion - E06-14/15 Passed
    Actions
    Motion Passed with a motion by Diana Prola and a second by Lance James. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .

    Outcome

    Motion Passed

  51. J.4.e Recommendation for readmission from Expulsion E13-14/15 Passed
    Actions
    Motion Passed with a motion by Lance James and a second by Monique Tate. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .

    Outcome

    Motion Passed

  52. J.4.f Memorandum of Understanding Between San Leandro Unified School District (SLUSD) and Davis Street Family Resource Center (DSFRC) Passed 📎 1

    Recommended motion

    Staff recommends approval of the memorandum of understanding.

    Rationale
    This Memorandum of Understanding (MOU) is between the San Leandro Unified School District (SLUSD) and the Davis Street Family Resource Center (DSFRC) for the purpose of providing mental health services for SLUSD students during the 2015-2016 school year. Services will be provided at the following sites: San Leandro High School Including FTK, McKinley Elementary, Monroe Elementary, and Washington Elementary.
    Financial Impact
    $20,000 for the 2015-2016 of supplemental and concentration grant monies

    Outcome

    Motion Passed (as part of consent agenda J)

    Attachments

  53. J.4.g Agreement between AVID College Readiness System Services and Products and the San Leandro Unified School District for the period July 1, 2016 to June 30, 2017 Passed 📎 3

    Recommended motion

    Staff recommends approval of Agreement between AVID College Readiness System Services and Products and the San Leandro Unified School District for the period July 1, 2016 to June 30, 2017.

    Rationale
    AVID, Advancement Via Individual Determination, is a global nonprofit organization dedicated to closing the achievement gap by preparing all students for college postsecondary opportunities. AVID trains educators to use proven practices in order to prepare students for success in high school, college, and a career, especially students traditionally underrepresented in higher education. San Leandro Unified School District implements AVID at the secondary school sites and Jefferson Elementary in order to foster college going culture and the necessary instructional support for English Language Learners and low income pupils.
    Financial Impact
    $19,112 Supplemental and Concentration Monies/Title I/Site Discretionary

    Outcome

    Motion Passed (as part of consent agenda J)

    Attachments

  54. K ACTION/DISCUSSION ITEMS
  55. K.1 General Services
  56. K.1.a Inclusion of Adult Education Average Daily Attendance in School Board Remuneration Passed
    Rationale
    California Education Code Section 35120 sets forth compensation guidelines for members of the governing board of K-12 school districts according to the average daily attendance (“ADA”) of the students within the District. The Board shall consider the inclusion of the average daily attendance of adults in the District’s adult education classes in the overall ADA numbers for the District for the purposes of Board member compensation, consistent with SLUSD Board Policy 9250, for the reasons set forth below. The California State Legislature has established the legal responsibility and burdens school districts have for maintaining adult education programs in Education Code Section 8530, which states: “Adult basic education is the responsibility of high school and unified school districts except in those instances where by mutual agreement the responsibility is assigned to a community college district." The District’s Board of Education has itself recognized this responsibility and burden in Board Policy 6200, by noting that “education is a lifelong process and that it is important for individuals to continuously develop new skills," by approving all courses to be offered in the adult education program, and by assigning the Superintendent or designee with the task of developing and overseeing the district's adult education program. The District’s Board of Education has established classes for adults and such classes have resulted in an ADA of 100 or more, thereby requiring the District to establish an adult school for the administration of the program pursuant to Education Code Section 52502. In maintaining an adult education program, the District’s Board of Education is further required to adhere to the Brown Act, create and maintain multiple additional functions, including budget controls and audits, public hearings regarding proposed budgets, certain prescribed courses and education programs, enforcement of courses of study and uses of text books, and preparation of courses for adult schools pursuant to Education Code Section 52501.3. Adult attendance in classes for adults may be included in high school district ADA for the purposes of computation of allowances and apportionments from the State School Fund pursuant to Education Code Section 41608.
    Actions
    Motion Passed with a motion by Lance James and a second by Monique Tate. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Financial Impact
    Approval of this item will set SLUSD Board of Education stipends at $400 per month.

    Outcome

    Motion Passed

  57. K.1.b SLUSD Board Policy Updates Passed 📎 2

    Recommended motion

    Approve revisions to board policies.

    Rationale
    A service provided by the California School Boards Association is to provide school districts with recommended updates to school board policies. When the district receives these recommendations, they are reviewed by staff, sent to the SLUSD Policy Committee for review, and then sent to the Board of Education at a regular meeting for approval. The following policies have been revised, vetted by staff, reviewed by the SLUSD Policy Committee, and are being submitted for board approval: AR 3311 Business & Non Instructional Operations/BIDS BP 4030 Nondiscrimination in Employment AR 4112.23 Special Education Staff AR 4119.11 Sexual Harassment AR 4219.11 Sexual Harassment AR 4319.11 Sexual Harassment BP 4121 Temporary/Substitute Personnel AR 4261.1 Personal Illness/Injury Leave AR 6142.1 Sexual Health & HIV/AIDS Prevention Instruction BP 6146.1 High School Graduation Requirements BP 6152.1 Placement in Math Courses BP 6173 Education for Homeless Children BP 6142.1 Sexual Health & HIV/AIDS Prevention Instruction BP 6190 Evaluation of the Instructional Program BP 6179 Supplemental Instruction AR 5112.2 Exclusions from Instruction AR 5112.2 Exclusions from Attendance BP 5141.31 Immunizations AR 5141.31 Immunizations AR 6173 Education for Homeless Children AR 6173.1 Education for Foster Youth BP 5111.1 District Residency AR 5111.1 District Residency BP 5141 Health Care & Emergencies
    Minutes
    Dr. Thompson noted that a page of the policy updates for Board Policy 4030 was unintentionally left out of the attachments submitted to the agenda. He stated that the missing page was brought to this meeting for distribution and to consider this for approval.
    Actions
    Motion Passed with a motion by Diana Prola and a second by Evelyn Gonzalez. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .

    Outcome

    Motion Passed

    Attachments

  58. K.2 Business & Operations
  59. K.2.a Facilities Rental at SLUSD Owned Parcel of Land at the end of Cary Drive (APN 077- 0470-001-03) Passed 📎 1

    Recommended motion

    Approve request for temporary license for use of portion of land- End of Cary Drive, San Leandro, Ca.; County of Alameda, State of California (APN 077-0470-001-03); PG&E Job Number: PM30969553

    Rationale
    PG&E is requesting permission for its temporary use of a portion of district owned land at the end of Cary Drive for the purpose of storing construction materials and equipment and parking vehicles in connection with its gas distribution pipeline replacement project for a period of ten months, commencing on January 19, 2016, and terminating November 19, 2016. PG&E shall pay the district one thousand dollars and no cents ($1,000.00) per month as compensation for the temporary license, due and payable within thirty (30) days of the acceptance of the Letter Agreement. Equipment storage will include backhoe and dump truck, material storage will include sand, rock, waddles, DI bags, pipe, pipe supports, and a spoils pile for off haul. PG&E is required under State and local law to re-stabilize any disturbed project location in order to control soil erosion and sediment runoff, in accordance with applicable project permits.
    Actions
    Motion Approve request for temporary license for use of portion of land- End of Cary Drive, San Leandro, Ca.; County of Alameda, State of California (APN 077-0470-001-03); PG&E Job Number: PM30969553 Passed with a motion by Lance James and a second by Evelyn Gonzalez. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Financial Impact
    N/A

    Outcome

    Motion Passed

    Attachments

  60. K.2.b Amendment No. 3 to the Harris & Associates Contract for Additional Program Management Services on 2016 Measure M Bond Projects Passed 📎 1
    Rationale
    As part of the Measure M implementation processes, the District conducted a SOQ/RFQ/RFP qualification based selection process for Program Management (PM) firms. Harris & Associates received the highest overall ranking and was selected to manage the Measure M program. The Board of Education previously approved Harris & Associates (H&A), through a Request for Qualifications (RFQ) process, to provide Program, Project and Construction Management on selected projects as identified through the local Measure M Bond. The original Agreement for Program Management Services was entered into on February 1, 2011, between Harris & Associates and San Leandro Unified School District to provide Measure M Program Management Services for the Measure M Bond Program, in the amount of $2,060,000, with a program completion date of December 31, 2014. Amendment (No.1) that extended the contract completion date from 12/31/14 to 9/30/15. Amendment (No.2) that extended the contract completion date from 9/30/15 to 12/31/15. Due to DSA requested changes on the fencing structural details, the extended DSA review time, and the added ramp review times on the fencing projects, it is now necessary to extend the scheduled completion of the Measure M Bond program from December 31, 2015 to March 31, 2016, so that these important projects can be completed. This Amendment No.3 will extend the contract completion date 3/31/16 and have Harris & Associates continue to provide required Program, Project and Construction Management consulting Services and for the following Measure M Bond Program, as denoted below. Measure M Bond Five (5) Elementary School sites – Fencing project - (PGM/PM/CM) Two (2) new ADA concrete ramps at Wilson ES and Washington ES - (PGM/PM/CM) Muir MS – Air Conditioning project – (PGM/PM/CM) Fiscal year 2014/2015 Financial Closeout support thru 3/31/16 – Program wide DSA Closeout and Certification management and support thru 3/31/16 – Program wide Contract Summary Item Description Item Amount Running Contract Amount Running % Increase Agreement Measure M Program Management Services $2,060,000 $2,060,000 0 Amend. #1 Time Extension of nine (9) months due to Revised & Added Scopes $219,939 $2,279,939 10.67 Amend. #2 Time Extension of three (3) months due to Revised & Added Scopes $126,976 $2,406,915 16.84 Amend. #3 Time Extension of three (3) months due DSA delay $69,000 $2,475,915 20.19 Harris & Associates has provided skilled technical and professional services on the management of the District’s bond program. Please note that since the start of the contract, the contract duration has been extended by over 31%, but the fee has only been increased 20% to cover that additional time and services. This item was reviewed by the Facility & Technology Committee on February 3, 2016.
    Actions
    Motion Passed with a motion by Evelyn Gonzalez and a second by Lance James. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Financial Impact
    The costs of the approved projects are funded by Measure M 2010 General Obligation Bonds

    Outcome

    Motion Passed

    Attachments

  61. K.2.c Amendment No. 13 to the Jeff Wong Architect Adult School Modular Classroom Project for Fencing & Ramp Projects at Eight School Sites Passed 📎 2
    Rationale
    The Board of Education previously approved Jeffery E. Wong Architects to provide architectural design services for the John Muir Middle School Renovation and Upgrade Project on April 1, 2008. The scope of the original contract includes restroom renovations, interior classroom light fixture replacements, interior classroom painting, roofing replacement, and heating upgrades. Subsequently the Board approved: • Amendment No. 1 in the amount of $34,100 on December 1, 2009 • Amendment No. 2 in the amount of $5,720 on January 26, 2010 • Amendment No. 3 in the amount of $1,650 on May 18, 2010 • Amendment No. 4 in the amount of $50,520 on June 21, 2011 • Amendment No. 5 in the amount of $20,000 on November 1, 2011 • Amendment No. 6 in the amount of $5,500 on April 3, 2012 • Amendment No. 7 in the amount of $48,000 on April 9, 2013 • Amendment No. 8 in the amount of $6,300 on August 13, 2013 • Amendment No. 9 in the amount of $107,000 on April 1, 2014 • Amendment No. 10 in the amount of $7,000 on July 22, 2014 • Amendment No. 11 in the amount of $12,500 on January 13, 2015 • Amendment No. 12 in the amount of $83,000 on April 22, 2015 This Amendment No. 13, in the amount of $84,606, is to provide additional architectural and structural design services as required to develop structural plans for two (2) new ADA ramps and to provide structural design calculations, drawings, specification and details for increased fence heights, wrought iron fences. This also covers the additional meetings with DSA, the additional details and structural calculations and backcheck comments responses. Detail of Additional DSA Reviews of the Security Fencing and ADA Ramp Project Timeline & Activities This list of activities is a summary of major activities, but does not include all activities. As requested, it is being provided to illustrate the increased level of effort due DSA requests and timeliness of activities during the period. Although, there was not a lot construction work on the school sites, there was significant effort and activities behind the scenes with DSA. Although DSA agreed to fast track their review and perform over the counter, which is typically what is expected for a fencing project and exterior ramps, they did not perform the review over the counter. The team was able to shorten DSA bin time, but DSA refused to expedite their review and correlate their review time to the appropriate level of review and oversight for the limited nature and life safety risk actually posed by these improvements. 10/5/2015 - District and Program Manager met with DSA to discuss expediting the review process of 5 remaining fence projects - DSA was to review request and discuss with DSA management to approve expedited review 10/28/2015 -DSA approved expedited review period for fencing project 10/29/15 – Architect submitted revised preliminary structural security fence drawings to DSA for review 11/3/15 – DSA requested additional cut sheets and structural detail from fencing manufacturer 11/6/2015 – Architect met with DSA structural engineer to review requirements for ADA ramp; DSA gave a list of calculations to provide Meeting with Structural Engineer to discuss SE DSA’s request and to strategize on how to expedite the DSA structural review process District and Program Manager conducted bid walks with GC’s for the 5 fencing projects 11/10/2015 -Structural Engineer assigned a designated engineer to begin performing the additional structural calculations requested by DSA 11/21/15 – DSA requested a letter from the District asking for signage for accessibility at Washington, Harris provide letter for DSA review 11/26/2015 – 11/27/2015 Thanksgiving 12/3/2015 – District and Program Manager opened bids from fencing contractors 12/7/2015 – Filled out DSA form 153 for inspection cards also filled out DSA form 102 & submitted 12/8/2015 – SLUSD Board approved fencing contractor recommendation 12/9/2015 – Issued Notice of Award to fencing contractors 12/11/2015 – Architect submitted DSA forms 153, 102 to DSA for review 12/14/2015 – Submitted DSA form 5 PI for review and approval 12/18/2015 – DSA sent the approval letters for remaining 5 projects from DSA District and Program Manager -Received Job cards from DSA 12/22/2015 – Contractors given NTP for demo at respective schools 12/25/2015 – Christmas Day 12/28/2015 – DSA form 103s uploaded to Box (revealed many new inspections not required in previous fence projects) 1/1/2015 – New Year Day 1/6/2016 – Received submittal approval from SE (SE office closed for 2weeks during holiday break) 1/13/2015 – DSA approval of special inspectors per DSA 103 (Geotech, Special steel inspector, concrete inspector) 1/15/2015 – Special inspectors begin work on 103 inspections. Contract Summary Amend No. Description Amendment Amount Contract Running Total 0 Original contract Adult School Modular n/a $651,000 1 Structural engineering for rooftop units $34,100 $685,100 2 Additional Mechanical /Electrical engineering $5,720 $690,820 3 Structural engineering for closet seismic anchoring $1,650 $692,470 4 Increased ADA access, post & beam, activity rm. $50,520 $742,990 5 Add shops to Painting & Lighting project $20,000 $762,990 6 Remove worn out & failed seating, new flooring $5,500 $768,490 7 Additional Architectural Services for the John Muir Renovation Project: John Muir Adult Modular Classroom and associated site work $48,000 $816,490 8 Additional Architectural Services for the San Leandro Adult School Phase $6,300 $822,790 Modular Classroom and associated site work 9 Voluntary Seismic Upgrade design and construction administration services for Madison Elementary School, the IMC Building, the District Maintenance and Operations Building, The Admin/Shop Building and Warehouse Building, and the San Leandro Adult School Admin. Building on Bancroft Avenue $107,000 $929,790 10 Voluntary Seismic Upgrade design and construction administration services for John Muir Adult Modular Classroom mechanical, electrical and plumbing design and additional construction administration services to renovate the existing facilities restrooms to meet City required ADA compliance $7,000 $936,790 11 Voluntary Seismic Upgrade design and construction administration services for the San Leandro Adult School Administration Building and Storage Building: demolition plans, electrical renovation and new fencing $12,500 $949,290 12 Design services as required to develop plans for security fencing and other school district issues of ADA concerns requiring additional design and consultation by the City of San Leandro. These designs will also require administrative services for Processing through DSA. $83,000 1,032,290 13 Additional design services: Architectural & structural design of two (2) new ADA ramps, structural engineering design & calculations for increasing the heights of fences and increasing the size of the foundations, changing to wrought iron. Additional structural DSA review meetings and resulting delays die to DSA. $84,606 $1,116,896
    Actions
    Motion Passed with a motion by Lance James and a second by Diana Prola. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Financial Impact
    The costs of the approved projects are funded by Measure M 2010 General Obligation Bonds.

    Outcome

    Motion Passed

    Attachments

  62. K.3 Human Resources
  63. K.3.a Memorandum of Understanding with SLED for a Community Engagement Program Passed 📎 1

    Recommended motion

    Approve the memorandum of understanding with SLED.

    Speaker
    John Thompson, Ed.D.
    Rationale
    The San Leandro Education Foundation (SLED) has a focus area on volunteerism and wants to work with the San Leandro Unified School District (SLUSD) to assist in the recruitment, management and acknowledgement of volunteers in our schools. The purpose of this memorandum of understanding (MOU) is to define the roles and relationship between SLED and the SLUSD to implement a community based volunteer program for schools.
    Actions
    Motion Approve the memorandum of understanding with SLED. Passed with a motion by Lance James and a second by Monique Tate. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Financial Impact
    There is no fiscal impact.

    Outcome

    Motion Passed

    Attachments

  64. K.4 Educational Services
  65. K.4.a Approve Contract for Edventure More for Monroe Elementary Passed 📎 1
    Rationale
    Provide 3 weekly after school enrichment programs at Monroe Elementary School: January 13 - March 9, 2016 Jan uary 13 - May 27, 2016 April 13 - May 25, 2016
    Actions
    Motion Passed with a motion by Lance James and a second by Evelyn Gonzalez. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Financial Impact
    Estimated cost is $18-$20 per student per class session not to exceed $8,520 of supplemental and concentration grant monies

    Outcome

    Motion Passed

    Attachments

  66. K.4.b Addendum to the Memorandum of Understanding between San Leandro Unified School District and East Bay Agency for Children (EBAC) for 2015-2016 school year Passed 📎 1

    Recommended motion

    Staff recommends the approval Memorandum of Understanding addendum.

    Rationale
    This addendum to the Memorandum of Understanding between San Leandro Unified School District and East Bay Agency for Children (EBAC) is for the purpose of continuing support services for 1 SLUSD student through March 31, 2016.
    Actions
    Motion Staff recommends the approval Memorandum of Understanding addendum. Passed with a motion by Lance James and a second by Diana Prola. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Financial Impact
    Special education funds

    Outcome

    Motion Passed

    Attachments

  67. K.4.c 2015-2016 Non-Public School/Agency Contracts Passed 📎 2

    Recommended motion

    Staff recommends the approval of non-public school/agency contracts for the 2015-2016 school year.

    Rationale
    New non-public school placement and agency contracts for the school year 2015-2016. Student DOB COST LOCATION # 1 08/21/00 $22,794.15 Spectrum Center (changed location) # 2 10/19/13 $3,140.00 Starfish Therapies Total $25,934.15
    Actions
    Motion Staff recommends the approval of non-public school/agency contracts for the 2015-2016 school year. Passed with a motion by Lance James and a second by Monique Tate. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Financial Impact
    $ 25,934.15 - Special Education funds

    Outcome

    Motion Passed

    Attachments

  68. K.4.d Memorandum of Understanding Between San Leandro Unified School District and Asian Community Health Services Passed 📎 1

    Recommended motion

    Staff recommends approval of the contract for services.

    Rationale
    Memorandum of Understanding (MOU) Between San Leandro Unified School District (SLUSD) and Asian Community Health Services (ACMHS). This MOU is entered into by and between SLUSD and ACMHS for the purpose of providing Substance Abuse and Prevention Treatment Services for SLUSD students during the 2015-2016 school year. MOU is effective as of December 7, 2015. Services will be provided at San Leandro High School and the Fred T. Korematsu 9th Grade Campus.
    Actions
    Motion Passed with a motion by Monique Tate and a second by Lance James. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Financial Impact
    SLUSD will have no financial obligation for the services provided by ACMHS.

    Outcome

    Motion Passed

    Attachments

  69. K.4.e Educator Effectiveness Block Grant Passed 📎 1

    Recommended motion

    Staff recommends that the Board approve the Educator Effectiveness Block Grant Three-Year Plan.

    Rationale
    The 2015 Budget Act included $500 million in one-time money called the “Educator Effectiveness Block Grant.” Educator Effectiveness funds were distributed to Local Education Agencies (LEAs) based on the number of certificated staff reported in the California Longitudinal Pupil Achievement Data System (CALPADS) and funds are specifically to be used for professional development, coaching, and support services over three fiscal years. The funds must be spent by June 30, 2018. As a condition of receiving the funds, a spending plan must be presented at a public meeting of the governing board and then approved at a subsequent public meeting of the governing board.
    Actions
    Motion Staff recommends that the Board approve the Educator Effectiveness Block Grant Three-Year Plan. Passed with a motion by Lance James and a second by Monique Tate. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .

    Outcome

    Motion Passed

    Attachments

  70. K.4.f Contract of services between Magnitude.io and San Leandro Unified School District for after school STEAM program at San Leandro High School Passed 📎 1

    Recommended motion

    Staff recommends approval of contract of services with Magnitude.io and San Leandro Unified School District.

    Rationale
    This partnership is with San Leandro Unified School District and Magnitude.io for an after school STEM program at San Leandro High School. The Magnitude program is a modular, multi-disciplinary framework that is guided by the Next Generation Science Standards 3-dimensions architecture. This includes Science and Engineering Practices (SEPs), Disciplinary Core Ideas (DCIs), and Crosscutting Concepts (CCCs) for grades 7 and 8 in this first year cohort, and engagement and support for grades 9-12 under the same NGSS framework. The Magnitude.io framework is based upon the following science and engineering practices: Asking questions and defining problems Planning and carrying out investigations Analyzing and interpreting data Developing and using models Constructing explanations and designing solutions Engaging in argument from evidence Using mathematics and computational thinking Obtaining, evaluating, and communicating information San Leandro High School Students will participate in the program after school beginning February 25, 2016 through May 31, 2016. The project will culminate with the launch of a high-altitude balloon on May 25, 2016 at San Leandro High School.
    Actions
    Motion Passed with a motion by Monique Tate and a second by Evelyn Gonzalez. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Financial Impact
    $7,425 Supplemental and Concentrations Grant Monies; LCAP Item 1.27

    Outcome

    Motion Passed

    Attachments

  71. K.4.g Contract of services between Magnitude.io and San Leandro Unified School District at John Muir Middle School and Bancroft Middle School for GATE after school enrichment program Passed 📎 2

    Recommended motion

    Staff recommends the approval of contract of services with Magnitude.io

    Rationale
    This contract of services is to support the after school programming at John Muir and Bancroft Middle School for students who are GATE identified. The Magnitude program is a modular, multi-disciplinary framework that is guided by the Next Generation Science Standards 3-dimensions architecture. This includes Science and Engineering Practices (SEPs), Disciplinary Core Ideas (DCIs), and Crosscutting Concepts (CCCs) for grades 7 and 8 in this first year cohort, and engagement and support for grades 9-12 under the same NGSS framework Up to 32 students will participate in the program this spring after school through the John Muir Middle School GATE initiative on campus Tuesday afternoons beginning in February 23, 2016 through May 26, 2016. The project will culminate with the launch of a high-altitude balloon on May 25, 2016. Up to 32 students will participate in the program this spring after school through the Bancroft Middle School GATE initiative at the Barbara Lee Center Thursday afternoons beginning in February 25, 2016 through May 31, 2016. The project will culminate with the launch of a high-altitude balloon on May 25, 2016.
    Actions
    Motion Passed with a motion by Diana Prola and a second by Evelyn Gonzalez. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Quick Summary / Abstract
    This contract of services is to support the afterschool enrichment program for GATE identified students at John Muir and Bancroft Middle School. The Magnitude.io program is a modular, multi-disciplinary framework that is guided by the Next Generation Science Standards 3-dimensions architecture. This includes Science and Engineering Practices (SEPs), Disciplinary Core Ideas (DCIs), and Crosscutting Concepts (CCCs) for grades 7 and 8 in this first year cohort, and engagement and support for grades 9-12 under the same NGSS framework Up to 64 middle school GATE identified students for our two campuses will participate in the program this spring after school. The program will culminate with the launch of a high-altitude balloon on May 25, 2016.
    Financial Impact
    $9,850 Supplemental and Concentration Grant Monies; LCAP items 1.12 and 1.27

    Outcome

    Motion Passed

    Attachments

  72. K.4.h Approval of new AP courses, AP European History and AP Economics, and approval of course revision for Fitness Course 1 Passed 📎 3

    Recommended motion

    Staff recommends the approval of new courses AP European History and AP Economics and course revision Fitness Course 1.

    Rationale
    The Department of Teaching, Learning, and Educational Equity is working with secondary school teachers and administrators to realign our current courses. We developed new courses to reflect shifts towards Common Core State Standards, Next Generation Science Standards, 21st Century Learning Skills, and A-G eligibility requirements. These new courses and course revisions reflect the on-going course alignment work the district is conducting.
    Actions
    Motion Staff recommends the approval of new courses AP European History and AP Economics and course revision Fitness Course 1. Passed with a motion by Diana Prola and a second by Evelyn Gonzalez. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Quick Summary / Abstract
    The Department of Teaching, Learning, and Educational Equity is working with secondary school teachers and administrators to realign our current courses and develop new courses to reflect shifts towards Common Core State Standards, Next Generation Science Standards, 21st Century Learning Skills, and A-G eligibility requirements. These new courses, course revisions, reflect the on-going course alignment work the district is conducting.
    Financial Impact
    Pending

    Outcome

    Motion Passed

    Attachments

  73. K.4.i Approve Stipend Agreement with Partnership for Children & Youth Passed 📎 1
    Rationale
    Partnership for Children and Youth's Expanded Learning 360/365 program is a professional learning community with other school districts to gather information and share practices that strengthen the coordination of socio-emotional learning across after school, summer and the school day. ­ The learning community offers direct planning support from to the district and its partners to build coherent policies and practices around socio-emotional learning within the district, at school sites, and across after school, summer and the school day. SLUSD is participating as a district member of the professional learning community to learn how to improve the district's extended learning spaces.
    Actions
    Motion Passed with a motion by Lance James and a second by Diana Prola. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .
    Financial Impact
    District will receive a $20,000 stipend for participating in the program and for implementation of the 2016 action plan upon completion.

    Outcome

    Motion Passed

    Attachments

  74. L INFORMATION ITEMS
  75. L.1 General Services
  76. L.1.a Enrollment update 2/1/2016 📎 1
    Rationale
    Enrollment update 2/1/2016

    Attachments

  77. M FUTURE BUSINESS
  78. M.1 Consensus Items
    Minutes
    Several Board Trustees made suggestions for consensus items, which will be added to the consensus template for review at the next Board meeting
  79. N ADDITIONAL SUGGESTIONS AND COMMENTS FROM BOARD MEMBERS
    Minutes
    All Board Trustees present provided input on various topics. The Board suggested the audience share a moment of silence in the loss of Trustee Tate's mother-in-law, Jean Brown.
  80. O BOARD OF EDUCATION FUTURE MEETINGS
  81. O.1 Special Board Meeting - February 22, 2016
  82. O.2 Regular Board Meeting - March 8, 2016
  83. P ADJOURNMENT Passed
    Rationale
    *Regular Board Meetings shall be adjourned at 10:30 p.m. unless extended to a specific time determined by a majority of the Board. The meeting shall be extended no more than once and may be adjourned to a later date. (Board Bylaw 9323).
    Minutes
    The Board Meeting adjourned at 8:07pm
    Actions
    Motion Passed with a motion by Lance James and a second by Diana Prola. | Vote: Yes Evelyn Gonzalez .; Yes Lance James .; Yes Diana Prola .; Yes Vince Rosato .; Absent Leo Sheridan .; Yes Monique Tate .

    Outcome

    Motion Passed

Contracts and agreements on this agenda 18

Extracted automatically from the agenda items and attachments; amounts appear only when printed in the documents.

ItemVendor / partyDescriptionAmount
J.4.a Culture Shock Dance, OaklandProvide hip hop dance physical fitness with history of hip hop for K-5 students$ 1,300.00
J.4.a Charlie ChinPresentation on the history of Asian Immigration to San Francisco in early 1900s$ 300.00
J.4.a Brian AgardDJ Consultant Agreement for Muir Middle School$ 375.00
J.4.a Play Well Tek-nologiesProvide 9 week after-school Lego engineering classes$3500 site cost $166.50/stud ent Parent covers $70/student; Site covers $96.50 per student plus scholarships
J.4.a Meghan McGovernMusic Director for Mary Poppins Play$1600 paid in two installments
J.4.f Davis Street Family Resource CenterStaff recommends approval of the memorandum of understanding.$20,000
J.4.g AVID College Readiness System Services and ProductsStaff recommends approval of Agreement between AVID College Readiness System Services and Products and the San Leandro Unified School District for the period July 1, 2016 to June 30, 2017.$19,112
K.2.a PG&EApprove request for temporary license for use of portion of land- End of Cary Drive, San Leandro, Ca.; County of Alameda, State of California (APN 077-0470-001-03); PG&E Job Number: PM30969553—
K.2.b Harris & AssociatesAs part of the Measure M implementation processes, the District conducted a SOQ/RFQ/RFP qualification based selection process for Program Management (PM) firms. Harris & Associates received the highest overall...$2,060,000
K.3.a SLEDApprove the memorandum of understanding with SLED.—
K.4.a MonroeProvide 3 weekly after school enrichment programs at Monroe Elementary School: January 13 - March 9, 2016 Jan uary 13 - May 27, 2016 April 13 - May 25, 2016$8,520
K.4.b East Bay AgencyStaff recommends the approval Memorandum of Understanding addendum.—
K.4.c Spectrum CenterStaff recommends the approval of non-public school/agency contracts for the 2015-2016 school year.$186.00
K.4.c Starfish TherapiesStaff recommends the approval of non-public school/agency contracts for the 2015-2016 school year.$3,140.00
K.4.d Asian Community Health ServicesStaff recommends approval of the contract for services.—
K.4.f Magnitude.ioStaff recommends approval of contract of services with Magnitude.io and San Leandro Unified School District.$7,425
K.4.g Magnitude.ioStaff recommends the approval of contract of services with Magnitude.io$9,850
K.4.i PartnershipPartnership for Children and Youth's Expanded Learning 360/365 program is a professional learning community with other school districts to gather information and share practices that strengthen the coordination of...$20,000

Document